You are on page 1of 1

The George Washington University

HOT WORK PERMIT


HOT WORK BEING PERFORMED BY: REQUIRED PRECAUTIONS CHECKLIST

EMPLOYEE Fire sprinklers, hose streams and extinguishers in


service.
CONTRACTOR
DATE ISSUED: Cutting and welding equipment in good repair (same for
brazing, etc.)

LOCATION / BUILDING & FLOOR: Requirements within 35 ft. (11m) of work


Flammable liquids, dust, lint, and oily deposits
removed.
NATURE OF JOB:
Floors swept clean.
NAME OF PERSON(S) PERFORMING HOT WORK:
Combustible floors wet down or covered with damp
drop cloths, or metal shields.
Remove other combustibles where possible. Otherwise
The above location has been examined. The precautions protect with fire-resistive tarpaulins or metal shields.
checked on the Required Precaution Checklist have been
taken to prevent fire. Permission is granted for this work.
All wall and floor openings covered.
SIGNED: (Lifesafety Supervisor) Fire-resistive tarpaulins suspended beneath work.

Work on walls or ceilings


TIME STARTED: TIME FINISHED:
AM AM Construction is noncombustible and without
PM PM combustible covering or insulation.
DATE: TIME:
PERMIT AM Combustibles on other side of walls moved away.
EXPIRES: PM
FIRE WATCH SIGNOFF Work on enclosed equipment
Work area and all adjacent areas to which sparks and heat might Enclosed equipment cleaned of all combustibles.
have spread were inspected for at least 60 minutes after work
was completed and found safe. Containers purged of flammable liquids.

Signed: Fire Watch/Hot Work area monitoring


Fire watch will be provided during and for 60 minutes
after completion of work.
After completion of work, return permit to the Office of Risk
Fire watch is supplied with extinguishers and/or hose.
Management at 2025 F Street, Suite 101
(Support Building). Fire watch is trained in use of this equipment and in
sounding the fire alarm.

Any questions? Contact the Office of Risk Management at 994-3265

Revised: 12/2002