Professional Documents
Culture Documents
Barem Project 2022
Barem Project 2022
Finish
Wall
Elevation Grid Column Floor floor/
(color)
Ceilling
No Name
Reinforcement
Reinforcement
(rebar) in
Window/ Funiture Foundation Column Beam (rebar) in
Stair Roof Rail Details Stair Floor foundation
door /Equipment foundation
(triangle) /
(rectangle)
column
0.25 0.5 0.25 0.5 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25
0.5
Drawings / Rendering/Conflict
Reinforcement Reinforcement
Reinforcement Floor + Details Schedules/ List Structural
(rebar) in (rebar) in Reinf plans Conflict
(rebar) in stair elevation drawings of drawings plans
beam column/floor
0.5 0.5 10
Revit architecture Funiture
Finish
Wall Window/ /
No Name Elevation Grid Column Floor floor/ Stair Roof Rail Details
(color) door Equipmen
Thơ, Trí, 0.25 0.25 0.25 0.25 0.25 Ceilling0.5 0.5 0.5 t 0.5 0.5 0.25 0.5
Việt,
1 0.25 0.25
Vương,
2 Mai Anh
3
4
5
Foundatio Revit structure Finished/ Drawings / Rendering
Schedules Render
Column Beam Floor + Details Structural Reinf Render
n Stair Floor Equipmen / List of images / Conflict
elevation drawings plans plans videos
0.25 0.25 0.25 0.25 0.25 0.5 t plans 0.5 0.5 drawings0.5 0.5 0.25 RS +RAC 1 0.5 1
0.75
Presentat Sum
ion
1 12
No
Name
Elevation 0.25
Grid 0.25
Column 0.25
Wall (color) 0.25
Floor 0.25
Finish floor/
0.5
Revit architecture Ceilling
Window/door 0.5
Stair 0.5
Funiture
0.5
/Equipment
Roof 0.5
Rail 0.25
Details 0.5
Foundation
0.25
Column
0.25
Revit structure Beam
0.25
Stair 0.25
Floor 0.25
Floor + elevation 0.5