t 1.1 BACKGROUND:
o National Highway Authority is taking up the Construction of
I doesn't lie on NHA network and NHA will execute this project as
deposit work basis.
I .
Momin to Jhang via Sargodha Silanwali (130 Km Approx.)".
The Consultant is required to studv various alignments alternatives
I and suseest the best option to the Client with proper pros & cons
and subsequently eet approval for most viable/feasible aliqnment for
I L.2
the subiect proiect.
PROJECT DEFINITION:
t o
passage.
Vehicle operating cost will be reduced & traveling time will be saved.
I No ofLanes
Carriasewav width
02 lanes
7.3m
I Deslgn speed
Row
60/80/100 Km/hr
40m
I Drainage
Geometric Deslgn
As per requirement
As per AASHTO manual of geometric
desim
T F'easibility Study & Detailed Design for Construction of Motorway Link from Kot Momin to Jhang via Sargodha
Silanwali (130 Km Approx.).