NOTES ON REINFORCED CONCRETE COLUMN: SHALL COMMENCE.

F. ALL DOUBLE ANGLE STRUCTURAL MEMEBERS MUST BE


A BEAM-COLUMN JOINTS SHALL BE PROVIDED BY A HOOP AT PROMDED WITH FILLER PLATES AT 0.3OMOC MAXIMUM SPACING.
0.1M0C. THE NUMBER OF SETS G. ALL EXPOSED STRUCTURAL STEEL MEMBERS SHALL HAVE
FOR SUCH HOOPS SHALL BE THE SAME IN THE CONFNED REGION AT LEAST TWO COATS OF RED LEAD OR ZINC CHROMATE PRIMER A B C D
AS SCHEDULED. PAINT.
B. WHERE COLUMN CHANGES IN SIZE, VERTICAL H. ALL TRUSSES, BEANS, AND GIRDERS, MUST BE PROVMDED
REINFORCEMENT SHALL BE OFFSET AT A SLOPE WITH A GAMBER AT THE RATE OF 3MM FOR EVERY 3.OM OF
OF NOT MORE THAN 1:6 AND EXTRA 10MNØ HOOPS AT 0.10M0C CLEAR SPAN IN 16804
SHALL BE PROVIDED PARABOLIC LAYOUT.
THROUGHOUT THE OFFSET REGION. NOTES ON FOUNDATIONS: 2468 881 6374 3792 3243
C. SPUCE SHALL BE ALLOWED ONLY WITHIN THE CENTER A. ALL FOOTINGS WERE DESIGNED BASED ON THE
HALF OF THE CLEAR COLUMN HEIGHT. ALLOWABLE SOIL BEARING CAPACITY OF 150 KPA. THE
SPLICE LENGTH SHALL BE PROMIDED WITH A HOOP SPACED CONTRACTOR SHALL REPORT INW
0.10M0C. SPUCE LENGTH SHALL TO THE DESIGNER THE ACTUAL SOIL CONDITION AT THE LEVEL
BE CONSIDERED AS TENSION SPLICE AS PRESENTED IN TABLE 2. OF THE FOOTING AND CONFIRM THE ACTUAL SOIL BEARING
D. COLUMN TIES AND SPIRAL SHALL BE PROVIDED WITH CAPACITY BE
MINIMUM CLEAR CONCRETE COVER OF DEPOSITING CONCRETE.
C1F1 C2F4 C2F4 C2F4 C1F1
4OMM. VERICAL BARS SHALL HAVE A CLEAR DISTANCE OF 1.5 B. NO FOOTING SHALL REST ON UNCOMPACTED FILL NOR 1
TIMES BAR DIAMETER OR 40MM LOOSE SOIL ALL FOOTINGS SHOULD REST AT LEAST 1.0 BELOW
WHICHEVER IS LARGER. THE GROUND. T

3316
E. CONFINED REGION SHALL BE EQUAL TO THE LARGER OF MINIMUM CONCRETE PROTECTION FOR REINFORCEMENTS

3911
THE FOLLOWING: SHALL BE 75MM CLEAR.
1.0 450MM C. ALL COLUMN REINFORCEMENTS SHALL REST ABOVE THE C1F3
2.0 BIGCER COLUMN DIMENSION BOTTOM REINFORCEMENTS OF THE FOOTING WITH 90-DEGREE
C2F3
C2F5

7992
3.0 (CLEAR COLUMN HEIGHT)/16 BEND PLUS 12 T 2
DIAMETER EXTENSION AT THE FREE END BUT NOT LESS THAN

3059
NOTES ON STRUCTURAL STEEL 300MM. HOOPS IN THE COLUMN SHALL CONTINUE BELOW THE
A ALL MATERALS AND WORKMANSHIP SHALL CONFORM TO THE TOP OF T

12720
LATEST EDITION OF AMERICAN INSTITUTE OF STEEL AT 0.10MOC.
CONSTRUCTION MANUAL NOTES ON CHB WALLS:

1672
UNLESS OTHERWISE SHOWN OR NOTED. A ALL CHB WALLS SHALL HAVE A MINIMUM COMPRESSVE C1F2 C1F1
B. ALL STRUCTURAL STEEL INCLUCING THAT OF GUSSET STRENGTH OF 450 PSI AND SHALL BE RENFORCED AS 3

8766
PLATES SHALL BE ASTM A36 STEEL WITH YIELD STRENGTH OF Fy PRESENTED IN TABLE 3. C2F3
= 248 MPA. B. MIIMUN LAP LENGTH OF SPLICE SHALL BE 250MM.
C. AL BOLTS AND THREADED FASTENERS SHALL BE ASTM C. PROMIDE RIGTH ANGLED REINFORCEMENT AT CORNERS,

4591

4650
A325. 900MM LONG.
D. ALL WELDS SHALL BE E70XX ELECTRODE AND SHALL D. PROMIDE BEAMS BLOCKS AT EVERY 10TH LAYER OF CHB
DEVEOP AT LEAST 100%% OF THE STRENGTH OF THE AND A POST AT EVERY 3.0M. SEE FIGURE 9 AND FIGURE 10. C1F1 C2F4 C2F4 C1F1
CONNECTED MEMBERS. E. WHERE CHB WALLS ADJOIN COLUMNS, RC BEAMS, AND RC
E. THE CONTRACTOR SHALL SUBMIT TO THE STRUCTURAL WALLS, DOWELS WITH THE SAME SIZE AS THE VERTICAL OR
4
ENGINEER THE SHOP/FABRICATION DRAWINGS FOR APPROVAL HORIZONTAL
BEFORE ANY WORK REINFORCEMENTS SHALL BE PROVDED,

COLUMN SCHEDULE SECTION NO. OF BARS TIES


ROAD ACCESS

863 1088 1053 3149 1057 1560 996

2500 9745
2 SETS=10 MM
FOOTING SCHEDULE
0.10MM O.C. @ SUPPORTS

C1 0.25 X 0.40 8D16 0.20MM O.C. @MIDSPAN


DESIGNATION BAR DIAMETER
4000

THICKNESS LENGTH WIDTH L W

F1 16 0.30M 1.65M 1.65M 10 PCS. 10 PCS.

8-16MM
VERTICAL BARS

SECOND FLOOR FOUNDATION PLAN


F2 16 0.30M 1.45M 1.45M 9 PCS. 9 PCS.

2000
F3 0.30M 8 PCS. 8 PCS.
1.25M 1.25M
16 SCALE 1:100 M
3000

1 SET-10MM
0.10MM O.C. @ SUPPORTS
C2 0.20 X 0.30 4D16 0.20MM O.C. @MIDSPAN 16 0.30M 1.00M 1.00M
F4 6 PCS. 6 PCS.

4-16MM
VERTICAL BARS F5 16 0.80M 0.80M 5 PCS. 5 PCS.
0.25M

STUDENT INSTRUCTOR PLATE NO. AND TITLE SHEET CONTENT REMARKS SHEET NO.

DANIELLE BILASA PL01 TWO STOREY RESIDENTIAL


COURSE AND YEAR AR. CHRIS JEFFERSON BUAZON DATE SUBMITTED SECOND FLOOR FOUNDATION PLAN

3RD YEAR BS ARCHITECTURE 09-22-2023

You might also like