PRECOMMISSIONING TEST SHEET

PRE-COMMISSIONING

FLUSHING / BLOWING

RDMP PROJECT

Form No. : PIPI-001 Item No. : AB-331-GTGA-MBH-0005

:
Form Description Piping Flushing / Blowing Test Sheet Item Description : GTG Purge Air System

Unit : 331 26071-V9A-A-331-07-GT-01-00081


Ref. Drawing :
Sub-System No. : 331-P100-100
Subsystem
: GTG A
Description

Water Demi. Water Steam Air


Flushing Medium:
Degreasing Acid Cleaning Mech. Cleaning Other

PIPEWORK INDEX

NO. TP No. / Method Acceptance Criteria & Result DATE

1 331-GTGA-MBH-0005 / Quick depressurized Air color change to clear

10

11

12

13

14

15

16

17

REMARKS

CONTRACTOR Owner's QA/QC Owner's System Completion

Name Name Name

Signature Signature Signature

Date Date Date


PREPARATION CHECK LIST

LUBE OIL FLUSHING


PRE-COMMISSIONING
Form No. : PIPI-002 Item No : AB-331-GTGA-MBH-0005

Form Flushing / Blowing Preparation Check Item


: : GTG Purge Air System
Description List Description

Unit : 331 Task Number :


Subsystem No. : 331-P100-100 Sheet No. : 1 of 1
Subsystem
: GTG A
Description
Applicability
NO. CHECK LIST RESULT
(YES, NO, N/A)

1 Check Job safety analysis or task based risk assessment has been performed

2 Check permit to work has been approved

3 PPE Prepared such as ear protection, gloves, coverall, goggle

4 Safety precaution or warning sign posted around the area

5 Check the line-up condition as per mark-up P&ID

Check any drums to be used as an air reservoirs have its associated relief valves in normal
6
operation

7 Confirm air quality and internals at which confirmation is repeated

Confirm proper signage at discharge point, that equipment / Instruments around dischage
are protected, and that discharge is properly oriented to minimize impacts. if required, Wood
8
plank cover may be provided for each air blowing discharge points to protect the
surrounding.

9 Confirm siren available

10 Conduct toolbox meeting

11 Confirm devices are removed from line and provide list of tags

12 Review items from HSE checklist in paragraph 9 of 26071-100-530-GST-00002

REMARKS :

CONTRACTOR Owner's QA/QC Owner's System Completion


Name Name Name

Signature Signature Signature

Date Date Date


REINSTATEMENT CHECK LIST

FLUSHING / BLOWING
PIPING
Form No. : PIPI-03 Item No : AB-331-GTGA-MBH-0005

Form Item
: Reinstatment Check Sheet : GTG Purge Air System
Description Description

Unit : 331 Task Number :


Subsystem No. : 331-P100-100 Sheet No. : 1 of 1
Subsystem
: GTG A
Description
Applicability
NO. CHECK LIST RESULT
(YES, NO, N/A)

1 Temporary test blinds and any temporary supports removed

2 Strainer to be installed

3 Contral valves and Instrument installed (flow direction checked)

4 Check valves internal are re-installed

5 Test gaskets & bolts replaced. New gasket will be used.

6 Flange connection bolts tensioned/torqued

7 Flow direction checked on all valves

8 All valves function properly and all spindles have been lubricated

9 All spectacle blinds have been correctly installed as indicated on the drawing

10 All lines clealiness is accepted on Page 1


Check if completed line (with all items installed in the permanet configuration) is properly
11
aligned

REMARKS :

CONTRACTOR Owner's QA/QC Owner's System Completion


Name Name Name

Signature Signature Signature

Date Date Date


PRECOMMISSIONING TEST SHEET

PIPING

FLUSHING / BLOWING

RDMP PROJECT

HYDRO PACKAGE LIST


(FLUSHING / BLOWING)

PACKAGE NO. : AB-331-GTGA-MBH-0005

NO. Hydro Package No. Remark

1 TP-331-GTGA-MBH-0005

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31
1 2 3 4 5 6 7 8 9 10 11 12

S C

Document No
MBH20/05

VENTILATION TO
ATMOSPHERE

Air Blowing Procedure:

E1B100574617
A
1. Air hose is to be connected as per mark-up P&ID. A

(By mobile air compressor)

11 MBH20BR040
2. Check the line-up condition as per mark-up P&ID

Ø1/2"
SWA0A1
3. Supervision & Set the warning tape around blow-off

Sheet
4. Keep pressure around 3 kg/cm2g

1
AB-331-GTGA-MBH-0005 5. Once foreign matters are not visible at the blow-out
point, blowing is completed. H2
MBH20SS10 TURBINE ENCLOSURE

6. Piping after blowing will be inspected visually


TIZA
11 MBH20FT805
H1
L1
B 1 bar.g 150 °C Natural Gas B
1.0 kg/cm².g 150 °C

11 MBH20BR235
1 bar.g 200 °C 1.0 kg/cm².g 200 °C
Purge Air

Ø1/2"
SWA0A1
TI
11 MBH20CT010

25.5 kg/cm².g 200 °C PP PP TI TI


11 MBH20CP010 11 MBH20CP015 11 MBH20CT005 11 MBH20CT015
25 bar.g 200 °C

11 MBH20BR230
MBH20SU020

Ø1/2"
SWA0A1
11 MBH20BR046

11 MBH20
ASMDA2

C 11 MBH20 C
4"

C S AT005
MBH20/25 11 MBH20BR210 BP210
SWA0A1

GSA

GSA
-S01

-S02
Ø1/2"

MS01
11 MBH20BR035

11 MBH20
11 MBH20 1 bar.g 70 °C -Y01 MS02

ASMDA2

AA215
BS210 4
IA

-Y01
5 MS01
2
1.0 kg/cm².g 70 °C 13

4"
MBH20SU015 GSA
BLOWOUT 11 MBH20 LEGENDS -S01
M

11 MBH20 AN005 GSA


POINT AC005 -S02

IA
-M01 11 MBH20BR020 11 MBH20BR025 Gas Fuel System
11 MBH20 ASMDA2 ASMDA2 MBP10BR020
: Temporary Spool
2" 2" E1B100574613
M

AN010
11 MBH20 MAIN GAS MANIFOLD
-M01 : Temporary Valve
MBH20SU010 AA020
11 MBH20BR205
SWA0A1

D
11 MBH20BR029 : Remove Item 11 MBH20BR007 D
ASMDA2 ASMDA2
Ø1/2"

4" 4" -Y01 -Y01 MS02


MBH20SU45 4 4
MBH20SU05 IA 5
13
2 MS01 IA 5
13
2 MS01
11 MBH20 AIR SUPPLY GSA 40 bar.g 150 °C Natural Gas 40.8 kg/cm².g 150 °C GSA
BP205 CONNECTION -S01 -S01
GSA GSA
1.0 kg/cm².g 70 °C

485 °C
-S02
25 bar.g 200 °C Purge Air 25.5 kg/cm².g 200 °C -S02

11 MBH20BR006
11 MBH20BR010 11 MBH20BR015 Gas Fuel System
1 bar.g 70 °C 485 °C ASMDA2 ASMDA2 MBP20BR020

ASMDA2
4" 2" E1B100574613

4"
C S 25 bar.g 11 MBH20 11 MBH20 PILOT GAS MANIFOLD
11 MBH20 11 MBH20BR215
BS205 MBH20/26 AA010 AA015
25.5 kg/cm².g

SW0A1
Ø1/2"
MBH20/10
C S

E E
11 MBH20BR005
ASMDA2
3"

PP
11 MBH20CP005

MBH20SS05

F F

G G
We reserve all rights in this document and in the information
contained therein. Reproduction, use or disclosure to third
parties without express authority is strictly forbidden.

© Siemens AG 2020

Original Date Based on doc No / Revision Title

2019-09-09 / MBH20 PURGE AIR SYSTEM DUAL FUEL


Appr. by Designation
MBH20
Ida Majala P&ID - Purge air system MBH20
H Checked by Prepared by Lang. H

Anders Samuelsson A. Rai / SGT-800 en


Latest revision DCC Resp. dept. Order no Plant Name No. of sh.

E MFB103 OEMF BD000795U01 RDMP Balikpapan 1


E - 2020-10-08 A. Rai HG Document No Sheet
Latest rev. Revision text Rev. date Prepared by / Created by:
9100 E1B100574617 1
1 2 3 4 5 6 7 8 9 10 11 12