Professional Documents
Culture Documents
Test No. 2 - Power Failure and fire alarm in common areas (i.e. smoke/thermal detector or manual call point)
S/N Description
1 Cut-off mainboard normal power
2 Generator auto cut-in after 15 seconds
3 Emergency lights come on in all spaces
4 Exit signs remain lit
5 All lifts go to 1st storey / nearest floor and cannot operate
6 Reset lift panel for lifts to normal operate on emergency generator power
7 Set off any 1 number smoke detector in common areas. Immediate general alarm to building
8 All lifts to home to 1st storey / nearest floor and cannot operate.
9 Firemen lift switch turned on. Firemen lift can be used now.
10 Firemen lift intercom can be used to speak to Telephone Operator
11 Public announcement in two languages (local language and English) to evacuate building and guestroom.
12 Background music cut-off upon fire alarm signal
13 Fire alarm bells go off. Visual alarm goes off.
14 Staircase pressurisation fan operate, smoke control system operate.
15 All EM locks unlock
Test No. 4 - Power Failure and fire sprinkler activation (or fire hosereel)
S/N Description
1 Cut-off mainboard normal power
2 Generator auto cut-in after 15 seconds
3 Emergency lights come on in all spaces
4 Exit signs remain lit
5 All lifts go to 1st storey / nearest floor and cannot operate
6 Reset lift panel for lifts to normal operate on emergency generator power
7 Set off fire sprinkler. Whole building fire alarm
8 Jockey pumps cut in.
9 Main fire pump cut in. Now we will stop main fire pump
10 Standby diesel fire pump cut in.
11 Fire pumproom exhaust fan continue to operate
12 All lifts to home to 1st storey / nearest floor and cannot operate.
13 Firemen lift switch turned on. Firemen lift can be used now.
14 Firemen lift intercom can be used to speak to Telephone Operator
15 Public announcement in two languages (local language and English) to evacuate building and guestroom.
16 Background music cut-off upon fire alarm signal
17 Fire alarm bells go off. Visual alarm goes off.
18 Staircase pressurisation fan operate, smoke control system operate.
19 All EM locks unlock
Test No. 6 - Power Failure and smoke detector activation for pre-action system
S/N Description
1 Cut-off mainboard normal power
2 Generator auto cut-in after 15 seconds
3 Emergency lights come on in all spaces
4 Exit signs remain lit
5 All lifts go to 1st storey / nearest floor and cannot operate
6 Reset lift panel for lifts to normal operate on emergency generator power
7 1 No. smoke detector activated. Fire alarm signal to main alarm panel
8 2nd Number smoke detector (in another zone) activated. Signal to pre-action solenoid valve.
9 Water charge in to pre-action system
10 Fire sprinkler activated
11 Send whole building fire alarm
12 All lifts to home to 1st storey / nearest floor and cannot operate.
13 Firemen lift switch turned on. Firemen lift can be used now.
14 Firemen lift intercom can be used to speak to Telephone Operator
15 Public announcement in two languages (local language and English) to evacuate building and guestroom.
16 Background music cut-off upon fire alarm signal
17 Fire alarm bells go off. Visual alarm goes off.
18 Staircase pressurisation fan operate, smoke control system operate.
19 All EM locks unlock
Test No. 8 - Power Failure, fire alarm signal to 1st storey lobby and alternative floor homing
S/N Description
1 Cut-off mainboard normal power
2 Generator auto cut-in after 15 seconds
3 Emergency lights come on in all spaces
4 Exit signs remain lit
5 All lifts go to 1st storey / nearest floor and cannot operate
6 Reset lift panel for lifts to normal operate on emergency generator power
7 Set off smoke detector in ground floor lift lobby.
8 All lifts to home to 2nd storey and cannot operate.
9 Firemen lift switch turned on. Firemen lift can be used now.
10 Firemen lift intercom can be used to speak to Telephone Operator
11 Public announcement in two languages (local language and English) to evacuate building and guestroom
12 Background music cut-off upon fire alarm signal
13 Fire alarm bells go off. Visual alarm goes off.
14 Staircase pressurisation fan operate, smoke control system operate.
15 All EM locks unlock
2 To close lift door, user to press and Hold close door button all the time. Until fully close, then release button. Lift door remain closed.
3 If short press, door will stop closing and go back to open mode
4 Press Lift storey (example. 10th Floor). Lift goes up and reach the floor. Doors remain closed
5 To open lift door, press and hold open door button all the time . Until fully open, then release button. Lift door remain open.
6 If short press, door will stop opening and go back to closed mode
Notes
Staircase pressurisation system only required for buildings more than 25m in height. Where provided, the system shall meet
following requirements
(a) Pressure difference with corridor achieve 50 Pa when all doors closed
(b) 1 m/s air velocity for 3 number of open door
1 (c) Door opening force not more than 110 N when all doors closed
2 Firemen lift only required for buildings more than 25m in height. Where provided, there shall be a firemen switch at first storey.
3 Guestroom smoke detector sounder base to achieve 75dBA sound level at bedhead
4 Guestroom announcement speaker to achieve 75dBA sound level at bedhead. 65dBA all other areas