t 1.1 BACKGROUND:
o National Highway Authority is taking up the Construction of

I Motorway Link from Kot Momin to Jhang via Sargodha Silanwali


(130 Km Approx.) on deposit work basis as the subject project

I doesn't lie on NHA network and NHA will execute this project as
deposit work basis.

I o The subject project is reflected in PSDP 2023-24 with an allocation


of Rs. 5O million at G.SI. # 153.

I o Now NHA intends to appoint the Consultant


and Detailed Design for Construction
for "Feasibility Study
of Motorway Link from Kot

I .
Momin to Jhang via Sargodha Silanwali (130 Km Approx.)".
The Consultant is required to studv various alignments alternatives

I and suseest the best option to the Client with proper pros & cons
and subsequently eet approval for most viable/feasible aliqnment for

I L.2
the subiect proiect.

PROJECT DEFINITION:

t The project comprises Construction


to Jhang via Sargodha Silanwali (130 Km Approx.).
of Motorway Link from Kot Momin

I 1.3 PROJECT OBJECTTVES:


. This section is intended to provide safer, quicker and more efficient

t o
passage.
Vehicle operating cost will be reduced & traveling time will be saved.

I . Job opportunities will be created for local people.


L.4 TBCHNICAL PARAMETERS:

I No ofLanes
Carriasewav width
02 lanes
7.3m

I Deslgn speed
Row
60/80/100 Km/hr
40m

I Drainage
Geometric Deslgn
As per requirement
As per AASHTO manual of geometric
desim

T F'easibility Study & Detailed Design for Construction of Motorway Link from Kot Momin to Jhang via Sargodha
Silanwali (130 Km Approx.).