SPECIFICATIONS
SUBMITTED BY:
DANIELLE BILASA
SUBMITTED TO:
AR. RYAN BENAOE
DIVISION 1. GENERAL REQUIREMENTS
RELATED SECTIONS
All applicable provisions of the different divisions of the Specifications for each work trade shall
Apply for all items cited in this Summary.
INFERRED ITEMS AND WORK
The installation of materials specified in this Summary must adhere to effective and sound engin
eering and construction practices, particularly in accordance with the manufacturer's application f
or installation requirements, which serve as guidelines for all works mentioned in these requirem
ents
SPECIFICS
The installation of materials specified in this Summary must adhere to effective and sound engin
eering and construction practices, particularly in accordance with the manufacturer's application f
or installation requirements, which serve as guidelines for all works mentioned in these requirem
ents.
ON-SITE ITEMS
Installation of engineering and drainage fills for buildings and landscaped areas. Materials and fi
nishes for the on-site improvements and facilities specified below are included in the scope of w
ork and must be provided and installed by the Contractor at no additional expense to the Owner.
Concrete paths, driveways, ramps, steps, pillars, and various slabs are constructed;
Splash slabs made of concrete, steel, or hard plastic; below-grade constructions such manholes, c
isterns, handholes, and septic vaults
OFF-SITE ITEMS
Off-site improvements shall generally be under the responsibility of the Owner and not included
in The Contract, with the exception of the following which shall be part of the Contractor’s
Work:Concreting of entry slabs. This work shall neatly make connections to the existing roads or
Curbs, if any, and shall incorporate necessary utility ways under such as required. Access
Road drainage system and other existing utility lines must be kept in working condition.
Installation of concrete drainage pipes to neatly receive connections from the storm drainage
System of the site to access road and/or to existing drainage system. Permanent connections to
the local utility lines for electrical, water, drainage, sewer and Telephone lines including
equipment, facilities, materials, fees, and/or work which utility
CONCRETE WORKS
All concretes shall be carefully mix all concrete until a uniform Aggregates and cement are
distributed, and they should be deposited as Almost as practical in its ultimate configuration,
being used to prevent Division of the mixtures. The water that will be mixed must be pure and
devoid of Dangerous levels of salt, oil, acids, alkalis, and other organic Components
It is necessary to carefully mix all concrete until a uniform Aggregates and cement are
distributed, and they should be deposited as Almost as practical in its ultimate configuration,
being used to prevent Division of the mixtures.
The water that will be mixed must be pure and devoid of Harmful amount of oil, acids, alkalis,
salt and other organic compounds.
Proportioning of Concrete
Proportion of Concrete Every concrete job shall be completed in compliance with the standard.
Guidelines for both reinforced and ordinary concrete, as approved by the Architect or Engineer
in charge. The type of Cement to be utilized is HOLCIM Portland cement.
Specifications for pozzolan and Portland cements, and authorized by the
The engineer or architect in charge of the building. The substitute cements chosen must adhere
to the specifications of pozzolan and Portland Cement or any other more widely accessible
products that are comparable within the vicinity.
CLASS A.: 1:2:4 – for columns, beams, and footings
CLASS B.: 1:2:5:5 – for walks, driveways, hollow blocks Mortar, filler and plastering.
CLASS C.: 1:3:6 – for floor and slabs on fill.
All concrete cement shall be cleared, graded and cleaned of sand and gravel. The cement used in
concrete shall meet all requirements and specification for Portland cement. Portland cement must
be either Republic, Northern, Atlas or an qequivalent.