You are on page 1of 18

Manufacturer of Electric Wire Rope Hoist: Clescrane

CH Series Electric Wire Rope Hoist (Double Girder)

Address: Room 902, Building 6, No. 26 Dongqing Street, Zhengzhou, Henan, P.R.China; P.C.: 450000 INSTALLATION, MAINTENANCE
Tel: 0086-371-5532 8269 Ext.1002
Email: inquiry@clescrane.com
AND SERVICE MANUAL
Website: www.clescrane.com

WWW.CLESCRANE.COM
5 Operating manual...........................................................................................17
5.1 Pendant control .....................................................................................................................................17
5.2 Loading type ..........................................................................................................................................17

6 Inspection and repair.......................................................................................17


6.1 Inspection...............................................................................................................................................17
6.2 Inspection Plan.......................................................................................................................................18
1 General description.........................................................................................03
6.3 Maintenance and replacement of wire rope ..........................................................................................19
1. 1 Manual use guide..................................................................................................................................03
6.4 Cleaning and lubrication of rope guide...................................................................................................19
1.2 Rational utilization..................................................................................................................................03
1.3 Operation specification...........................................................................................................................03
1.4 Quality guarantee...................................................................................................................................03
1.5 Other related information.......................................................................................................................03 7 Faults handling................................................................................................20

8 File List............................................................................................................21
2 Safety Specification........................................................................................04
2.1 General description................................................................................................................................04
2.2 Safety operation manual.........................................................................................................................04 9 Certificate for Product.....................................................................................22
2.3 Danger and damage...............................................................................................................................05
2.4 Safety working time................................................................................................................................05
10 Quality inspection report...............................................................................23

3 Technical descriptions.....................................................................................07 11 Eligible Certificate.........................................................................................24


3.1 Structure and components.....................................................................................................................07
3.2 Technical Data........................................................................................................................................13
12 Product information.......................................................................................25
3.3 Lubrication..............................................................................................................................................14
12.1 Wire rope hoist maintenance form........................................................................................................25
12.2 Wire rope hoist yearly inspection record .............................................................................................26
4 Assembly and Commissioning........................................................................15
4.1 Preparation for Assembly.......................................................................................................................15
13 Electrical dravings.........................................................................................27
4.2 Hoist lifting..............................................................................................................................................15
4.3 Check and Commissioning.....................................................................................................................15
China Lifting Equipment Specialist

1 General description Wire rope intertwined work should be carry by well trained professionals. 7. Not qualified personnel should not do the
Wire rope bump, broken stocks, or other damage Study and remember the safety rules and regulations installation, maintenance and operation.
1. 1 Manual use guide
Reverse operation directly Installation, operation and service manual should be 8. Users must be sure that an install and
Relevant personnel should carefully read this
reserved by personnel. maintenance personnel is familiar with instructions
installation, operation and service manual before Deliberately operation to trigger the emergency switch
provided by the manufacturer.
commissioning CLESCRANE electric wire rope hoist. operation refer to chapter 2.2 Safety operation manual )
This manual should be put on the place where the 9. For the need of safe operation, the user must
operator can read any time. Electric hoist is a tool for ensure that the instructions can be easy understood
1.3 Operation specification by operator.
lifting and transporting load, there will be many potential 2 Safety Specification
dangers in operation process. Thus the operator need Design, manufacture and operation of CLESCRANE 10. Operating personnel must carefully read the
electric wire rope hoist is carried out with reference to 2.1 General description
carefully read content in chapter 2 safety standards and instructions and operation procedure.
chapter 6 tests and maintenance. This manual also the current European and German standard, and not Operation, service and maintenance personnel must be
11. Users must be sure that the hoist installation on
including danger reminds warning and safety lower than the requirements of ISO international carefully read and be familiar with this manual contents
estimated impact load of the structure or hanging
recommendations, and using the following words and standard. In the process of operation, users must be before work starting. Users have the duty to take certain
beam.
signs to indicate: strictly referred to the related parameters indicated in the measures to ensure the safety of working environment,
table. (Chapter 9.1) including but not limited to: 12. User should ensure that wire rope hoist
Notice installation, positioning or fixed are reliable, so that
Release the contents of the operation manual.
Will cause harm to human body. Do not conform to the will not due to accidental impact or other damage.
1.4 Quality guarantee Undertake the necessary testing before first use or after the
manual requirements. May cause danger to themselves 13. The user should ensure that there will not occur
or others. Suggest reasonable and effective use of wire Due to unreasonable use or untrained operators’ big maintenance.
obliquely pull when on load.
rope hoist. improper operation, cause damage on crane, hoist or Regularly testing
other equipment, CLESCRANE does not undertake 14. User and the operator shall ensure that it will not
Maintenance & testing result should record in maintenance exceed the rated load.
quality assurance and compensatory obligations. We
1.2 Rational utilization list.
only assume corresponding obligations to direct users 15. When several hoists lifting the same load, user
CLESCRANE electric wire rope hoist is used for vertical and accept their quality claim meantime. should ensure that each hoist are fixed correctly,
lifting and horizontal load of logistics equipment, safe Notice 2.2 Safety operation manual make each hoist’s load will not exceed its rated load.
working load (SWL) are clearly labeled in the Notice 16. Every time before shifting, the operator must
Complete adjust before operation
maintenance schedule and nameplate of equipment. At check whether the emergency braking device is in
User should ensure that the operating and maintenance
the same time in the process of operation, it must be good condition.
personnel strictly implement the relevant provisions of the
strictly conform to the FEM working group, safe working (1)The lifting height limiter bottom switch, according to
ministry of labor and security in the work process, the 17. When the operator found that wire rope hoist has
time and start times. the adjustment of installation site (recommended at the
following information is very important to ensure the safety obvious flaws (running gear, wheel, electric and
CLESCRANE wire rope hoist can be installed on the place about 500 mm from the ground), it is strictly
of the hoist and its operation and maintenance personnel. bearing structure, etc.), it must be fixed immediately.
fixed structure, also can be run on the suitable rail. All prohibited that the hook touch the ground or platform. It
1. The user must confirm the electric hoist and its bearing If the operator does not have the skills or the
design of structural components which bearing wire rope is forbidden that the hook operation beyond lifting height.
structure have professional inspection and testing before the maintenance work is not in the scope of their duties,
hoist should be in accordance with the corresponding (2)Lifting weight limiter: please check calibrate again must immediately stop operation and inform the
first trial run and after the major repair.
specification and must in full consideration of working when crane acceptance. related maintenance staff.
environment and hoist itself weight. Design and 2. The user must confirm the electric hoist and its bearing
(3)If the user replace, dismantle any parts or do not use 18. The user should ensure that there will be no load
manufacture of hoist is based on indoor condition structure have professional inspection and testing at least
CLESCRANE original accessories , without permission hanging on the hook when the hoist
without any corrosive medium environment, its operating once a year. Users also need have professional inspection
or not in accordance with the requirements of this
temperature range from - 10 ℃ to + 40 ℃. and testing on electric hoist according to usage and is not in use.
manual , the quality guarantee will not apply any more.
Highertemperature will reduce hoist safety working life. company internal requirements. 19. Personnel should not stand under the lifting
For security , please use the CLESCRANE original
The equipment will not be able to work when accessories, and according to the requirements of the 3. In the process of regular inspection and testing, users objects.
environment temperature is more than + 80 ℃ Operating user manual for wire rope hoist for maintenance and must pay attention to calculation of wire rope hoist’s theory 20. The operator shall ensure that the load can be
in the abnormal operating conditions or working maintenance, only in this way can ensure the product safe use time. safe lifting and lifting area no idle personnel, and
conditions must obtain manufacturer's permission first. service life. 4. Users must save all result and record about wire rope once received signal it can be start lifting load.
Abnormal operation are including but not limited to the hoist inspection and testing. 21. If it cannot observe the whole lifting movement
following condition: 5. Wire rope hoist test results must be recorded on the wire from the control platform, operator must be careful to
1.5 Other related information
SWL load exceed safe working load rope hoist annual inspection record. ensure there won't be any hurt to other people during
Product quality certificate should be attached to the
Obliquely pull when on load 6. Wire rope hoist should have personnel operation. The operation process.
maintenance plan. (Chapter 9.2) Production date should
Lifting or transport personnel be marked on the product nameplate. operator should fully grasp the relevant knowledge about 22. The operator shall not be allowed to leave the
installation, maintenance and operation instructions. control platform when the lifting load is hung up.
Start frequently To ensure safe and effective use of wire rope hoist, we
suggest that hoist installation, operation and service

03 WWW.CLESCRANE.COM 04
China Lifting Equipment Specialist

23. If the operator has to leave the control platform when parts and products of moving or rotating parts. Listed FEM has relevant standards about hoist’s accidents caused by material fatigue and aging.
the lifting load is hung up, the user must protect the load below may result in serious harm and property damage. The following form is referred during designing of hoists.
at the bottom of the danger zone. Move encloser when it is not allowed.
24. If the operator has to leave the control platform when Incorrect use
the lifting load is hung up, the operator must protect the
Improper operation Work duty FEM (ISO)
load at the bottom of the danger zone.
Inadequate maintenance and protection Usage period
25. Hook load is prohibited to lifting people, and the 1Bm(M3) 1Am(M4) 2m(M5) 3m(M6) 4m(M7)
electric hoist can never be used as lifting mechanism for Not carefully read safety instruction can lead to hurt
manned elevator. even death Light 3200 6300 12500 25000 50000
26. Users must not use steel wire rope electric hoist If machine is operated by persons without enough
Medium 1600 3200 6300 12500 25000
lifting casting material. training can lead to damage to body. Load
Operators and maintenance personnel must get enough spectrum heavy 800 1600 3200 6300 12500
27. Electric hoist shall not be used to lift load that may
be stuck or plug. training
Very heavy 400 800 1600 3200 6300
28. The lifting limit is not allowed to use repeatedly as Operators are not allowed to wear inattentive cloths, stay
travel switch. long hair or wear jewelry.

29. The user cannot continue to use the electric hoist Operators who are smoking or drunk cannot operate
which has reached the theory safe use time. machine. Damaged parts of machine must be changed 2.4.1 Estimation of safety working time
as soon as possible. Besides proof-explosion products,
30. If still want to use the electric hoist which has Experienced service persons should timely check and record the service conditions of wire rope hoists,
other products cannot used in situation with danger of
reached the theory safe use time, please refer to chapter then estimate the remaining safety working time according to standard.
explosion. Operators must strict follow operation manual
2.4.4.
to operate step by step.
31. Maintenance personnel should cut off the main 2.4.2 Solutions to the coming limit of safety working time
Using improper or forbidden tools may lead damage to
power supply before maintenance and installation work. 1. Stopping using wire rope hoists
products. In order to make sure operators’ safety, they
must keep safety distance with machine. 2. If insist in keeping using them, professional personals should provide the following
2.3 Danger and damage Using flame around inflammable materials will be materials:
This product is mainly used for industrial control system. dangerous. Operators must escape this kind of wrong (a) Professional association confirms hoists can be used continually.
There will be some danger in the operation of internal operation.
(b) Provide checking records and reports about continually using hoists
(c)User accepts checking records and reports.

2.4 Safety working time


The safety working time of hoist depends on working duty and load spectrum (FEM 9.511).

The load spectrum is as bellow:

Light Duty Medium Duty Heavy Duty Very Heavy Duty


Occasionally full-load Occasionally full-load Repeat full-load Nearly always full-load
Usually light-load Usually light-load Usually typical-load Very heavy duty fixed loading
Small type fixed-load Generally fixed-load Heavy duty fixed loading

Load% Load% Load% Load%

100% 100% 100% 100%


73% 80%

47% 40%
40%
20%
10%
10 40 50 17 17 17 50 50 50 90 10
working time % working time % working time % working time %

05 WWW.CLESCRANE.COM 06
China Lifting Equipment Specialist

3 Technical descriptions
3.1 Structure and components
3.1.1 Configuration of wire rope

Double-speed (variable-frequency) motor has six ambient temperature not higher than 40°C and
(three) thermistors or sensors. The insulation level of altitude not higher than 1000m. When
1 2 motor is F. When the temperature is up to 150℃, the environment elements change, motor’s
8 rmistors or sensors will outage power of motor and characteristics will change as well.
when temperature is down to standard working Lifting motor integrates electromagnetic disc
3 temperature, the power will be on again. brake (see figure below). When hoist is in the
The setting of lifting motor’s nominal parameter condition of stop or out-of power, electromagnetic
should depend on condition that working operating disc brake will automatic closing.
4

air gap
5 a

Min. rotor Thickness

1. Hoisting transmission 2. Lifting motor 3. drum device 4. trolley frame


5.trolley traveling mechanism 6. hook 7. wire rope 8. Cabinet of hoist The IP grade of standard electromagnetic disc brake is IP54, the highest IP grade can be up to IP56. Meanwhile,
electromagnetic disc brake can alternatively install manual release lever. Brake use dust proof design, which doesn’t
need other maintenance during normally operation.
Attention!
It is imperative to timely check brake clearance and thickness of brake disc. Specific reference values of checking and
3.1.2 Lifting motor
adjustment are as below:
The standard lifting motor is double-speed motor or variable-frequency motor with disc brake.

type 08 10 13 15 17 20 23 26 30
1 6
7 normal gap 0.2 0.2 0.3 0.3 0.3 0.4 0.4 0.5 0.5
1. cover of fan
2 2. fan
maximum gap 0.6 0.7 0.8 0.9 1.0 1.1 1.1 1.2 1.2

5 3. breaker
minimum thickness
3 4. stator 4.5 5.5 7.5 9.5 11.5 12.5 14.5 16.5 16.5
of brake disc
5. rotor
6. junction box
4 Attention!
7. cover of motor
Checking and adjustment should be done by professional maintenance personnel. During this period, the hoist must be
no-load and the main power must be cut.

07 WWW.CLESCRANE.COM 08
China Lifting Equipment Specialist

3.1.3 Hoisting transmission


Drum is driven by gearbox. The output shaft is designed with involute spline so as to achieve best transmission function. <
3.1.4 Dispositivo de tambor

1xd
4
1.left plates
5
The design and lubrication of gearbox should strict follow FEM Standard, and it doesn’t need any other maintenance 2. connecting rod
during safety working time if it is used normally. Gearbox has been filled up with lubrication before shipment. Please pay 3. drum

6xd
d
attention to type and quantity of lubrication oil listed in below form. Please make sure cover of gearbox are absolutely 4. rope guide
clean if you need to change lubrication oil. 5. right plates

If hoist is used in gelid environment, the lubrication oil must be changed into synthetic grease.

Drum is made of seamless tube, and its surface is 5xd


processed into rope races according to different model, d
Viscosity of Volume of such as right-handed rotation or left-and-right handed Two circles
Model of
Time Working content lubrication lubrication rotation. Two ends of drum has flange.
gearbox
oil oil
Drum has guide, which is processed with wearable
engineering plastics. Rope guide has rope races inside. It is
cut from one cylinder, and then rebounded to elastic
GH3201 VG680 1400 connecting with gasket, nut and spring. When assembly,
Every six bolts should not be twisted too tight. Holder of rope guide
State of
months or up to will move around along connecting rod when drum is
lubrication oil
3000 hours
turning, so that rope guide can always be in the right Ends of drum have press plates for wire. Models and
GH5000A VG220 4000
position. Holder of rope guide can also touch alternative quantity of press plates depend on hoist’s model.
limiter device. According to safety standard, when hook is in the
If gearbox is working
Rope guide can make sure wire rope correctly wind on lowest position, there must be at least two circles at
GH12500 VG680 5000 under adverse
Every three years Change lubrication drum under normal operation. As to different winding the end of drum.
environment as below,
(operation oil (if it is mineral methods, drum has one or two rope guide. 3.1.4.1 Lifting limiter
under FEM) oil) it is very important to
GH20000 VG680 9000 shorten maintenance Rope guide made from engineering plastic can furthest CLESCRANE wire rope hoist use screw type cam
cycle: reduce wire rope’s wear. limit switch, which is installed on side plate of drum.

Extreme wet Winding methods include single winding and double Screw type cam limit switch is precise and
GH25000 VG220 13000 winding. The fixed connecting of single winding is as below. convenient for adjustment. The switch has two
Every five years Change lubrication Dust, acidity and other
The assemble direction of wire rope and fixed connecting contactors to make sure the hoisting mechanism
(operation oil (if it is synthetic corrosive environment
under FEM) grease) should be especially noticed when installation and move in lower speed after touch limit position, which
Environment with huge
GH40000 VG220 15000 maintenance. can effectively improve safety of operation.
temperature difference

09 WWW.CLESCRANE.COM 10
China Lifting Equipment Specialist

3.1.5 Trolley frame 3.1.8 Hook assembly The inverter is used for trolley traveling speed
control, and inverter data will be set before delivery
according to the requirements in the contract.
Note!
After disconnecting the power, there is still high
voltage in filter capacitor, so it is not allowed to do
maintenance work for inverter immediately and must
wait until the charge light is off and bus voltage is
under 36V.
Because of the temperature, humidity, dust and
Electromagnetic disc brake is assembled on motor. The vibration, the inter components of inverter will be
travel motor is designed and manufactured according to aging, which will cause the potential breakdown and
Trolley frame of double-girder hoist is constituted of VDE0530, which can suffer 1.5 times of rated current in lifetime of inverter. So, it is needed to do the daily
connecting girder and end beams. Fixed pulleys two minutes without damage wires inside motor. and periodical maintenance. Items needed to be
overload limiter are installed inside connecting girder. checked as following:
Helical gearbox with parallel axle can improve
The size of trolley frame depends on load, lifting height
transmission efficiency and reduce operation noise. Whether abnormal change in motor sound during
and some other elements of electrical hoists.
Under normal operation, gearbox doesn’t need to operation.
Hook assembly usually made up by following components:
3.1.5.1 Overload limiter change lubrication oil during safety working time. Whether there is vibration during motor operation.
Hook forging Overhand card
Overload limiter will stop lifting if actual load is over rated
Whether the inverter install condition changed.
load. Load protection is realized with electronic load Hook beam Hanger plate
3.1.7 Wire rope Whether the inverter cooling fan work normally.
sensor. Overload limiter’s installation methods of single Pulley assembly
wind and double wind are as below: Wire rope is the main stressed part as well as vulnerable Whether the inverter overheating.
Hook is the main stressed part of electrical hoist. The daily
part of hoist. In order to make sure safety manufacturing,
inspection and maintenance of hook includes following Keep inverter clean and clean dust on the surface to
operators should strictly follow safety operation manual.
content: avoid it be into the inner part especially the metal
Client should also timely check and maintain wire rope.
dust.
Routine maintenance includes: If there are damage of hook forging and overhand card
Clean the oil on the inverter fan completely.
Visual inspection If hook can freely rotate or not
Items needed to be checked periodical as following:
Surface greasy dirty Wearing situation of pulleys
Transduce Transduce Check air duct, and regularly clean
Check transformation and wear If cover of pulley rubs wire rope
Check screw (loosening or not)
Check wire broken Take different maintenance according to inspection results,
such as change wearing parts or adding lubrication oil (see Check inverter (corrosion or not)
Check corrosion situation
to attachment of Lubrication). Check terminal block (arc discharge or not)
Check connectors
Main circuit insulation test
Attention! Clean and lubrication (see attachment of Lubrication)
3.1.9 Hoist Electrical Control Wearing parts include cooling fan and filter
Overload limiter has been verified with rated load in The inspection and scraping standard refers to ISO
Power supply for standard CLESCRANE wire rope hoists electrolytic capacitor, and the lifetime for these parts
factory. When doing overload test on site, please turn off 4309:1990. Relevant data see to the attachment.
are 380V/50Hz, and control power is 48V/50Hz. The lifting are closely related to the environment and
overload limiter, and then recover it after overload test. If Attention! speed for standard wire rope is two speeds and traveling maintenance.
the set value of overload limiter is hugely different with
It is very important to timely inspect and maintain wire speed is variable speed. The outside view of the inverter as
actual situation, please contact hoist manufacturer or Normal lifetime as following:
rope. Please immediately release load as soon as find follows:
professional maintenance personnel to reset overload Fan 2-3 years
abnormal situation about wire rope. And ask professional
limiter. upper cover operation Electrolytic capacitor 4-5 years
maintenance personnel to inspect it and change wire
panel
rope if necessary. lower cover Users can determine the replacement according to
3.1.6 Trolley travel mechanism We suggest using crane components manufactured by the running time and specific situation of parts.
Travel mechanism includes squirrel-cage motor and CLESCRANE.
gearbox. input & output hole bottom
Motor of standard configuration is frequency and installation
hole
protection level is IP54 and has thermistor. fan
nameplate

11 WWW.CLESCRANE.COM 12
China Lifting Equipment Specialist

3.2 Technical Data 3.2.2.3 Converter


3.2.1 Model specification 3.2.2 Data Sheet Trolley traveling converter
CH950062T95GDGN Main hoist: wire rope hoist type ..........................CH950062T95GDGN
CH code for electric wire rope hoist Capacity ...................................................................................50000kg Converter Highest Precision of Control Starting Speed
9 code for trolley frame Lifting height ...................................................................................12m model frequency steady type torque adjustable
speed range
500 rated load S.W.L 500x100=50000kg Working group (lifting) .......................................................................M5
6 wire rope multiplying power Working group (trolley traveling) .......................................................M5
2 drum roping number Speed (hoisting speed) .......................................................0-3.3m/min MD280T0.7GB 600Hz ± 1% V/F control 150% 0-100Hz
T variable lifting pattern Speed (trolley traveling speed) .........................2-20m/min Variable
9 lifting motor power 38kW Motor (lifting) .............................................................38kW 40% ED
5 hoisting mechanism working group M5 Motor (trolley traveling) .......................................2×1.6kW 60%
3.2.2.4 Wire rope
G Lifting gear box ratio 144 Power supply .......................................................................380 / 50 Hz
D trolley structure is single Double Control voltage .............................................................................48 V
G drum length 2450mm Hoist rail gauge ........................................................................3100mm Diameter Minimum Strength Extruded Weight
breaking grade rope
N standard configuration
force

6 33.34 kN 2160 N/m ㎡ yes 0.17 kg/m


3.2.2.1 Hoisting Motor
Motor model: YQB350/QS40000/YZ160L-4_SF detail data as following:
8 58.84 kN 2160 N/m ㎡ yes 0.283 kg/m
Power Group Motor load Continuous Motor Rated Starting COS COS
(kW) working speed current current PHI PHI K
time (min) (min-1) (A) (A) 11 111.8 kN 2160 N/m ㎡ yes 0.54 kg/m

38 M5 50 15 2200 75 0.85 15 207.9 kN 2160 N/m ㎡ yes 1.02 kg/m

3.2.2.2 Lifting Brake 3.3 Lubrication


Main hoist: main brake model:YQB150 detail data as following: Gearboxes and bearings has been added enough lubricant before delivery, under normal circumstance and within safe
operation working time (SWP), no need to replace and add lubricant.
• Shell Super ATF
Braking IP code Brake coil Power Working Rectifier
torque resistance voltage voltage module • DEA 5060
• ESSO ATF D 21611
Note!
350Nm IP55 68Ω 230VAC 98VDC Pmg400 Synthetic lubricants can’t be mixed with mineral lubricants.

13 WWW.CLESCRANE.COM 14
China Lifting Equipment Specialist

the main power line terminal for power inside, mainly used Check whether the wire rope winding normally.
to cut off the main power supply during maintenance. Under Check the fastening condition on end of the wire
4 Assembly and Commissioning emergency situations need use emergency stop switch. rope.
Please read the operating manual and the relevant When the wire rope hoist is installed as crane components, New wire rope’s load should be about 10% of the
safety regulations carefully before hoist installation and the crane control system should be equipped with the main rated load. The load should be up to the total lifting
maintenance. power switch. height 5-10 times. If there appears wire rope winding,
Unless stated otherwise, the standard shipping status for 4.3.1.2 Pendant hook should be put at the lowest position when no
hoist rope and hook have been assembled, the Pendant push button control and fast cable joints are all load, open the end of the wire rope and rotary wedge
wheelbase or rail gauge wheels are manufactured and optional configuration, if the order contains they will be until the winding disappeared.
adjust to the position in accordance with the order. connect together and delivery with independent package. 4.3.1.8 Overload protection
Electrical parts have been functional tested in factory, but Different control type has different outlook of the pendant Check the Overload protection mechanism can
lifting height limit is necessary to adjust in site. control and cable connection. operating normally.
If the wire rope hoist is not installed immediately it must Check the whether pendant and pendant wire connections 4.3.1.9 Trolley frame
be placed in a dry and clean place. 4.2.1 Double girder hoists
are good or not, pendant should hanging at a reasonable Check the shaft distance and adjust correctly.
B
height.
c Check and ensure all of the screw are tightened and
4.1 Preparation for Assembly Press the direction button, it must be shown the direction on fastened.
Before assembly and maintenance please confirm the the button is same with the direction of movement.
There should be at least 3-5 round travel on the
conditions as following: If there are errors on all the moving direction, can be traveling beam.
enough personnel (quantity and skills) 1 corrected by changing the power supply phase sequence.
4.3.1.10 Brake
necessary tools and make sure the tools can use safety 2 Check the operation of the emergency stop button. Do not
Check the brake operation of hoisting motor.
press the emergency stop button during normal operation.
enough time(including assembly and commissioning time 4.3.2 Load testing inspection (100% rated load)
4.3.1.3 Noise
Site work condition (Whether there is existence of the 4.3.2.1 Motor current
installation personnel and equipment safety problems, Check the hoist wheel groove width (C) and rail tread When there is obviously noise for the hoist moving and
width width (A), the standard condition is C=A+15mm lifting, please check if installed incorrectly. Check each phase with rated load in the process of
also need check whether the installed hoist used for
lifting movement.
working conditions) Check whether the support beam rail center distance (B) Feeling vibrations of hoists by manually moving and lifting.
consistent with the hoist gauge R. Standard conditions is Current should be balanced on all of the phases, no
Note! If the hoisting motor makes continuous big noise and
B = R ± 2mm more than the motor rated current. Check the current
Assembly work need be finished by professional vibration, check and power supply phase sequence. If there
under two hoisting speed.
personnel. Lift the hoist on the support beam and check the is a large gourd mobile noise or excessive vibration, check
parallelism. the rail installation whether it meets specifications or not. 4.3.2.2 Motor Operating Temperature

Before assembly please confirm the dimension of R and Before determine the cause of the noise, please do not use If thermal protection makes the lifting movement stop
4.2 Hoist lifting too early, find out the cause of the overheating before
C, Which has been adjusted before delivery. If the real the hoist.
4.2.1 Single girder hoists continue test.
dimension of B is different from the order and need to 4.3.1.4 Lifting limit switch
Width between the single girder trolley wheels (B1)has adjust B1, please contact with supplier. 4.3.2.3 Traveling mechanism
Check and adjust the limit switch movement by put hook on
been adjusted before delivery. The dimension of B1 must Check whether the accelerator and brake can operate
its top and bottom position. To be on the safe side, there
be 4~5mm bigger than bottom width of support beam. normally.
4.3 Check and Commissioning must have adjustment on lifting limit switch before each test.
Before assembly please confirm the dimension of B and
4.3.1 No-load check 4.3.1.5 Traveling limit switch Move left and right 3~5 times on the whole length of
B1. If the real dimension of B is different from the order
the main girder and the rail can’t be painted.
and need to adjust B1, please contact with supplier. 4.3.1.1 Electrical system Check the limit switch operation condition by move the hoist
its trigger position. To be on the safe side, there must have 4.3.3 Check under overload (110…125% of rated
Loosen the nuts(1 and 3), and lock piece 2 Check whether the connection of electric device is same
adjustment on traveling lifting limit switch before each test. load)
Lift the hoist on the support beam. with the drawing
4.3.1.6 Hook and sheaves 4.3.3.1 Overload protection device
Adjust the size and dimension of B1(about 5mm bigger Check the cable connection
Check the wire rope sheaves can rotate freely Check the overload device during overload operation.
than bottom width of support beam) Check the main power switch (supplied by users)
Check the hook can rotate freely When operate with the overload, the overload device
Pre-tighten the lock nuts(1 and 3), check the parallelism According to the requirements of safe working practices,
can stop the movements.
of all the wheels, adjust the lock nuts if necessary wire rope hoists shall be equipped with the main power 4.3.1.7 Wire rope
switch. The main power switch should be installed near 4.3.3.2 Brake
Tighten the lock nuts Check and ensure no damage on wire rope during
movement. Put down the load and stop with the low speed and
brake can work normally.

15 WWW.CLESCRANE.COM 16
China Lifting Equipment Specialist

4.3.4 Data and records load bearing and load bearing structures that may affect the 6.1.3 Routine inspection
Check the files delivered together with the hoist. Ensure the entries are in a proper manner, and the reference data is in safe operation and personnel safety defects. For safety, professional personnel should inspect
accordance with the nameplates. All structural inspection and testing results should be wire rope hoist as well as its bearing structure at
recorded in the maintenance plan form. least once a year. As to wire rope hoist which often
Write hoist debugging log. Put together the log with other documents of the hoist.
used nearly rated load, should be test more
In order to ensure safe production, electric hoist manufacturer can arrange user training through a separate agreement. Based on the results of inspections and tests, specialized
frequently. Hoists used in wicked situation should
inspector shall decide whether to do load debugging.
also be tested more frequently. User can also consult
If any defects found during load debugging, specialized
manufacturer about routine inspection, especially
inspectors shall have the right to re-test.
about doubts of inspection results.
5 Operating manual 5.2 Loading type Notice
Routine inspection includes:
5.1 Pendant control Load should be hung onto the hook for elevation. It is According to different requirement of local safety
Check hoists identities according to technical data in
strictly prohibited to pull obliquely during lifting. Use an department, the content of inspection and test may be
The standard control mode of lifting and traversing inspection schedule
auxiliary lifter if necessary. different. If the load testing require to do 1.1 times of rated
movement of the wire rope electric is by the pendant. For Check if hoists and parts are broken, wear or
Before lifting ensure the load has been well fixed, and load for dynamic test and 1.25 times of rated load for static
other control solutions, please confirm with CLESCRANE corroded
hook safety buckle in the closed state. test, please contact with manufacturer of hoists about this.
before ordering.
Check if safety protection device (limiter, emergency
If the rope is in a relaxed state before lifting, need to 6.1.2 Acceptance tests after overhaul and significant
Lifting motor is controlled by two-speed button. To start stop) and brake are operated well
carefully check whether the wire rope has knots or is changes
the hoist, a skilled operator will always start slowly (the
seriously distorted after lift up. During the lifting process, Check bearing structure
first stage) and then transition to a rapid speed (second Please do acceptance tests to wire rope hoist which has
level). When lowering the load, a skilled operator will operator or assistant operator must ensure that the hook been overhauled and significantly changed refer to 6.1.1. Count remaining safety working time
lower the goods by a high speed to an appropriate height always within his sight. Notice
Overhaul and significant changes include:
then use low speed to put down the load to the Move hoist and use it in other bearing structure 1.Stop using wire rope hoist if it has approached at
appointed location. theoretic safety working life
Weld in existing bearing structure
The mechanical locking device in the controller is to 2.If insist in continuing using this wire rope hoist,
6 Inspection and repair Design change of existing structure
prevent the reverse action when the opposite action professional personnel should provide below
buttons are pressed. Pay attention to avoid frequent 6.1 Inspection Notice
document:
starts during the operation. Notice Crane should be tested and accepted according to relevant
a)Confirm hoist can be used continually
By pendant can achieve the following controls: User or an appointed third party should carry out standards if wire rope hoist is used as it lifting equipment.
b)Inspection report
Release the button => Stop acceptance test when receive the goods. Acceptance
3. User’s acceptance of inspection result and report
and testing personnel must meet the following
Press the first level => slow (see below)
requirements:
All Press => fast (see below) 6.2 Inspection Plan
Must have good mechanical, electrical, and wire rope Inspection cycle
hoists technical background Parts Inspection content
Commissioning Daily regular
Have enough experience of rope hoist installation, Functional Testing X X X
Brake
service and maintenance Brake gap X
Overload limiter Functional Testing X X
Familiar with relevant safety practices
Press the red emergency stop button => to stop all Visual damage situation X X
6.1.1 Inspection test before the first start-up
actions (see below) Wire rope Lubricating X X X
Users should ensure that wire rope hoists, load bearing
Clockwise rotate the emergency stop button => to Wearing situation X
and load bearing structures is tested by experienced
restore the original action (see below) personnel before the first start-up The following items Rope guide Visual appearance and Accessories X X
must be checked during the inspection and testing: Visual damage situation X X
If the technical parameter of the wire rope hoist is If safe lock can rotate freely
consistent with the nameplate Hooks X X X
If safe lock can rotate freely
If there’s any violation of safety norms during design and
Wearing of hook X
manufacture.
Functional Testing X X X
Safety devices such as limit switches, brakes and others Electronic control
If wire is loose X
operate normally
Limiting stopper of lifting Functional Testing X X X
There shouldn’t be any defects in the wire rope hoists,

17 WWW.CLESCRANE.COM 18
China Lifting Equipment Specialist

Attention! According to standards of ISO4309, release the whole


Only well-trained and authorized technical personnel can wire rope and fix the wire rope at the end of drum
maintain and service electrical wire rope cranes of depending on torque required from pressing plate (see to
Faults description Possible causes Handling methods Remarks
CLESCRANE. chart of pressing).

CLESCRANE will not take responsible for any quality Start motor to wind wire rope on drum, and then cross
events caused by non-authorized or incorrect another end of wire rope through hook pulley, fixed Check power supper and collector
maintenance. Please must use original spare parts of pulley and fixed wedge block. No power Check emergency stop and
contactor KI
CLESCRANE, in order to ensure the effectiveness of Putting the wedge into wedge block, frapping wire rope, Hoist doesn’t
quality assurance provisions. then fix rope clips to the end of rope after correct operate
CLESCRANE service hotline: installation.
Check phase sequence of main power
Reinstall rope guide on drum after cleaning and Lifting limiter is touched Check limiters
lubricating.
Check again if wedge block, wire rope and wire rope are No power Check voltage of main power

Tel installed correctly, as well as confirm the lifting limiter is


working normally. wiring error of main power’s
supply line Re-wiring correctly
+86-0371-5532 8269 Ext.1002 Put hook in the naturally vertical state to visually check if Lifting motor
the hook is horizontal rotation. If the hook is horizontal doesn’t operate
Fuse error Replace new fuse
rotation, release wire rope from the fixed end to release
stress.
Malfunction of Push Button Check buttons and wiring of buttons
6.3 Maintenance and replacement of wire rope
6.4 Cleaning and lubrication of rope guide
6.3.1 Inspections of wire rope Check wiring of incoming lines Motor
During normal use, rope guide will get enough lubrication Wiring error
Wire’s fracture will happen during normal using, because of main power probable
Lifting motor does
through the lubrication of wire rope. It is also necessary be broken
of continue wearing and fatigue stress. For security not move, but has
to separately lubricate rope guide when check hoist. "Mu" sound when Contactor error Replace contactor
reasons, it is necessary to check wire rope once a
When lubricating, rope guide should be taken from drum pressing buttons
month. The wire rope must be changed if anyone of
and then wipe some lubrication oil on the friction surface. Brake doesn’t open Refer to the handling of brake errors
following three situations happens: number of fracture
more than 4% of total amount within the distance no
longer than 6 times of wire rope’s nominal diameter Check buttons and replace them
Faults of push button
if necessary
(FEM 1Bm~1Am); number of fracture more than 8% of
total amount within the distance no longer than 30 times
7 Faults handling Single-direction
movement of Wiring faults Check wiring
of wire rope’s nominal diameter (FEM 2m~4m); broken Attention!
lifting
of wire rope’s strands. In addition, if wire rope has The power must be cut off before any fault handling. Lifting limiter is touched Check limiter
suffered severely mechanical injury, such as deformation
of cage type, permanent deformation and so on, it must Faults of contactor Check contactor
be changed immediately.
Power supply failures of Check wiring/ change or maintain
6.3.2 Maintenance and lubrication of wire rope brake coils broken brake coils
Brake doesn’t
User should do necessary lubrication depending on operate
Check wiring and power supply of
usage. The idea lubrication method is using cotton cloth Failures of rectifier brake coils Replace broken rectifier
wetted by worm lubrication oil to scrub the whole wire
rope. If wire rope cannot be lubricated because of Braking length is
Clearance of brake disc Adjust clearance
special situation, service life of wire rope must be too large
shortened and users should do more frequent Insufficient lubrication of
inspections. Lubricate wire rope timely
wire rope
6.3.3 Replacement of wire rope
Excessively fast Clean wire rope timely
Solid attachments on wire rope
Put empty hook on the holder and strike cover of drum. wearing of
Take out rope from the fixed end and then release rope wire rope
guide. Then release the whole wire rope and lease bolts Pulleys are broken because Replace Anew parts
of press plates, and then take out the whole wire rope. extreme using

19 WWW.CLESCRANE.COM 20
China Lifting Equipment Specialist

Files list CERTIFICATE FOR PRODUCT

Serial No. 200421016 Work order CLES0103200107 Description Electric Wire Rope Hoist

Code CH950062T95GDGN Model&Size CH50t12m


No. Description Shares Pages Remark
1 Certificate for product 1 1 Serial No. 210319029 S.W.L 50000 Kg

2 Hook’s Certificate 1 1
Height of lift 12m Wire rope Diameter 15mm
3 Load limiter’s Certificate 1 1
English Lay L/R Length 91m
4 User’s Manual 1 33

5 Rating M5 Insul.Prot.Class F/IP55

6
Hoisting Motor Power 38kW(75Hz) Travelling Motor Power 2×1.6KW(50Hz)
7

8 Hoisting speed 0-3.3m/min Travelling Speed 2-20 m/min(VF)

9
Volt.&Freq 380V/50Hz control voltage 48V
10
Overload device AG Adjusted load 52500 Kg
11

12
Factory teses: Number of starts 30
13 Test run with 100% load.
14 Dynamic overload test, 125% load.
10%under voltagetest, 100% load
15
Overload set at 110% load.
16

17 This product has been inspected and tested, founded to be in compliance with the relativing standards and
18 codes, the drawings.

19

20

Date 2021.04

Compile: Date: Inspector: Date:

21 WWW.CLESCRANE.COM 22
23
HENAN CLESCRANE SYSTEM CO.,LTD.
NO.SD/5ZJ46
QUALITY INSPECTION REPORT
REPORT NO.9-49-5
China Lifting Equipment Specialist

CUSTOMER NAME OF PRODUCT 20#T-LEVEL HOOK

RANDOM QUENCHING+
818995 HEATTREATMENT No. 200215AJF HEATTREA TMENT CONDMON
SECURITY CODE TEMPERING

GRADE T HEAT No. D20-029 QUANTITY 5

ELEMENTS(%) C Si Mn P S Cr Ni Mo Al
CHEMICAL
COMPOSITION STANDARD 0.32-0.40 0.17-0.37 0.40-0.70 ≤0.035 ≤0.035 0.80-1.10 — 0.15-0.25 —

REMARKS
SPECIMEN 0.36 0.23 0.60 0.010 0.002 1.00 — 0.19 —
ULTRASONIC
FLAW
ITEM TENSILE TEST IMPACT TEST HARDNESS DETECTION, IN
LINE WITH
TENSILE JB/T5000.15-2007
YIELD POINT STRENGTH ELONGATION SHRINKAGE Akv(-20℃) HB
MECHANICAL STANDARD II
STANDARD Y.P.(N/mm²) T.S.(N/mm²) E.L.(%)5 R.A.(%) Ak(J/cm2) (SURFACE)
PROPERTIES
≥490 — — — ≥27 —

SPECIMEN 625 836 18 66 73,33,120 HB249-255

This is to certify that material is in accordance with the requirements of GB10051-2010 and qualified by inspection.

DATE: QC MANAGER: INSPECTOR:


Type Span:

Inspector:
Synthesis error:
load limiter

Product Serial No:

Our Set Limiter Load:


±3%

Inspection Date:
Transducer Rated Load:

Transducer sensitivities:

50

Inspection Result:

Website: www.clescrane.com.
Email: inquiry@clescrane.com
ZQX-6/1-50t

Technical Parameter

Tel: +86-371-5532 8269 Ext.1002


±5‰
10
190620007

( F·S )

Henan Clescrane System Co.,Ltd.


19.6
Qualified
T
Eligible Certificate
standard: TSG Q7014-2008
model test Certificate No:TX 4000-24-19-5107

Inspection Seal

Address:Room 902, Building 6, No. 26 Dongqing Street, Zhengzhou, Henan, P.R.China.

WWW.CLESCRANE.COM 24
China Lifting Equipment Specialist

12.2 Wire rope hoist yearly inspection record


12 Product information Attached yearly inspection record
12.1 Wire rope hoist maintenance form
Below table to be filled in by client: Inspection Inspector
No Test result Date
items
To be completed by the customer
1

Company:
2

Date commissioned: 5

Location: 7

Manufacturer: 9

Address: 10

Service hot-line:
11
Type:
12
Serial number:

Manufacture date: 13

Working group: 14

Rated load:
15
Lifting height:
16
Lifting speed:

Electrical outlet: 17

25 WWW.CLESCRANE.COM 26
China Lifting Equipment Specialist

Electrical Drawings

27 WWW.CLESCRANE.COM 28
China Lifting Equipment Specialist

29 WWW.CLESCRANE.COM 30
China Lifting Equipment Specialist

31 WWW.CLESCRANE.COM 32
China Lifting Equipment Specialist

33

You might also like