LEGEND NOTES
1 2 3 4 5 6 7
N 6° 1. IDENTIFICATION MARK 1. FOR GENERAL NOTES, REFER TO DRAWING NO DD-G22-13230-0101.
PLANT 43000 : T.O.C EL+100.100 2. WHSB (WELDED HEADED STUD BOLT)
A 63° NORTH 71.24124°
9000 7000 6000 6000 6000 9000
: T.O.C EL+100.175 1.1 WHSB MATERIAL AS PER AWS D1.1 SECTION 7, TYPE B
DIMENSTION AWS D1.1 SECTION 7
A
TRUE 1.2 PLATES ASTM A36 OR EQUIVALENT
MECCA 6560 1950 490 4500 2500 3560 1950 490 4500 1500 2500 6500
NORTH 3. SURFACE COATING (HOT DIP GALVANIZE)
36-W-001_K-001C
36-W-001_K-001A
36-W-001_K-001B
MATERIAL SURFACES OF EMBEDDED PLATES SHALL BE REFERRED TO
12.75876°
DB-000-13202-0001-001 CONCRETE WORKS GENERAL NOTES.
4. AIR ESCAPE HOLE IS PROVIDED ONLY WHEN THE EMBEDDED PLATE IS
EL+100.175 PLACED ON TOP OF A HORIZONTAL SURFACE OF CONCRETE.
T.O.C(TYP) 5. MATERIAL STRENGTH ARE AS FOLLOWS
PLATE YIELD STRENGTH = 250MPa
WHSB YIELD STRENGTH = 350MPa
CL OF
CL OF
CL OF
WHSB TENSILE STRENGTH = 450MPa
B PREVAILING
WIND
B
A 6. ALL FIELD WELDS FOR GALVANIZED STEEL COMPONENTS SHALL BE
TOUCHED-UP IN ACCORDANCE WITH SS-000-13A00-0001
(GENERAL SPECIFICATION FOR PAINTING).
7. WELDING PROCEDURES AND WELDING OPERATOR QUALIFICATION
3192
3592
04
TESTS SHALL BE WITNESSED BY A THIRD PARTY INSPECTION AGENCY
4300
4300
4300
351 SEE DWG NO. AND APPROVED BY CONTRACTOR.
5590
1300 6400 6600 6400 3600 6400 3300 DB-000-13202-0016-001 8. WELDING PROCEDURES AND WELDING OPERATOR QUALIFICATION
FOR CONCRETE PAVED AREA TESTS SHALL BE WITNESSED BY A THIRD PARTY INSPECTION AGENCY
800
3200 3200 3200 3200 3200 3200 9. FILLET WELD
EMBEDDED PLATE
9125
C 200 251 C
760 635
760 635
9.1 DETAIL-1 IS APPLICABLE WHEN STUD WELDING EQUIPMENT
PS1 PS1 IS NOT AVAILABLE.
18250
9900
9900
9900
D EL+100.275 EL+100.275 EL+100.275 SECTION 7.5.5 OF AWS D1.1. D
1625
MEMBER LIST
DIVISION MARK SIZE REMARK
4000
800
H.P.P
VN2158-203-A-DGN-0010 GENERAL ARRANGEMENT DRAWING FOR 36-W-001_K-001A/B/C
3500
LOCAL SUPPORT
(BY PIP) CONCRETE PAVING
2467
351 DL-G22-133A0-0101~0107 G22SH010 - ARCHITECTURAL DRAWINGS
2067
(BY CIVIL)
CS-G22-133A0-0101 G22SH010 - STRUCTURAL CALCULATIONS
DD-G22-133A0-0115 G22SH010 - REMOVABLE ROOF DETAILS
B DD-G22-133A0-0113,0114 G22SH010 - STEEL CONNECTION DETAILS (1),(2)
800 101.5
DD-G22-133A0-0104 G22SH010 - T.O.G EL+107.820 & CRANE RUNWAY GIRDER FRAMING PLAN
800 127
800 300
C DD-G22-133A0-0103 G22SH010 - T.O.G EL+106.532 FRAMING PLAN
501.5
501.5
527
700
DD-G22-133A0-0102 G22SH010 - C.O.S EL+102.650 FRAMING PLAN
LADDER FOUNDATION DD-G22-133A0-0101 G22SH010 - STEEL COLUMN LOCATION PLAN
(TYP) EL+100.100
EL+100.100 733 733 DD-G22-13230-0106 G22SH010 - COMPRESSOR FOUNDATION DETAILS
3900 167 T.O.C
G T.O.C (TYP)
LADDER FOUNDATION DD-G22-13230-0103~0105 G22SH010 - FOUNDATION & PEDESTAL REINF DETAILS (1)~(3) G
200
DD-G22-13230-0101 G22SH010 - FOUNDATION LOCATION PLAN
H 2 4 2 4 REFERENCE DRAWINGS H
1340 1340
290 290
850 850
A 425 425
A 425 425
750 750 04 31-Jul-23 ISSUED FOR CONSTRUCTION J.S.LEE D.Y.KIM J.O.NOH
A 375 375
A 375 375
03 16-Dec-22 ISSUED FOR CONSTRUCTION J.S.LEE D.Y.KIM J.O.NOH
150 275 275 150 50CL 750 50CL 02 25-Nov-22 ISSUED FOR CONSTRUCTION J.S.LEE D.Y.KIM J.O.NOH
EMBEDDED PL
700x900x20T 150 225 225 150 50CL 650 50CL 01 29-Jun-22 ISSUED FOR CONSTRUCTION J.S.LEE S.H.LEE J.O.NOH
50CL
EMBEDDED PL
8365
8365
7730
7730
600x600x20T
50CL
00 15-Feb-22 ISSUED FOR INFORMATION J.S.LEE S.H.LEE J.O.NOH
375 150
I I
525
525
375
375
REVISIONS
B A B A B B B B
1050
1050
650
950
750
750
375
375
525
525
50CL
150
1-D12
4-DIA25 AIR ESCAPE HOLE (NOTE 4) 1-D12 D12 @150 (T) 9-DIA20 WHSB (NOTE 2,5)
9-DIA20 WHSB (NOTE 2,5)
"PS2" EMBEDDED PLATE "PS2" PEDESTAL REINF DETAIL BASRAH REFINERY UPGRADING PROJECT
"PS1" EMBEDDED PLATE "PS1" PEDESTAL REINF DETAIL
J CONTRACTOR JOB CODE J
0-8494-20-0000
D12 @150 (T) D12 @150 (T)
EL+100.200 EL+100.200 EQUIPMENT LIST
T.O.C
D12 @150 (T)
T.O.C
D12 @150 (T) (G22SH010)
200 20
200 20
200
"PS1" PIPE SUPPORT PAD REINF DETAIL "PS2" PIPE SUPPORT PAD REINF DETAIL 5360/B/2020
2 SCALE 1:30
3 SCALE 1:30 SCALE 1:100 METERS
PROJECT DWG NO. REV.
DD-G22-13230-0102 04
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
This document and any attachment is confidential and is the property of JGC HOLDING CORPORATION, its affiliated undertakings and/or its subcontractor, Hyundai Engineering & Construction Co., Ltd. If you are not an authorized person by written permission of JGC HOLDING CORPORATION, its affiliated undertakings and/or its subcontractor, Hyundai Engineering & Construction Co., Ltd., you should not copy, trace, photograph, reproduce or use it for any purpose nor disclose its contents to any other person.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
NOTES
1. ALL DIMENSIONS ARE IN MILLIMETERS.
STAIR FOUNDATION LADDER FOUNDATION 4. THE PAVING SURFACE SHALL BE ROUGHENED AND CLEANED PRIOR
TO POURING OF CONCRETE.
50mm COVER
2-M16 CHEMICAL ANCHORS (HILTI HIT-RE 500 V3 WITH FOR PAVED AREA
HIGH POINT(HP) IS IN ACCORDANCE WITH DB-000-13102-0001-001
2-M16 CHEMICAL ANCHORS (HILTI HIT-RE 500 V3 WITH
(TYP)
HAS/HIT-V THREADED ROD (HOT-DIP GALVANIZED) (NOTE 6)) AS FOLLOWS.
HAS/HIT-V THREADED ROD (HOT-DIP GALVANIZED) (NOTE 6)) (1) PROCESS, UTILITY AND NON-PROCESS BUILDING AREAS :
50mm COVER
100
EL +100.000(M) = MSL +2.700(M)
(TYP)
(2) TANKAGE, SS132KV/MSS AND SLUDGE STORAGE AREAS :
270
EL +98.800(M) = MSL +1.500(M)
200
C 550
(3) RAILWAY AREA : EL +98.800(M) = MSL +1.500(M) (TO BE DETERMINED C
BY RAILWAY CONTRACTOR)
100
280
(4) FLARE AREA : EL +98.800(M) = MSL +1.500(M) AROUND EQUIPMENT,
OTHER AREA SLOPE DOWN TO
FOR PAVED AREA 50mm COVER EL +98.100(M) = MSL +0.800(M)
4-D12 DOWEL BARS (TYP)
(ONE EACH CORNER WITH 50mm COVER) 8. STAIR AND LADDER FOUNDATION SHALL BE REINFORCED WITH WWF
FOR PAVED AREA 50mm COVER (WELDED WIRE FABRIC) 150x150xØ5 AS PER ASTM A1064/ A1064M,
ASCENDING SIDE
4-D12 DOWEL BARS (TYP) UNLESS OTHERWISE SPECIFIED ON THE DESIGN DRAWINGS.
(ONE EACH CORNER WITH 50mm COVER) ASCENDING SIDE WWF SHALL BE FURNISHED IN SHEETS.
E E
2-M16-A1-L495(TYP) 2-M16-A1-L495(TYP)
(SEE NOTE 7)
(SEE NOTE 7)
100~250
100~250
WWF PJ=100 WWF PJ=100
(SEE NOTE 8) (SEE NOTE 8)
395
FGL FGL
(MIN)
(MIN)
300
300
CONCRETE CONCRETE
(GRADE 25) (GRADE 25)
4-Ø20 HOLES, DEPTH = 95 4-Ø20 HOLES, DEPTH = 95 04 17-Feb-23 ISSUED FOR CONSTRUCTION S.K K.U K.U
HILTI HIT RE-500 V3 HILTI HIT RE-500 V3 03 12-Apr-22 ISSUED FOR CONSTRUCTION K.S S.K K.U
02 01-Mar-22 ISSUED FOR CONSTRUCTION T.S S.K K.U
(SEE NOTE 7)
(SEE NOTE 7)
100~250
100~250
01 27-May-21 ISSUED FOR CONSTRUCTION T.S S.K K.U
WWF
(SEE NOTE 8) WWF 00 01-Apr-21 ISSUED FOR REVIEW T.S S.K K.U
PJ=65 (SEE NOTE 8) PJ=65
REV DATE ISSUE PURPOSE PREP'D CHK'D APP'D
I REVISIONS
I
TOC HP+100(mm) TOC HP+100(mm)
(NOTE 7) (NOTE 7)
95
CONCRETE PAVEMENT 4-D12 DOWEL BARS CONCRETE PAVEMENT 4-D12 DOWEL BARS
(ONE EACH CORNER WITH 50mm COVER) (ONE EACH CORNER WITH 50mm COVER) BASRAH REFINERY UPGRADING PROJECT
J CONCRETE (GRADE 25)
4-Ø 16 HOLES, DEPTH = 75
CONCRETE (GRADE 25)
4-Ø 16 HOLES, DEPTH = 75 CONTRACTOR JOB CODE J
ROUGHED SURFACE HILTI HIT RE-500 V3 ROUGHED SURFACE HILTI HIT RE-500 V3 0-8494-20-0000
(SEE NOTE 4) (SEE NOTE 4)
STANDARD DRAWING
FOR
STAIR AND LADDER FOUNDATION
FOR CONCRETE PAVED AREA FOR CONCRETE PAVED AREA
D M S3 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
-
J Feb-
17-
2 0 2
D
This document and any attachment is confidential and is the property of JGC HOLDINGS CORPORATION and/or its affiliated undertakings. If you are not an authorized person by written permission of JGC HOLDINGS CORPORATION and/or its affiliated undertakings, you should not copy, trace, photograph, reproduce or use it for any purpose nor disclose its contents to any other person.
1/1
EN PRINTE
LED WH
ROL
NCONT