Professional Documents
Culture Documents
Wall Anchorage Forces
Wall Anchorage Forces
1/4" / 12"
Fp= 0.4*Sds*Ka*Ie*Wp
SLOPE
Fp= 0.4*1.204*2*1*3.4378*6.5 Fp= 0.4*Sds*Ka*Ie*Wp Fp= 0.4*Sds*Ka*Ie*Wp
Fp= 0.4*1.204*2*1*3.980*6.5 Fp= 0.4*1.204*2*1*3.4378*6.5
Fp=25 K Fp=21.5 K Fp= 0.4*1.204*2*1*3.437*6.5/2
Fp=21.5 K Fp=11 K
Girder EQ reaction = 25 k at W24
condenser supporting girder
B
DL=3.51K
SL=8.7 K Group: 2
Fp= 0.4*Sds*Ka*Ie*Wp Anchorage Design Uplift Force = 21 kips
DL=3.6K Fp= 0.4*1.204*2*1*3.4378*6.5 Anchorage Design Shear Force = 1.2D + 1.6S = 16.3 kips
SL=7.5K Fp=21.5 K (At staircase) Anchorage Design Moment due to shear force = 16.3k x 3.5in = 57.05 k-in
C Fp= 0.4*Sds*Ka*Ie*Wp
Fp= 0.4*1.204*2*1*3.980*6.5
Fp=25 K Group: 1
Anchorage Design Uplift Force = 21 kips
Anchorage Design Shear Force = 1.2D + 1.6S = 18.13 kips
Anchorage Design Moment due to shear force = 18.13k x 5.67in = 102.8 k-in
D
Group: 7
Anchorage Design Uplift Force = 25 kips
Anchorage Design Shear Force = 1.2D + 1.6S = 16.32 kips
E Anchorage Design Moment due to shear force = 16.32k x 5.67in = 92.53 k-in
Group: 9
W30 11.5"
F JOIST FORCE = (1.2+0.2Sds)D+ΩEQ+L+0.2S
1/4" / 12"
= (1.2+0.2*1.204)11.5+2.5*24.5+3.5+0.2*7.5 = 84.07K
SLOPE
GOVERN FORCE = 84.07K , MOMENT = 294.245K-FT
SHEAR = 25K
RIDGE LINE
G
1/4" / 12"
SLOPE
H
PALMDALE, CA 93551
BUILDING A
L
M
1/4" / 12"
DL=3.4K
SLOPE
SL=11.8 K
Fp= 0.4*Sds*Ka*Ie*Wp Group: 5
Fp= 0.4*1.204*2*1*2.820*6.5 Anchorage Design Uplift Force = 18 kips
N Fp=18 K (Lower Roof) Anchorage Design Shear Force = 1.2D + 1.6S = 22.96 kips
Anchorage Design Moment due to shear force = 22.96k x6in = 137.76 k-in
DL=3.4K
SL=5.3K
Fp= 0.4*Sds*Ka*Ie*Wp
Fp= Group: 4
0.4*1.204*2*1*1.275*6.5 Anchorage Design Uplift Force = 8 kips
Fp=8 K Anchorage Design Shear Force = 1.2D + 1.6S = 12.96 kips
Anchorage Design Moment due to shear force = 12.96k x 6in = 77.76 k-in
OVERALL ROOF FRAMING PLAN
1 REV DATE
1" = 50'-0"
1 REV 0 2023-12-04
ASI - 001
ASI DATE
ASI-001 01-15-2024
Sheet No:
S-A0-141
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 16.9 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Fp= 0.4*Sds*Ka*Ie*Wp
PALMDALE, CA 93551
Fp= 13 K
BUILDING A
L
M Group: 6
DL=2.52K Anchorage Design Uplift Force = 5 kips
LL=8.4 K Anchorage Design Shear Force = 1.2D + 1.6L = 16.46 kips
Fp= 0.4*Sds*Ka*Ie*Wp Anchorage Design Moment due to shear force = 16.46k x 5.67 in = 93.33 k-in
Fp= 0.4*1.204*2*1*0.73*7
Fp= 5 K
N
ASI DATE
ASI-001 01-15-2024
Sheet No:
S-A0-121