c. planning is not adequate.

CHƯƠNG 1:
d. support of senior management
Câu 1: Typically, a steering team or leadership
team is responsible for all of the following Câu 5: Projects are considered successful for all
project related roles EXCEPT: of the reasons below EXCEPT:

a. ensuring accurate progress is reported and a. the organization captures lessons learned for
adjustments made future projects
b. providing rigid policies, procedures, b. members of the team learn new skills
standards and guidelines working on the project.

c. aligning projects with the organization’s c. the organization reaps business level benefits
strategic plans
d. the team has demonstrated heroics to meet
d. selecting, prioritizing and resourcing project objectives
projects
Câu 6: Which of the following roles is typically
Câu 2: A project manager in agile projects who associated with the project manager?
serves and leads in a collaborative, facilitation
a. the person responsible for providing the
manner is called a:
financial resources and support for the project
a. sponsor and is accountable for enabling success.

b. functional manager b. the person with management authority over


a unit within a functional organization
c. scrum master
c. the person responsible for project methods,
d. program manager standards and training
Câu 3: Which of the following statements d. the person assigned by the performing
correctly describes project management? organization to lead the team that is
a. Project management should not involve responsible for achieving the project objectives
tradeoffs between scope, schedule and cost. Câu 7: Typically, the senior customer
b. Project management’s goal is to maintain representative is responsible for which of the
efficiency of ongoing operations. following project roles?

c. Project management applies knowledge, a. ensures the needs of the customer’s


skills, tools and techniques to project activities. organization are identified and prioritized

d. Project management only relies upon b. helps the project manager with running
checklists to plan and execute the work. meetings and providing status reports

Câu 4: Project failure can result from all of the c. determines how the project work will be
following causes EXCEPT: accomplished
a. changes in scope are not agreed upon by all d. develops the project schedule and budget
parties involveD
Câu 8: Which of the ten knowledge areas
b. too little time is allowed for project defined in the Project Management Body of
completion. Knowledge includes the processes required to
ensure that the project includes all the work
required, and only the work required, to Câu 12: Which of the following examples is NOT
complete the project successfully? a typical or appropriate situation to employ
project management?
a. Project stakeholder management
a. improving a soldering process in an assembly
b. Project quality management line
c. Project scope management b. processing deposits and withdrawals in a
bank
d. Project communications management
c. installing a new accounting application on to
Câu 9: In the PMBOK, the five logical groupings
a server
of the project management inputs, tools and
techniques, and outputs are called the: d. developing a new medical device for use by
clinics
a. life cycle stages
Câu 13: Once projects are completed, they will
b. project management process groups
typically yield all of the following results
c. project management knowledge areas EXCEPT:

d. phases and gates a. stakeholders whose interests are affected by


the outcome
Câu 10: Which of the ten knowledge areas
defined in the Project Management Body of b. a unique product, service or result
Knowledge includes the activities of purchasing
c. a primary deliverable along with supporting
or acquiring products, services or results from
outside the project team? deliverables

a. Procurement management d. make or buy decisions

b. Communications management Câu 14: In an adaptive or change - driven


project life cycle:
c. Scope management
a. planning precedes all executing
d. Quality management
b. the product or deliverable is well understood
Câu 11: All of the following factors have
influenced the increased reliance upon project c. early results lead into planning later work
management in recent years EXCEPT: d. the waterfall approach is commonly used
a. the decreased demands of ongoing
Câu 15: When applied to project management,
operational work
the human resource management knowledge
b. rapid growth and changes in the information area typically involves which of the following
technology and telecommunications activities?

c. realization that methods for large projects a. organizing, managing and leading the
can be modified and used for small projects project team
d. increased international competition and its b. estimating, budgeting and controlling project
influence on consumer demands costs

c. identifying, analyzing and controlling project


risks
d. determining the work necessary for project b. tradeoffs between schedule, scope and
completion quality

Câu 16: Which of the following examples is NOT c. resource availability


a typical or appropriate situation to employ
project management? d. ongoing operations

a. installing a new computer system Câu 4: All of the following organizations can
effectively use a scoring model to select and
b. developing a new product prioritize competing projects EXCEPT:

c. improving an existing work process a. contractor companies

d. conducting a routine, standard customer b. program management office


service operation c. client companies

CHƯƠNG 2: d. the leadership team

Câu 1: Which of the following statements Câu 5: Which of the following statements best
concerning strategic analysis is true? describes the contemporary use of financial
models and scoring models for project
a. External analysis focuses on the threats and selection?
opportunities facing the organization.
a. These methods are often used together to
b. Internal analysis focuses on the threats and ensure financial and non-financial factors are
opportunities facing the organization both considereD.

c. External analysis focuses on the strengths and b. Financial methods are preferred because
weaknesses of the organization. they ensure alignment with the organization’s
strategic goals.
d. Strategic analysis focuses exclusively upon
c. One of these techniques is typically used to
external analysis
the exclusion of the other, due to time demands
Câu 2: All of the following statements
d. Scoring models are unreliable because they
concerning project portfolios are true EXCEPT:
fail to consider financial factors.
a. Portfolios usually include a mix of high-risk
Câu 6: Consider the information provided in
and low-risk projects
Figure below, which project is least d. helps
b. The projects in a portfolio are grouped to be stakeholders to understand the direction of the
managed collectively firm.attractive based on the strategic fit?

c. Portfolios cannot include operations and


programs

d. All projects in a portfolio contribute to the


organization’s goals

Câu 3: Portfolios deal with all of an


organization’s projects, while programs deal
with
a. specific group of related projects a. Project D
b. Project A Câu 10: All of the following factors should be
assessed to determine an organization’s ability
c. Project B to perform projects EXCEPT:
d. Project C a. Does the organization have a clearly defined
Câu 7: Which of the following statements project management process?
correctly describes a weakness associated with B . Does the organization have free and open
the financial project selection model? communication, creativity, and empowered
a. The Net Present Value (NPV) method does decision making?
not consider the time value of money. c. Does the organization monitor and
b. The benefit-to-cost models favor projects understand it’s external environment?
which generate the smallest absolute return d. Do teams and individuals follow instructions
over a specified perioD well?
c. Payback period models do not consider the Câu 11: All of the following may be negotiated
profit to be realized after the costs are paid. between a client company and a contractor
d. The Internal Rate of Return (IRR) method is EXCEPT:
difficult to use when a project has conventional a. selection criteria for scoring models
cash flows.
b. personnel assignments
Câu 8: Which of the following responses most
accurately depicts the correct sequence of c. the amount of money to be paid.
activities in the strategic planning process?
d. quality standards
a. strategic analysis - guiding principles -
strategic objectives - flow-down objectives Câu 12: Based on the information provided in
Figure below, which criterion is most important
b. strategic objectives - strategic analysis - to the leadershipt team?
guiding principles - flow-down objectives
a. strategic fit
c. guiding principles - strategic analysis -
strategic objectives - flow-down objectives b. probability of success

d. guiding principles - strategic objectives - flow- c. market potential


down objectives - strategic analysis a. strategic fit
Câu 9: A clear and compelling vision will have all
the following characteristics EXCEPT
a. often requires several years to achieve.

b. often requires extra effort to achieve.


c. provides detailed roadmap for managing a
project
c. provides detailed roadmap for managing a
project
Câu 13: All of the following criteria serve as a
valid basis for identifying potential projects in
most organizations EXCEPT:
a. technological advances
b. social need
c. internal politics
d. environmental considerations
Câu 17: Portfolio management helps an
Câu 14: All of the following factors influence the organization achieve its strategic goals in all of
opportunities and threats an organization must the following ways EXCEPT:
consider when performing a strategic analysis
EXCEPT: a. providing needed resources

a. Suppliers b. prioritizing work to be done


b. Employees c. managing ongoing projects
c. regulatory agencies d. selecting the right projects
d. Competitors Câu 18: Which of the following is NOT a typical
Câu 15: Once selected projects have been source selection criterion that an organization
prioritized, it is time to assign resources to would use to evaluate potential contractors?
projects based on their order of priority. a. personalities
Resources could include all of the following
EXCEPT: b. references

a. subject matter experts c. life cycle cost

b. money d. technical approach

c. quality metrics Câu 19: All of the following represent


appropriate sources to identify new potential
d. equipment projects EXCEPT:
Câu 16: Consider the information provided in a. industry and trade journals
Figure below. Based on the results in the
project selection and prioritization matrix, b. existing and potential customers
which project would you select if you were
c. the operations staff within the organization
limited to selecting only
d. lessons learned from previous projects
a. Project C
Câu 20: Many writers have stated that effective
b. Project A
objectives should be:
c. Project D
a. unachievable - to inspire maximum
d. Project B performance
b. broad - to cover many dimensions of the
business
c. measurable - to track progress Câu 5: These cultural characteristics create an
environment conducive to completing most
d. resource based - to focus on the inputs complex projects involving people from
different disciplines EXCEPT FOR
CHƯƠNG 3:
a. High conflict tolerance
Câu 1: Which of the following is an advantage
associated with managing projects in a b. Independent Unit integration
functional organization?
c. High risk tolerance => Sai
a. Each unit contains a variety of specialists
d. Medium Control
suited to solving complex problems.
Câu 6: …………involves the degree to which units
b. Combines task focus with technical capability.
within the organization are encouraged to
c. Rapid communication between the various operate in a coordinated or interdependent
functions working on the project. manner.

d. Unity of command - one clear supervisor for a. Team emphasis


each worker.
b. Unit integration
Câu 2: The …….the levels of Need for integration
(number of departments involved), the c. Conflict tolerance
………….autonomy and authority the project. d. Management focus
a. lower; more Câu 7: ……………. involves the creation of a
b. Higher; Less breakthrough product or process, which are
high-risk.
c. Higher; more
b. Incremental projects
Câu 3: Which project structure is most
appropriate for Incremental projects? c. Advanced development projects

a. Strong Matrix d. R&D projects

b. Functional Câu 8:……………. involve minor adjustments in


existing products and processes, which are low-
c. Dedicated Team Project risk
d. Weak Matrix a. Incremental projects

Câu 4: Projectized organizations often adopt b. Advanced development projects


which of the following techniques where
project team members are physically placed c. R&D projects
close to one another to improve d. Platform projects
communications and working relationships?
Câu 9: If over …………… percent of work involves
a. coordination projects, then an organization should consider a
b. co-location fully projectized organization.
a. 60%
c. consolidation
b. 40%
d. collaboration
c. 75% a. Platform projects

d. 50% b. Incremental projects

Câu 10: Which project structure is most c. R&D projects


appropriate for Platform projects?
d. Advanced development projects
a. Functional
Câu 15: All of the following are advantages
b. Strong Matrix associated with managing projects in a
projectized organization EXCEPT:
c. Weak Matrix
a. New assignment is guaranteed after the
d. Dedicated Team Project project ends
Câu 11: Some organizational culture b. Departmental barriers are reduceD.
characteristics make project success more
likely. These characteristics include all of the c. One boss - the project manager
following EXCEPT: d. Response times and decision making are
a. collaboration to meet organizational goals swift.

b. engagement of stakeholders Câu 16: Which of the following is an advantage


associated with the matrix organization?
c. lack of appreciation for project management
a. Faster response times and decision making.
d. teamwork across cultures
b. Unity of command - one clear supervisor for
Câu 12: Which project structure is most each employee.
appropriate for the advanced development
projects? c. Resources can be shared between
departments and projects.
a. Dedicated Team project
d. Having multiple bosses.
b. Weak Matrix
Câu 17: Which organization is closest to
c. Strong Matrix Functional organization?
d. Functional a. Strong Matrix
Câu 13: In which structure, it is most Difficult for b. Balanced Matrix organization
the personel transition in the post project
period: c. Weak Matrix organization

a. Functional d. Projectized organization

b. Balanced Matrix Câu 18: These factors should influence the


choice of project management structure
c. Dedicated Team Project EXCEPT:
d. Dedicated Team Project a. Size of project. => SAI
Câu 14: ……………. involve system upgrades that b. Project manager
yield new products and processes, which are
medium-risk. c. Budget and time constraints.
d. Strategic importance. Sai Câu 23: When trying to understand a corporate
culture, it is helpful to understand the types of
Câu 19: These cultural characteristics create an power that are used. In “power cultures”:
environment conducive to completing most
complex projects involving people from a. supervisors exert a great deal of economic
different disciplines EXCEPT FOR and political power.

a. High risk tolerance b. deference is paid to knowledge rather than


authority.
b. External open-system focus
c. collaboration is believed to be satisfying and
c. High conflict tolerance
stimulating.
d. Individual Emphasis
d. workers closely follow their appointed roles.
Câu 20: Through shared values, organizational
Câu 24: Which of the following organizational
cultures can informally do all the following
structures runs contrary to the unity of
EXCEPT
command principle - that each employee works
a. establish how cooperation, competition, for a single supervisor?
conflict and decision making are handleD.
a. siloed organization
b. determine how people are treated,
b. projectized organization
controlled and rewardeD.
c. matrix organization
c. eliminate politics in the workplace
d. functional organization
d. motivate the ethical actions and
communications of managers and subordinates. Câu 25: Which structure is most helpful to share
resources across multiple projects and
Câu 21: ……………is the degree to which functional domains while at the same time
employees are encouraged to be aggressive, creating legitimate project leadership?
innovative, and risk seeking
a. Projectized organisation
a. Management focus
b. Functional
b. Risk tolerance
c. Matrix
c. Means versus end orientation => SAI
d. Dedicated Team Project
d. Open-systems focus => SAI
Câu 26: ………… involves the degree to which
Câu 22:…………………… involves the degree to employees identify with the organization as a
which work activities are organized around whole rather than with their type of job or field
groups rather than individuals.
of professional expertise
a. Member identity => SAI
a. Member identity
b. Team emphasis
b. Team emphasis
c. Conflict tolerance
c. Management focus
d. Management focus
d. Control
Câu 27: Which of the following is a c. Project teams may jump start the effort with
disadvantage associated with managing a brainstorming session.
projects in a projectized organization?
d. Project teams may adopt a top-down
a. Traditional department barriers are reduceD. approach to construct the WBS.
b. Team members have difficulty focusing on Câu 4: …………….. is the tendency for the project
project issues. scope to expand over time—usually by changing
requirements, specifications, and priorities.
c. Response times and decision making are
slow. a. scope creep

d. Team members assigned to a project are b. benchmark.


often underutilizeD.
c. baseline.
CHƯƠNG 4:
d. requirement.
Câu 1: The approved set of procedures that
describe how modifications to the project Câu 5: The Work Breakdown Structure (WBS) is
deliverables and documentation will be a framework that will be used as a basis for
managed and controlled are collectively known further planning activities including all the
by which of the following terms? following EXCEPT:

a. change control system a. developing the project cost estimate

b. scope statement b. identifying key stakeholders

c. configuration management plan c. identifying project risks

d. scope management plan d. developing the project schedule

Câu 2: A project communications management Câu 6: A deliverable at the lowest level of each
plan generally includes all of the following branch of a work breakdown structure is known
information EXCEPT: as:

a. communication timing a. a control account

b. communication methods b. a work package.

c. communication purpose c. a work unit.

d. communication cost d. a work element.

Câu 3: All of the following statements correctly Câu 7: ……………provides a framework to


describe a contemporary approach to create summarize organization unit work performance,
the Work Breakdown Structure (WBS) for a identify organization units responsible for work
project EXCEPT packages, and tie the organizational unit to cost
control accounts.
a. Project teams may rely upon a WBS from a
previous project as a starting point. a. organization breakdown structure
b. Process Breakdown Structure
b. Project teams may rely upon the project
manager to create the entire WBS c. Requirements Traceability Matrix
d. Work Breakdown Structre b. Benefit

Câu 8: All of the following conventions are c. Scope


widely adopted when project teams create the
second level of the project Work Breakdown d. Cost
Structure (WBS) EXCEPT Câu 12: Which of the following is not a format
a. The second level may be organized by that is typically used to represent a Work
activities and tasks Breakdown Structure?
a. Requirements Traceability Matrix
b. The second level may be organized by major
design components. b. Hierarchical
c. The second level may be organized by project c. Indented outline
phase.
d. Free Format
d. The second level may be organized by work
function. Câu 13: The process of “systematically gathering
and analyzing quantitative and qualitative
Câu 9: Work Breakdown Structures typically information to determine whose interests
include one or more intermediate levels. Which should be taken into account throughout the
of the following statements correctly describe project” is called:
the nature of these intermediate levels?
a. stakeholders
a. They generally represent items that need to
be created in order to create the final b. develop project management plan
deliverables. c. communications management
b. They generally represent the resource d. stakeholder analysis
assignments to create the final deliverables.
Câu 14: Stakeholders include all of the following
c. They generally represent the sequence and people EXCEPT:
timing of work packages
a. those who will not be impacted by the
d. They generally represent the raw materials project
required to create the final deliverables.
b. those who work on the project
Câu 10: A priority matrix for the project
c. those whose routines may be disrupted by
identifies which criterion is as below EXCEPT
the project
a. constrained
d. those who provide people or resources for
b. trade-off the project

c. enhanced Câu 15: In the project communications matrix,


all of the following “who” items are typically
d. accepted included EXCEPT:
Câu 11: The priorities of the project are a. Who does the project team need to share
normally established in terms of those elements with?
EXCEPT
b. Who take the minutes at the next status
a. Time meeting?
c. Who on the project team is responsible for a c. trade-off
communication?
d. accept
d. Who does the project team need to learn
from? Câu 20: The technique for dividing and
subdividing the project scope and project
Câu 16: For each component in the Work deliverables into smaller, more manageable
Breakdown Structure (WBS), the WBS dictionary parts is called:
includes all the following fields that will be
a. decomposition
progressively elaborated EXCEPT:
a. type of resources needed b. rolling wave planning

b. names of team member(s) responsible for c. parent child relationship


creating the deliverables d. requirements traceability
c. a list of associated deliverables Câu 21: A typical change request form will
d. a brief description of the work include which of the following content items?

Câu 17: Which of the following statements a. a change control process flow diagram
concerning work packages is NOT correct? b. a description of the change along with the
a. Work packages are activity elements with impact of making the change
detailed descriptions of tasks and c. an issues log
dependencies
d. a summary of previous changes to the project
b. Work packages are the basis for subsequent
project planning activities. Câu 22: The sponsor, project manager and team
can establish powerful relationships with key
c. Work packages are the basis for subsequent stakeholders. This starts with an understanding
project control activities. of what motivates each stakeholder, which can
d. Work packages are the elements at the be summarized by the old saying ______:
lowest level of the WBS. a. you get what you pay for.
Câu 18: More complex …………not only identify b. what gets planned gets done.
individual responsibilities but also clarify critical
interfaces between units and individuals that c. the early bird catches the worm.
require coordination on a project.
d. what’s in it for me?
a. Work Breakdown Structre
Câu 23: Which of the following items best
b. Reponsibility Matrix describes a project Work Breakdown Structure
(WBS)?
c. Process Breakdown Structure
a. an organizational chart depicting who will
d. organization breakdown structure
perform project work
Câu 19: In which sitiuation that the original
b. a schedule depicting when project work will
parameter of the project is optimized?
be performed
a. enhance
c. a tool that the team uses to progressively
b. constrain divide deliverables into smaller pieces
d. a list of activities to complete the project b. Who
work packages c. When
Câu 24: Define Scope is the process of
d. What
developing:
Câu 28: All of the following elements should be
a. a project scope management plan.
included in a project scope statement EXCEPT:
b. a project scope network diagram
a. names of the project team members
c. a detailed description of the project and
b. project boundaries or exclusions
product.
c. assumptions and constraints that may limit or
d. a project work breakdown structure.
influence project work
Câu 25: What are the six elements of a typical
d. key deliverables with acceptance criteria
scope statement?
Câu 29: What is the document issued by upper
a. Project objective, Deliverables, Priorities, management and provides the project manager
Technical requirements, Limits and exclusions, with written authority to use organizational
Reviews with customer resources for project activities.

b. Project objective, Deliverables, Milestones, a. Project definition


Technical requirements, Limits and exclusions,
b. project scope statement
Reviews with customer
c. Statement of work
c. Project charter, Deliverables, Milestones,
Customer requirements, Limits and exclusions, d. project charter
Reviews with customer
Câu 30: In which sitiuation that the original
d. Project objective, Deliverables, Milestones, parameter is fixed (eg. the project must meet
Technical requirements, Limits and exclusions, the completion date, specifications and scope of
Change Control the project, or budget)
a. enhance
Câu 26: By identifying stakeholders and their
needs, project managers can be more effective b. trade-off
in all the following ways EXCEPT:
c. accepte
a. serve as good stewards of the organization’s
resources d. constrain

b. develop a shared sense of risk. CHƯƠNG 6:


c. prioritize among competing objectives Câu 1: The latest finish time of a specific activity
is
d. derive the final budget
a. always equal to the activity's earliest finish
Câu 27: A project communications matrix time
includes all of the following information
EXCEPT: b. same as the latest finish time of the activity's
successor activities
a. Why
c. dependent upon the predecessor's latest b. of the part of the activity that has more than
finish time one work resource assigned
d. the latest time the activity can be started for c. during which the project is expected to be
the project to be completed on time accomplished
Câu 2: Free slack is calculated by finding the d. during which the activity has waiting time for
lowest of the values of total slack for all the the activity to be accomplished
activities entering into a specific activity and
then Câu 5: Free slack of an activity is

a. adding it from the values of total slack for the a. the estimated durations of each activity
other activities also entering into that same b. the amount of slack for each activity
activity
c. the cost of the activity
b. subtracting it from the values of total slack
for the other activities also entering into that d. the number of resources assigned to the
same activity activity
Câu 6: People sometimes perform to
c. adding it from the values of total slack for the
expectations, their effort will expand to fill the
other activities succeeding after that same
whole number of scheduled days allotted,
activity
a. even if the activity could have been
d. subtracting it from the values of total slack
for the other activities succeeding after that performed in a shorter time
same activity b. even if the activity could have been
Câu 3: Earliest start time (ES) is the earliest time performed in a longer time
at which a specific activity can begin
c. even if the number of resources assigned to
a. calculated on the basis of the project the task is reduced
estimated finish time and the estimated
d. even if part of the time for the task is waiting
durations of preceding activities
time
b. calculated on the basis of the project
Câu 7: All of the following items can provide
estimated start time and the estimated
useful assistance to a project team to define the
durations of approaching activities activities of a project EXCEPT:
c. calculated on the basis of the project a. schedules from similar projects that are
estimated start time and the estimated already completed
durations of preceding activities
b. checklists for projects of the same type
d. calculated on the basis of the project
estimated start time and the estimated c. issue logs
durations of succeeding activities
d. the work packages from the Work
Câu 4: The estimated duration for each activity Breakdown Structure
is indicated by a bar spanning the period
Câu 8: If the total slack for a project is 4 days,
a. during which the activity is expected to be this means
accomplished
a. is the longest path in the overall network c. day 3
diagram
d. day 4
b. always has a negative slack
Câu 12: Earliest finish time (EF) is the earliest
c. always has a positive slack time by which a specific activity can be
completed, calculated
d. cannot change once the project has started
a. by adding the activity’s estimated duration
Câu 9: Latest finish time (LF) is the latest time to the earliest start time of the activity's
by which a specific activity must be succeeding activity: EF = ES succeeding activity
a. completed in order for the entire project to + Estimated Duration
be started by its required completion time
b. by adding the activity’s estimated duration to
b. started in order for the entire project to be the activity’s earliest start time: EF = ES +
started by its required completion time Estimated Duration

c. completed in order for the entire project to c. by subtracting the activity’s estimated
be finished by its required completion time duration to the activity’s earliest start time: EF =
ES - Estimated Duration
d. started in order for the entire project to be
finished by its required completion time d. by subtracting the activity’s estimated
duration from the earliest finish time of the
Câu 10: Positive slack indicates the maximum
activity's predecessor: EF = EF predecessor -
amount of time
Estimated Duration
a. that the activities on the critical path
Câu 13: Total slack for the project is the
should be accelerated to complete the project
difference between
by the required completion time
a. EF time of last activity and the project
b. that the activities on a particular path can
required completion time
be delayed without jeopardizing completion of
the project by the required completion time b. LF time of last activity and the project
required completion time
c. that each of the activities in the project can
be delayed without jeopardizing completion of c. LS time of last activity and the project
the project by the required completion time required completion time

d. that the activities with the positive slack d. ES time of last activity and the project
should be accelerated to complete the project required completion time
by the required completion time
Câu 14: Calculate the latest finish for Task D if
Câu 11: Calculate the earliest start for Task D if one of its successors, Task F, has a latest start
one of its predecessors, Task A, finishes on day on day 9, its other successor, Task E, has a latest
3, its other predecessor, Task C, finishes on day start on day 10, and the duration of Task D is 2
4, and the duration of Task D is 2 days days

a. Cannot be calculated based upon information a. day 10


given
b. day 9
b. day 6
c. Cannot be calculated based upon information a. 17 days
given
b. 15 days
d. day 12
c. 30 days
Câu 15: The total completion time is 25 days.
Task A is planned to take seven days. Task B is d. 16 days
planned to take five days. Task C is planned to
Câu 18: Consider the Lab Experiment Project
take eight days. The tasks have a serial
depicted in Figure 7-4. Based on the
relationship. How much slack does the project
information provided, how many days can you
have?
delay the calibration of the instrumentation
a. Positive 3 days slack (Activity B), without impacting the expected
project completion date?
b. Positive 5 days slack
c. Negative 5 days slack

d. Positive 17 days slack


Câu 16: In order to establish a basis from which
to calculate a schedule using the estimated
durations for the activities, it is necessary to
a. select an estimated start time and a
required completion time for the overall
project
b. say who has responsibility for the first task

c. enter the tasks into a project management a. 1 days


information system
b. 0 days
d. edit the calendars for the resources in the
c. 2 days
project management information system
d. 4 days
Câu 17: Consider the System Integration Project
depicted in Figure 7-3. Based on the Câu 19:The critical path of a project
information provided, what is the expected
duration of this project? a. the slack on activities that do not have any
costs associated with them

b. can be calculated on every activity with a


serial relationship to its successors
c. is always a negative value

d. the amount of time an activity can be


postponed and not delay the start of its
immediately succeeding activities
Câu 20: As the project progresses, the actual a. lead
finish times (AFs) of completed activities will
determine b. reserve

a. the earliest start and earliest finish times for c. free float
the completed activities in the network d. contingency
diagram, as well as the total slack
Câu 24: Having the person who will be
b. the latest start and latest finish times for the responsible for performing a specific activity
remaining activities in the network diagram, as estimate the duration for that activity ____
well as the total slack from that person and ____ that may be
introduced by having one person estimate the
c. the latest start and latest finish times for the durations for all of the activities.
completed activities in the network diagram, as
well as the total slack a. takes more effort, creates a problem

d. the earliest start and earliest finish times for b. elevates the placement perception, creates
the remaining activities in the network errors
diagram, as well as the total slack c. generates a commitment , avoids any bias
Câu 21: Total slack for a project that is negative d. gives the status of the project, sets best
represents the amount of time that practices
a. the activities on the path must be accelerated
Câu 25:The earliest start time for an activity is
by four days for the project to be completed on
time a. is the same as the earliest start time of the
activity's predecessor
b. all the activities can be delayed by four days
and the project still be completed on time b. is calculated by adding the activity's
estimated duration to its earliest start time
c. the activities on the path can be delayed a
total of four days and the project still could be c. is dependent upon the start time of its
completed on time successor activities
d. all the activities must be accelerated by four d. should not be delayed or would cause the
days for the project to be completed on time project to be delayed

Câu 22: An activity that logically comes before a Câu 26: Latest start time (LS) is the latest time
dependent activity in a schedule is called a ___: by which a specific activity must be

a. leader activity a. finished in order for the entire project to be


started by its required completion time
b. predecessor activity
b. started in order for the entire project to be
c. mandatory activity finished by its required completion time
d. successor activity c. started in order for the entire project to be
started by its required completion time
Câu 23: The amount of time a schedule activity
can be delayed without delaying the early start d. finished in order for the entire project to be
date of any successor is known as: finished by its required completion time
Câu 27: If an organization or subcontractor has b. It does not accurately address the case when
performed similar projects in the past and has two activities both need to be accomplished
kept records of how long specific activities before a third can begin.
actually took, these historical data
c. There is no assurance that three estimates
a. should be shared with the customer after the are any more accurate than one
contract is signed to show that the contractor
can complete the project d. It often requires more effort to generate
three estimates than one.
b. can be used as a guide in estimating the
durations of similar activities for future Câu 30: Negative slack indicates a lack of slack
projects over the entire project and the amount of time
a. each activity on the critical must be
c. should be stored in files
accelerated to complete the project by the
d. have no value for the current project required completion time

Câu 28: Consider the Research Project depicted b. an activity must be accelerated to complete
in Figure 7-2. Based on the information the project by the required completion time
provided, what is the slack associated with
c. all activities in the project must be
activity C - “Review Reports”?
accelerated to complete the project by the
required completion time

d. an activity must be delayed to complete the


project by the required completion time
Câu 31:Calculate the earliest finish for Task D if
one of its predecessors, Task A, finishes on day
3, its other predecessor, Task C, finishes on day
4, and the duration of Task D is 2 days.
a. day 6

b. day 3
c. day 4
a. 4 days

b. 1 days d. Cannot be calculated based upon


information given
c. 2 days
Câu 32: The sequencing of activities is often
d. 0 days based upon dependencies between the
activities. The dependencies that should guide
Câu 29: Despite the insights that PERT provides, activity sequencing can be either:
there are still practical limitations that impact
its usefulness. All of the following difficulties are a. interior or exterior
associated with the use of PERT EXCEPT: b. critical or non-critical
a. It highlights uncertainty in project duration c. opportunities or threats

d. mandatory or discretionary
Câu 33: Latest start time is calculated by d. the ES of the activity and the LF of the activity
or the difference between the EF and LS of the
a. subtracting the activity’s estimated duration
activity
from the activity’s latest finish time: LS = LF –
Estimated Duration CHAPTER 13:
b. adding the activity’s estimated duration to Câu 1: Consider the project performance report
the activity’s latest finish time: LS = LF + presented in figure 14.1. Your analyst has
Estimated Duration determined that your estimate to complete
(ETC) is $226,000. Based on your performance
c. adding the activity’s estimated duration to date and assuming future performance will
to the predecessor of the activity’s latest start proceed at the same level of efficiency as past
time: LS = LS predecessor + Estimated Duration performance, what is your estimate at
completion (EAC)?
d. subtracting the activity’s estimated duration
from the activity's succeeding activity’s latest
finish time: LS = LF succeeding activity –
Estimated Duration
Câu 34: The ES and EF times are determined by
calculating forward, that is, by
a. working through the network diagram from
the end of the project to the beginning of the
project a.$550.000

b. calculating the optimistic and pessimistic b. $542,000


times for the project c.$568.000
c. adding all the times together for the project d. It can not be determined from the
d. working through the network diagram from information provided.
the beginning of the project to the end of the Câu 2: For a project, the BAC = $200,000, the EV
project = $120,000, the AC = $100,000. Which of the
following statements is true?
Câu 35: Total slack is calculated for each of the
activities by finding the difference between a. The project has a negative cost variance and
corrective action is needed
a. the EF of the activity and the LS of the activity
or the difference between the ES and LF of the b. The project is progressing well and should
activity be continued
b. the ES of the activity and the LF of the activity c.The CPI is less than 1.0
or the difference between the ES and LF of the
activity d. The EAC is greater than the budget and the
project scope should be adjusted
c. the EF of the activity and the LF of the
activity or the difference between the ES and Câu 3: The cost performance index (CPI) is a
measure of the cost efficiency with which the
LS of the activity
project is being performed. If the cumulative
earned value is greater than the cumulative
actual costs, then
a. the CPI is negative a. replace communication methods as soon
as new methods emerge
b. the CPI is less than 1.0
b. provide information soon enough so that it
c. CPI cannot be determined with BCWP and
is useful to the recipient
ACWP
d. the CPI is greater than 1.0 c. use emails as the only form of
communications
Câu 4: Consider the project performance report
presented in figure 14.1. What valid conclusion d. target communications to as many people as
can you draw regarding the project schedule possible
performance as of October 31, 20XX?
Câu 7: A third method for determining the
forecasted cost at completion is to re-estimate
the costs for all the remaining work to be
performed and then add this re-estimate to the
cumulative actual cost. If the amount of
cumulated actual costs is less than difference
between the total budgeted cost and the re-
estimate, then

a. The project is $26,000 ahead of schedule a. the EAC is less than the BAC

b. The project is $18,000 behind schedule. b. the EAC is greater than the BAC

c. The project is 18 days behind schedule c. the EAC cannot be calculated with the values
given
d. The project is $26,000 behind schedule.
d. additional information is needed to predict
Câu 5: Calculate the forecasted cost at the EAC
completion if the total budgeted cost is (PV)
$15,000, the cumulative actual cost (AC) is Câu 8: Which of the following measures is best
$10,000, and the cumulative earned value is suited for determining whether the project is
(EV) $12,000. Assuming that, regardless of the on, ahead or behind schedule?
efficiency rate the project or work package has
experienced in the past, the work to be a. Schedule Variance (SV)
performed on the remaining portion of the b. Estimate to Complete (ETC)
project or work package will be done according
to budget. c. Schedule Compliance (SC)

a. EAC = $13,000 d. To Complete Performance Index (TCPI)

b. EAC = $7,000 Câu 9: Consider a project that involves painting


five similar houses over ten weeks (one house
c. EAC = $17,000 => SAI every two weeks) for a total budgeted cost of
$20,000. The budget is $4,000 per house. At of
d. EAC = $37,000 the end of week 5, you determine that $10,000
Câu 6 has actually been spent and three houses have
: Which of these guidelines should be used to been painted completely.What is the earned
handle project information needs? value of the project?
a. $20,000 Câu 13: The budgeted cost of work scheduled is
b. $4,000 a. the sum of all the funds expended to a point
in time in the project
c. $12,000
b. the aggregate estimated costs of all the
d. $10,000
activities
Câu 10: If the cumulative earned value is $10
and the cumulative actual costs are $20, then c. the amount budgeted to accomplish the
the CPI is work scheduled to a point in time in the
project
a. $10
d. the committed costs for an activity
b. 2.0
Câu 14: The ____ is the amount that was
c. 0.5 budgeted to accomplish the work that was
d. -$10 schedule to be performed up to that point in
time.
Câu 11: Determining the earned value involves
a. cumulative earned value (CEV)
collecting data on the percent complete for
each work package and then converting this b. Budgeted cost of work scheduled (BCWS)
percentage to a dollar amount by multiplying
the ____ of the work package by the percent c. total budgeted cost (TBC)
complete. d. cumulative actual cost (CAC)
a. cumulative budgeted cost (CBC)
Câu 15: The ____ is the sum of the estimated
b. budgeted cost at completiong (BAC) costs of all the specific activities that make up a
work package or the project.
c. cumulative earned value (CEV)
a. cumulative earned value (CEV)
d. cumulative actual cost (CAC)
b. Budgeted cost at Completiong (BAC)
Câu 12: A second method for determining the
forecasted cost at completion assumes that, c. cumulative budgeted cost (CBC)
regardless of the efficiency rate the project or d. cumulative actual cost (CAC)
work package has experienced in the past, the
work to be performed on the remaining portion Câu 16: Another indicator of cost performance
of the project or work package will be done is cost variance (CV). If the cumulative earned
according to budget. If the cumulative actual value is greater than the cumulative actual
cost is greater than the cumulative earned costs, then
value, then
a. the CV is positive
a. the EAC is less than the BAC
b. CV cannot be determined with CEV and CAC
b. the EAC is greater than the BAC
c. the CV is negative
c. additional information is needed to predict
d. the CV is equal to the TBC
the EAC
Câu 17: The ____ is the amount that was
d. the EAC cannot be calculated with the values
actually spent to accomplish the work that was
given
scheduled to be performed up to that point in Câu 21: Earned value, the value of ____, is a key
time parameter that must be determined throughout
the project.
a. cumulative earned value (CEV)
a. the resources assigned
b. total budgeted cost (TBC)
b. the resources used
c. actual cost (AC)
c. the work actually performed
d. cumulative budgeted cost (CBC)
d. the work scheduled
Câu 18:The ____ is a measure of the cost
efficiency with which the project is being Câu 22: The positive cost variance means
performed.
a. more money was spent on the project than
a. cost production index was planned
b. cost performance index b. less money was spent on the project than
the value of the work performed
c. cumulative performance factor
c. less money was spent on the project than
d. cost quality index
was planned
Câu 19: To keep track of ____ on a project, it’s
d. more money was spent on the project than
necessary to set up a system to collect, on a
the value of the work performed
regular and timely basis, data on funds actually
expended. Câu 23: ____ involves the following: Analyzing
cost performance to determine which work
a. projected cost
packages may require corrective action;
b. budgeted cost Deciding what specific corrective action should
be taken; and Revising the project plan,
c. estimated cost including time and cost estimates, to
d. actual cost incorporate the planned corrective action.

Câu 20: A method for calculating the estimated a. Problem solving


cost at completion assumes that the work to be b. Cost control
performed on the remaining portion of the
project or work package will be done at the c. Resource analysis
same rate of efficiency as the work performed
d. CPI monitoring
so far. If the cost performance index is greater
than 1.0, then Câu 24: Allocating total project costs for the
various elements to the appropriate work
a. the EAC is less than the BAC
packages in the work breakdown structure will
b. additional information is needed to predict establish a ____ for each work package.
the EAC
a. total quality cost
c. the EAC is greater than the BAC
b. total control cost
d. the EAC cannot be calculated with CPI
c. total budgeted cost

d. total allocated cost


Câu 25: While the manage communications d. optimistically plan the budget to win more
process is underway, effective information contracts
distribution often requires the project manager
and team to accomplish all of the following Câu 29: For a project, the BAC = $200,000, the
activities EXCEPT: EV = $100,000, the AC = $120,000. Which of the
following statements is true?
a. report project performance to stakeholders
a. The CPI is more than 1.0
b. determine any information needs not already
uncovered b. The EAC is less than the budget and the
project scope should be adjusted
c. develop responses to identifies risks
c. The project is progressing well and should be
d. establish an information retrieval and continued
distribution system
d. The project has a negative cost variance and
Câu 26: What is the cost variance for a project corrective action is needed
that has a BAC = $50,000, a EV = $25,000, AC =
$20,000, and PV = $22,000 Câu 30: ____ is the value of the work actually
performed, and is a key parameter that must be
a. CV = - $5,000 determined throughout the project.
b. CV = $5,000 a. Interest
c. CV = - $2,000 b. Earned value

d. CV = $2,000 c. Anticipated value

Câu 27: It’s important that the person d. Forecasted value


estimating the percent complete not only
Câu 31: The ____ is the product of the percent
assess how much work has been performed but
complete and the sum of the estimated costs of
also consider
all the specific activities that make up a work
a. what work should have been done package or the project.

b. what work others have to do on other a. cumulative earned value (BCWP)


projects b. total budgeted cost (TBC)
c. the cost of the work c. cumulative budgeted cost (CBC)
d. what work remains to be done d. cumulative actual cost (CAC
Câu 28: The key to managing a cash flow is to Câu 32: Calculate the cost variance if the
a. ensure that cash comes in faster than it goes cumulative earned value is $10 and the
out cumulative actual costs are $20.

b. add a sizable profit to the proposal after a. 2.0


estimating direct and indirect costs => sai b. 0.5
c. pad the price of the bid on project proposals c. -$10
to cover contingencies
d. $10
Câu 33: Calculate the forecasted cost at a. difference between what was planned and
completion if the total budgeted cost (BAC) = the actual costs
$10,000, the EV is $8,000, and the AC is $4,000.
b. the budgeted costs of the work actually
a. EAC = $5,000 performed
b. EAC = $4,000 c. the sum of the actual costs of the project
c. EAC = $6,000 d. the budgeted cost of the work scheduled
d. EAC = $20,000
ÔN TẬP
Câu 34: Determining the earned value involves
collecting data on the percent complete for Câu 1____ is the value of the work actually
each work package and then converting this performed, and is a key parameter that must be
percentage to a dollar amount by multiplying determined throughout the project.
the ____ of the work package by the percent a. Earned value
complete.
b. Interest
a. contract cumulating amount
c. Anticipated value
b. cumulative budgeted cost
d. Forecasted value
c. total cumulative fees
Câu 2 Which of these guidelines should be used
d. total budgeted cost
to handle project information needs?
Câu 35: The estimated cost at completion is a. replace communication methods as soon as
a. a ratio of performance to costs new methods emerge

b. an estimate of the costs of the work b. target communications to as many people as


remaining in the project possible

c. an estimated cost at the completion of the c. provide information soon enough so that it
project based on project performance is useful to the recipient
d. the planned value of the project d. use emails as the only form of
communications
Câu 36: The ____ is the amount that is
budgeted to accomplish the work that was Câu 3 Consider the project performance report
scheduled to be performed up to a certain point presented in figure 14.1. What valid conclusion
in time can you draw regarding the project schedule
a. total budgeted cost performance as of October 31, 20XX?

b. cumulative budgeted cost

c. contract cumulating amount

d. total cumulative fees

Câu 37: The earned value is


a. The project is $8,000 over budget Câu 7: Which of the following measures is best
suited for determining whether the project is
b. The project is $18,000 over budget on, ahead or behind schedule?
c. The project is $26,000 under budget. a. Schedule Compliance (SC)
d. The project is on budget. b. Estimate to Complete (ETC)
Câu 4: All of the following may be negotiated c. To Complete Performance Index (TCPI)
between a client company and a contractor
EXCEPT: d. Schedule Variance (SV)
a. personnel assignments Câu 8: Given this project and the requirement
that the number of resources working on a task
b. the amount of money to be paid.
cannot be less than the number assigned to the
c. quality standards task, answer the following question.

d. selection criteria for scoring models If the tasks were placed in a serial relationship
with Task 1 first and the others in numerical
Câu 5: Calculate the latest finish for Task B if its order, on what day would Task 3 be done?
predecessor, Task A, finishes on day 3, its
succeeding activity, Task E, has a latest start of A. Day 18
day 7, and the duration of Task B is 2 days. b. Day 3
a. day 3
c. Day 9
b. day 7
d. Day 10
c. Cannot be calculated based upon information
Câu 9 In an adaptive or change - driven project
given life cycle:
d. day 5 a. early results lead into planning later work.
Câu 6: Which of the following statements best b. planning precedes all executing.
describes the contemporary use of financial
models and scoring models for project c. the waterfall approach is commonly used.
selection?
d. the product or deliverable is well
a. Financial methods are preferred because understood.
they ensure alignment with the organization’s
strategic goals. Câu 10 The cumulative earned value of the
project is
b. Scoring models are unreliable because they
fail to consider financial factors. a. the sum of the planned costs of the project

c. One of these techniques is typically used to b. the sum of the differences between what was
the exclusion of the other, due to time planned and the actual costs
demands. c. the sum of the budgeted cost of the work
d. These methods are often used together to scheduled
ensure financial and non-financial factors are d. the sum of the budgeted costs of the work
both considereD. actually performed
Câu 11____ is found primarily in companies that Câu 16 Projects are considered successful for all
are involved in very large projects. of the reasons below EXCEPT:
a. An autonomous project organizational a. members of the team learn new skills
structure working on the project.

b. A functional organizational structure b. the organization captures lessons learned for


future projects.
c. A matrix organizational structure
c. the organization reaps business level benefits.
d. A project management office
d. the team has demonstrated heroics to meet
Câu 12Which of the following statements
project objectives
concerning work packages is NOT correct?
Câu 17The duration of a task is
a. Work packages are the basis for subsequent
project control activities. a. near-term activities

b. Work packages are the elements at the b. short duration activities


lowest level of the WBS.
c. long duration activities
c. Work packages are activity elements with
d. all the activities of the project
detailed descriptions of tasks and
dependencies Câu 18The ____ type organizational structure
lacks customer focus.
d. Work packages are the basis for subsequent
project planning activities. a. Functional

Câu 13Total Slack is sometimes called b. Progressive

a. drift c. Project

b. sink d. Matrix

c. ride Câu 19Consider the System Integration Project


depicted in Figure 7-3. Based on the
d. float
information provided, which activities can be
Câu 14 delayed one day without impacting the
expected project completion date?
Which of following would allow for level
resources on the project? a. Activity C - Purchase Software and Activity D
- Prepare Test Plan
Câu 15 The ____ for the entire project or each
work package provides a baseline against which b. none of these
actual cost and work performance can be
compared at any time during the project. c. Activity E - Install Software and Activity F -
Test System
a. cumulative budgeted cost
d. Activity C - Purchase Software and Activity E -
b. total budgeted cost Install Software
c. contract cumulating amount Câu 20Consider the Lab Experiment Project
d. total cumulative fees depicted in Figure 7-4. Based on the
information provided, identify the critical Câu 24Which of the ten knowledge areas
path(s) for this project? defined in the Project Management Body of
Knowledge includes the
a. A-B-E-F only
activities of purchasing or acquiring products,
b. A-C-F only services or results from outside the project
C. Both A-B-D-F and A-B-E-F are critical paths team?

d. A-B-D-F only a. Procurement management

Câu 21Consider the Lab Experiment Project b. Scope management


depicted in Figure 7-4. Based on the
c. Quality management
information provided, how many days can you
delay the calibration of the instrumentation d. Communications management
(Activity B), without impacting the expected
project completion date? Câu 25Throughout the performance of the
project, some activities will take longer than
a. 0 days their estimated duration, others will be done in
less time than their estimated duration, and
b. 2 days
a. others are to be done by two project teams
c. 1 days
c. many will not be completed
d. 4 days
d. a few may conform to the estimated
Câu 22Portfolio management helps an duration exactly
organization achieve its strategic goals in all of
the following ways EXCEPT: Câu 26All of the following statements
concerning project portfolios are true EXCEPT:
a. managing ongoing projects
a. Portfolios usually include a mix of high-risk
b. prioritizing work to be done
and low-risk projects.
c. providing needed resources
b. The projects in a portfolio are grouped to be
d. selecting the right projects managed collectively.

Câu 23The total completion time is 25 days. c. All projects in a portfolio contribute to the
Task A is planned to take seven days. Task B is organization’s goals.
planned to take five days. Task C is planned to
d. Portfolios cannot include operations and
take eight days. The tasks have a serial
relationship. Task A takes nine days to be programs.
completed instead of seven days. How much Câu 27In a ______________ the project
slack does the project have now that Task A is manager is the intermediary between the
finished? company and the customer.
a. Negative 5 days slack
a. autonomous project organizational
b. Positive 3 days slack structure

c. Positive 5 days slack b. functional organizational structure

d. Positive 16 days slack c. matrix organizational structure


d. hierarchical organizational structure Câu 31If the cumulative earned value is $10 and
the cumulative actual costs are $20, then the
Câu 28Which of the following responses most CPI is
accurately depicts the correct sequence of
activities in the strategic planning process? a. $10

A. strategic objectives - strategic analysis - b. 2.0


guiding principles - flow-down objectives c. -$10
b. guiding principles - strategic objectives - flow- d. 0.5
down objectives - strategic analysis
Câu 32Total slack is calculated for each of the
c. guiding principles - strategic analysis - activities by finding the difference between
strategic objectives - flow-down objectives
a. the ES of the activity and the LF of the activity
d. strategic analysis - guiding principles - or the difference between the ES and LF of the
strategic objectives - flow-down objectives activity
Câu 29Latest start time is calculated by b. the EF of the activity and the LF of the
a. subtracting the activity’s estimated duration activity or the difference between the ES and
from the activity's succeeding activity’s latest LS of the activity
finish time: LS = LF succeeding activity –
c. the ES of the activity and the LF of the
Estimated Duration
activity or the difference between the EF and LS
b. subtracting the activity’s estimated duration of the activity
from the activity’s latest finish time: LS = LF – D. the EF of the activity and the LS of the
Estimated Duration activity or the difference between the ES and LF
c. adding the activity’s estimated duration to of the activity
the predecessor of the activity’s latest start Câu 33The earliest start time for an activity is
time: LS = LS predecessor + Estimated Duration
a. is dependent upon the start time of its
d. adding the activity’s estimated duration to successor activities
the activity’s latest finish time: LS = LF +
Estimated Duration b. should not be delayed or would cause the
project to be delayed
Câu 30____ involves the following: Analyzing
cost performance to determine which work c. is calculated by adding the activity's
packages may require corrective action; estimated duration to its earliest start time
Deciding what specific corrective action should d. is the same as the earliest start time of the
be taken; and Revising the project plan, activity's predecessor
including time and cost estimates, to
incorporate the planned corrective action. Câu 34The _________ can establish consistent
procedures and develop best practices and
a. Resource analysis templates for planning, monitoring, and
b. Problem solving controlling projects; data gathering;
documentation; and project reporting.
c. CPI monitoring
a. matrix organizational structure office
d. Cost control
b. autonomous project organizational structure b. cost
office
c. scope
c. functional organizational structure office
d. programs
d. project management office
Câu 39 The ____ organizational is well
Câu 35 In ____, each member of a project team positioned to be highly responsive to the
has a dual reporting relationship; in a sense, project objective and customer needs because
each member has two managers, a (temporary) each project team is strictly dedicated to only
project manager and a (permanent) functional one project.
manager.
a. matrix
a. a functional organizational structure
b. functional
b. an autonomous project organizational
structure c. progressive

c. a project management office d. project

d. a matrix organizational structure Câu 40 If the project scope needs to change, it


is critical to have a sound ………………process in
Câu 36 Determining the earned value involves place that records the change and keeps a log
collecting data on the percent complete for of all project changes.
each work package and then converting this
percentage to a dollar amount by multiplying a. Baseline Control
the ____ of the work package by the percent b. Change control
complete.
c. Quality Control
a. cumulative budgeted cost (CBC)

b. cumulative actual cost (CAC) d. Process Control


Câu 41 In which sitiuation that the original
c. budgeted cost at completiong (BAC)
parameter of the project is optimized?
d. cumulative earned value (CEV)
a. accept
Câu 37All of the following factors have
b. constrain
influenced the increased reliance upon project
management in recent years EXCEPT: c. trade-off
a. rapid growth and changes in the information d. enhance
technology and telecommunications industries
Câu 42 The latest finish time of a specific
b. the decreased demands of ongoing activity is
operational work for small projects
a. the latest time the activity can be started for
d. increased international competition and its the project to be completed on time
influence on consumer demands b. always equal to the activity's earliest finish
Câu 38 Projects often require tradeoffs among time
all of the following EXCEPT:
c. dependent upon the predecessor's latest
a. schedule finish time
d. same as the latest finish time of the activity's
successor activities
Câu 43 The key to managing a cash flow is to
a. optimistically plan the budget to win more
contracts
b. pad the price of the bid on project proposals
to cover contingencies
c. add a sizable profit to the proposal after
estimating direct and indirect costs

d. ensure that cash comes in faster than it goes


out
Câu 44 Project stakeholders can be prioritized
based on a number of factors, including one of
the following
a. The project is $26,000 ahead of schedule
a. fame
b. The project is $18,000 behind schedule.
b. tenure
c. The project is 18 days behind schedule.
c. personality
d. The project is $26,000 behind schedule.
d. impact
Câu 47 Consider the project performance report
Câu 45 The key to managing ____ is to ensure presented in figure 14.1. Your analyst has
that cash comes in faster than it goes out. determined that your estimate to complete
(ETC) is $226,000. Based on your performance
a. budget & schedule charts to date and assuming future performance will
b. cash variances proceed at the same level of efficiency as past
performance, what is your estimate at
c. cash flow completion (EAC)?
d. scope extensions

Câu 46 Consider the project performance report


presented in figure 14.1. What valid conclusion
can you draw regarding the project schedule
performance as of October 31, 20XX?

a. $542,000

b. $550,000
C. It can not be determined from the
information provided.
D. $568,000
Câu 48 The ________________ allows efficient
utilization of resources by having individuals
from various functions assigned to work on
specific projects.
a. autonomous project organizational structure

b. hierarchical organizational structure


c. matrix organizational structure

d. functional organizational structure

Câu 49 People sometimes perform to


expectations, their effort will expand to fill the
whole number of scheduled days allotted,
a. even if the activity could have been
performed in a shorter time

b. even if the number of resources assigned to


the task is reduced

c. even if the activity could have been


performed in a longer time

d. even if part of the time for the task is waiting


time

Câu 50 Each project team is dedicated to only


one project in a _______________.
a. hierarchical organizational structure

b. functional organizational structure


c. matrix organizational structure
d. autonomous project organizational
structure