Professional Documents
Culture Documents
FOUNDATION BEAM 7
FOUNDATION BEAM 8
FOUNDATION BEAM 6
200mm THK. RAFT 200mm THK. RAFT 200mm THK. RAFT 200mm THK. RAFT 200mm THK. RAFT
FOUNDATION BEAM 9
SLAB SLAB
FOUNDATION BEAM 10
SLAB SLAB
3225
SLAB
+0.450M (TOC) +0.450M (TOC) +0.450M (TOC) +0.450M (TOC) +0.450M (TOC)
2775
FOUNDATION BEAM 11
FOUNDATION BEAM 3 FC14 .
FC16 . FC6 . FC10 .
FOUNDATION BEAM 4
525
FLOOR SLAB
150mm THK. FIRST
+3.150 (TOC)
150mm THK. FIRST 150mm THK. FIRST
3225
FLOOR SLAB FLOOR SLAB 150mm THK. FIRST 150mm THK. FIRST FLOOR SLAB FLOOR SLAB
FIRST FLOOR BEAM 6
+3.150 (TOC) +3.150 (TOC) FLOOR SLAB FLOOR SLAB +3.150 (TOC) +3.150 (TOC)
+3.150 (TOC) +3.150 (TOC)
FIRST FLOOR BEAM 4 1C14 . 1C10 .
1C16 . 1C6 .
1C18 . FIRST FLOOR BEAM 3 1C5 .
1C3 .
150mm THK. FIRST
1950
150mm THK. FIRST 150mm THK. FIRST 150mm THK. FIRST STAIRS
FLOOR SLAB
FLOOR SLAB FLOOR SLAB FLOOR SLAB
1425
+3.150 (TOC)
+3.150 (TOC) +3.150 (TOC) +3.150 (TOC)
1C8 . 1C9 . 1C17 . FIRST FLOOR BEAM 2 1C15 . 1C13 .
1C4 .
712
450 600
2C30 .
ROOF BEAM 1 ROOF BEAM 4
2C2 .
2C19 (D=225)
2C20 (D=225)
ROOF BEAM 10
ROOF BEAM 7
ROOF BEAM 8
ROOF BEAM 9
ROOF BEAM 5
2750
2300
ROOF BEAM 11
ROOF BEAM 2 2C14 . 2C10 .
2425
2425
2C29 . 2C31 .
2C4 .
561
600
(4)
(4)
(4)
(4)
18 Y12-200 13 B2
(19)
(22)
(9) (9)
(22)
16 Y12-200 14 B2
(17)
(4) (4) (4) (4)
(21)
3225
(4)
(15) (16) 31 Y12-175 17 T2
(4)
(4)
38 Y12-175 18 B1
(22)
(38)
(4)
(4)
(4)
31 Y12-175 19 B1
(3)
(15) (16)
(3)
(15)
STAIR STARTERS
(44) 44 Y12-150 20 T1
(3)
(3)
(21) (16)
1950
(13)
(12)
37 Y12-175 21 B1
1425
(9)
(9)
(9)
(4)
(3)
(3)
(3)
(3)
14 Y12-200 02 B2
31 Y12-175 03 B1
14 Y12-200 04 B2
31 Y12-175 05 B1
14 Y12-200 06 B2
31 Y12-175 08 B1
14 Y12-200 09 B2
32 Y12-175 10 B1
16 Y12-200 11 B2
34 Y12-150 01 T1
31 Y12-175 07 T2
30 Y12-175 12 T2
RAFT SLAB FOUNDATION DETAILS
2375 2825 3375 2625 6492
Y12-01
Y12-07
Y12-12
17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20
14 14 14 14 14 14 14 14 14 14 15 15 15 15 15 15 15 15 15 15 15 13 13 13 13 13 13 13 13 13
705 705 810 810 950 950 765 765 1425
Y12-03
Y12-05
Y12-08
Y12-10
SECTION A
DISCLAIMER
GENERAL NOTES PROJECT TITLE: DRAWING TITLE: DRAWING NO:
* All dimensions in millimeters except otherwise stated * We do not accept responsibility
PROPOSED 4 BEDROOM DETACHED DUPLEX AT
SCALE: NTS
* All dimensions to be read and not scaled off drawings for any component, element or construction method
SANYINBO VILLAGE, IBEJU-LEKKI LGA, LAGOS STATE R.C DETAILS OF
* All dimensions to be field verified which may be inferred but not herein described
S201
* Errors,discrepancies or ommissions to be reported FOUNDATION SLAB
* Queries must be clarified before any work commences
* Contractor to confirm sizes of components
* We do not accept responsibility for any work
not supervised.
DATE: SEPTEMBER, 2021
and specifications prior to manufacture and installation
* All materials to conform to specifications and subject to
appropriate testing where applicable CLIENT: DESIGNED : DRAWN: CHECKED:
* Contractor liable for correct setting out of points, levels
and heights with particular reference to MRS JOY OGHOGHO OKORO ECC ECC ECC
boundaries, building lines and external / internal walls IF IN DOUBT, ASK ............. IMMEDIATELY
APPROVAL COLUMN
5200 3375 2625 5275 1216
(2) 2
3Y16(T1) 700 700 3Y16(T1) bbb
2Y16(T2) 2Y16(T2) a=Y16-2(B1)
ccc
b=Y16-1(T1)
c=Y16-1(T2)
d d d=Y12-3-200
900
Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 d d e=Y8-3-300
d d
3Y16(B1) 1550 1000 900 900 650 1300 1435 820 aaa
3Y16(B1) (2) 2
225 e
2/A-E (225x900) 2/E-F (225x900) 2Y16(B2) 2-2
2x3Y12-1-200 Side bars 2/F-G (225x900) 2/G-L (225x900) 2/L-M (225x900)
FOUNDATION BEAM 1
2375 2825 6000 2087 4404
3Y16(T1) 2Y16(T1) 700 700 3Y16(T1) (2) 2 bbb
2Y16(T2) ccc a=Y16-2(B1)
b=Y16-1(T1)
c=Y16-1(T2)
d d d=Y12-3-200
900
Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 d d e=Y8-3-300
d d
3Y16(B1) 2Y16(B2) aaa
1550 900 900 3Y16(B1) (2) 2
225 e
1000 2-2
8/B-D (225x900) 8/D-E (225x900) 8/E-G (225x900) 8/G-H (225x900) 8/H-M (225x900)
FOUNDATION BEAM 2
5275 1216 2375 2825
3Y16(T1) bbb
2Y16(T2) (2) 2
ccc a=Y16-2(B1)
(2) 2
b=Y16-1(T1) 3Y16(T1)
c=Y16-1(T2)
d d d=Y12-3-200
900
900
Y8-300 Y8-300 d d Y8-300 Y8-300 d d
e=Y8-3-300 e=Y8-3-300
d d d d
3Y16(B1) (2) 2
aaa aaa
6/E-F (225x900) 6/F-G (225x900) 225 B/8-5 (225x900) (2) 2 B/5-2(225x900)
e
3Y16(T1) 225 e
FOUNDATION BEAM 5 2-2 2-2
2x3Y12-1-200 Side bars 2x3Y12-1-200 Side bars FOUNDATION BEAM 6
1950 3225 1425 3750
3Y16(T1) (2) 2
3Y16(T1)
(2) 2 bbb
bbb a=Y16-2(B1)
a=Y16-2(B1)
b=Y16-1(T1)
b=Y16-1(T1) d d
d d d=Y12-3-200
900
d=Y12-3-200 Y8-300 Y8-300
900
Y8-300 Y8-300 d d e=Y8-3-300
d d e=Y8-3-300
d d
d d
aaa
D/8-5 (225x900) (2) 2 D/5-2 (225x900) aaa E/6-2 (225x900) 3Y16(B1) (2) 2
225 e
3Y16(T1) 225 e E/8-6 (225x900)
2-2 2-2
2x3Y12-1-200 Side bars FOUNDATION BEAM 7 2x3Y12-1-200 Side bars
FOUNDATION BEAM 8
1425 3750
1425 3750
3Y16(T1)
(2) 2 bbb 3Y16(T1)
a=Y16-2(B1) (2) 2 bbb
b=Y16-1(T1) a=Y16-2(B1)
d d b=Y16-1(T1)
d=Y12-3-200 d d
900
Y8-300 Y8-300 d d e=Y8-3-300 d=Y12-3-200
900
Y8-300 Y8-300 d d e=Y8-3-300
d d
d d
aaa
3Y16(B1) (2) 2
225 e aaa
F/8-6 (225x900) F/6-2 (225x900) 3Y16(B1)
2-2
G/8-6 (225x900) G/6-2 (225x900)
(2) 2
225 e
2x3Y12-1-200 Side bars 2-2
2x3Y12-1-200 Side bars
FOUNDATION BEAM 9
FOUNDATION BEAM 10
2425 2300 450
(N) 1 (N) 2 (N) 3
3Y16(T1)
bbb
a=Y16-2(B1)
b=Y16-1(T1)
d d
d=Y12-3-200
900
Y8-300 Y8-300 Y8-300
d d e=Y8-3-300
d d
3Y16(B1) M/8-4 (225x900) 2x1Y8-300 aaa
M/4-2(225x900) 225 e
2-2
2x3Y12-1-200 Side bars FOUNDATION BEAM 11
DISCLAIMER
GENERAL NOTES PROJECT TITLE: DRAWING TITLE: DRAWING NO:
* All dimensions in millimeters except otherwise stated * We do not accept responsibility
PROPOSED 4 BEDROOM DETACHED DUPLEX AT
SCALE: NTS
* All dimensions to be read and not scaled off drawings for any component, element or construction method
SANYINBO VILLAGE, IBEJU-LEKKI LGA, LAGOS STATE R.C DETAILS OF RAFT
* All dimensions to be field verified which may be inferred but not herein described
S202
* Errors,discrepancies or ommissions to be reported BEAMS
* Queries must be clarified before any work commences
* Contractor to confirm sizes of components
* We do not accept responsibility for any work
not supervised.
DATE: SEPTEMBER, 2021
and specifications prior to manufacture and installation
* All materials to conform to specifications and subject to
appropriate testing where applicable CLIENT: DESIGNED : DRAWN: CHECKED:
* Contractor liable for correct setting out of points, levels
and heights with particular reference to MRS JOY OGHOGHO OKORO ECC ECC ECC
boundaries, building lines and external / internal walls IF IN DOUBT, ASK ............. IMMEDIATELY
APPROVAL COLUMN
5200 3375 2625 5275
712.5 2375 2825 3375 2625 2087 3188 1216
1925 454
712.5
(8)
(4)
(4)
(4)
(36)
(6)
10
78 12 Y12-200 25 T2
(13) 13 Y12-150 26 B1
9 Y12-150 27 B1
(8)
(8)
(8)
(8)
(8)
(15)
(9)
(22)
7 Y12-200 28 B2&T2
(19)
(7)
2750
(17)
3225
(19)
(3) (4)
(19)
(16)
(19)
(4)
(12) 12 Y12-200 30 B2
(4) (5) (5) (4) (4)
(4)
39 Y12-150 31 B1
(4)
(17)
(35)
(22)
(22)
(22)
(15) 15 Y12-175 32 T1
(12) (11) 23 Y12-175 33 T1
(5)
(5)
(5)
(4)
(17) (20) (16) 53 Y12-175 34 T1
525
(8)
(9)
2425
(12)
(8)
(9)
(8)
(8)
(8)
(8)
1425
(9)
(11)
STAIRS
(8)
(5) 5 Y12-175 35 B2&T2
712.5
(4)
(4)
(4)
(35) (14)
8 Y12-200 08 B2&T2
4 Y12-200 17 B2&T2
8Y12-200 20 B2&T2
28 Y12-200 02 B2
27 Y12-200 11 B2
38 Y12-150 16 B1
15 Y12-200 22 B2
47 Y12-150 01 T1
31 Y12-175 04 T1
27 Y12-200 05 T2
21 Y12-200 06 T2
31 Y12-175 07 T1
21 Y12-200 09 T2
22 Y12-175 10 T1
21 Y12-200 12 T2
31 Y12-175 13 T1
24 Y12-200 15 T2
12 Y12-200 18 T2
24 Y12-175 19 T1
19 Y12-150 23 T1
8 Y12-200 40 B2
8 Y12-150 14 B1
9 Y12-200 38 T2
8 Y12-200 03 T2
8 Y12-200 37 T2
Y12-23
Y12-04
Y12-07
Y12-10
Y12-13
Y12-19
24 24 37 37 37 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 18 18 18 18 18 18 18 38 38 38 38 38 28 28 28
35 35 02 02 02 02 02 02 02 02 02 02 02 02 02 02 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 30 30 30 30 30 30 26 26 26 26 27 27 27 28 28 28
Y12-02
Y12-11
Y12-16
Y12-22
SECTION A
DISCLAIMER
GENERAL NOTES PROJECT TITLE: DRAWING TITLE: DRAWING NO:
* All dimensions in millimeters except otherwise stated * We do not accept responsibility
PROPOSED 4 BEDROOM DETACHED DUPLEX AT
SCALE: NTS
* All dimensions to be read and not scaled off drawings for any component, element or construction method
SANYINBO VILLAGE, IBEJU-LEKKI LGA, LAGOS STATE R.C DETAILS OF FIRST
* All dimensions to be field verified which may be inferred but not herein described
S203
* Errors,discrepancies or ommissions to be reported FLOOR SLAB DETAILS
* Queries must be clarified before any work commences
* Contractor to confirm sizes of components
* We do not accept responsibility for any work
not supervised.
DATE: SEPTEMBER, 2021
and specifications prior to manufacture and installation
* All materials to conform to specifications and subject to
appropriate testing where applicable CLIENT: DESIGNED : DRAWN: CHECKED:
* Contractor liable for correct setting out of points, levels
and heights with particular reference to MRS JOY OGHOGHO OKORO ECC ECC ECC
boundaries, building lines and external / internal walls IF IN DOUBT, ASK ............. IMMEDIATELY
APPROVAL COLUMN
713 5200 3375 2625 5275
(2) 3
1050 850 1500
850 700 850
1450 850
2Y16(T1) 2Y16(T1) 800 3Y20(T1) 2Y16(T1) 2Y16(T1) 700 3Y20(T1) 2Y16(T1)
150
150
b-b-b a=Y20(B1)
b=Y20(T1)
Y10-75 c=Y10-300
450
Y10-300 Y10-300 Y10-300 Y10-300
3Y16(B1)
450 3Y20(B1) 800 3Y20(B1) 2/E-F (225x450) 800 a-a-a c
2/A-B (225x150) 2/B-E (225x450) 2/F-G (225x450) 3Y20(B1) 2/G-L (225x450)
950 950 225
(2) 3
(2) 3 - 3
FIRST FLOOR BEAM 1
713 2375 2825 6000 2088 4404
1150 (8) 3
750
850 1700 600
850 1650
2Y16(T1) 3Y16(T1) 2Y16(T1) 700 3Y16(T1) 800 2Y16(T1) 800 3Y16(T1) 2Y16(T1)
150
150
b-b a=Y16(B1)
b=Y16(T1)
Y10-75 c=Y10-300
450
Y10-300 Y10-300 Y10-300 Y10-300 Y10-300
3Y16(B1)
450 2Y16(B1) 800 a-a-a c
3Y16(B1) (8) 3 3Y16(B1)
8/A-B (225x150) 8/B-D (225x450) 8/D-E (225x450) 8/E-G (225x450)
950 225
8/G-H (225x450) 8/H-M (225x450)
(8) 3 - 3
FIRST FLOOR BEAM 2
5275 1216
2825 (6) 3 3375 2625
(4) 1
2Y16(T1) 3Y16(T1)
150
150
b-b
150
150
a=Y16(B1) b-b-b a=Y20(B1)
b=Y16(T1)
d=Y16(B2)
c=Y10-300
b=Y16(T1)
450
450
Y10-300 Y10-300 Y10-300 c=Y10-300
Y10-300 Y10-300
3Y16(B1) a-a c a-a-a c
225 3Y20(B1)
6/E-F (225x450) 6/F-G (225x450) 2Y16(B2) 4/L-M 225
6/D-E (225x450) (6) 3
4/G-L (225x450)
(6) 3 - 3
(225x450) (4) 1 - 1
FIRST FLOOR BEAM 3 (4) 1
1B33 (225x450)
FIRST FLOOR BEAM 4
713 1950 3225 713
(5) 2 2375 700 550 (F) 2 3750
2Y16(T1) 2Y16(T1) (B) 3 2Y16(T1) 2Y16(T1) 2Y16(T1)
150
150
150
150
150
150
b-b a=Y16(B1)
b-b a=Y16(B1)
b-b a=Y20(B1)
b=Y16(T1) b=Y16(T1) b=Y16(T1)
c=Y10-300 Y10-75 Y10-75 c=Y10-300 c=Y10-300
450
450
450
Y10-300 Y10-300
Y10-300 3Y16(B1) 3Y16(B1) Y10-300
a-a B/9-8 450 B/2-1 a-a-a a-a-a
2Y16(B1) c 3Y16(B1) c
2Y20(B1) c
5/B-D (225x450) 225 (225x150) (B) 3 (225x150) 225 225
(5) 2
450 B/8-5 (225x450) F/6-2 (225x450)
(5) 2 - 2 B/5-2 (225x450) (B) 3 - 3
(F) 2
(F) 2 - 2
FIRST FLOOR BEAM 5 FIRST FLOOR BEAM 7
FIRST FLOOR BEAM 6
1950 3225
1000 713 1425 3750 712
(D) 3
800 700 550
700 2Y16(T1)
(E) 3
2Y16(T1) 2Y16(T1)
3Y16(T1) 550 3Y16(T1) 3Y16(T1)
150
150
150
b-b
150
150
(E) 1
b-b a=Y16(B1)
b=Y16(T1)
a=Y20(B1) b-b a=Y16(B1)
b=Y16(T1)
c=Y16(T1) Y10-75 Y10-75 c=Y10-300 b=Y16(T1)
d=Y10-300 d=Y10-75
450
a-a
450 Y10-300 Y10-300
Y10-300 Y10-300 3Y16(B1) 3Y16(B1) d
225
3Y16(B1) a-a d
(E) 1 2Y20(B1) 450 a-a-a c (E) 1 - 1
225 E/9-8 E/2-1 225
D/8-5 (225x450) D/5-2 (225x450) 450 (E) 3
(225x150)
(D) 3 (225x150) E/6-2 (225x450) (E) 3 - 3
(D) 3 - 3
E/8-6 (225x450)
FIRST FLOOR BEAM 8 FIRST FLOOR BEAM 9
713 1425 3750 712 713 2425 2750
1100 (G) 4
1150 (G) 3 700 (H) 3
2Y16(T1) 3Y16(T1) 800 2Y16(T1) 2Y16(T1) 2Y16(T1)
150
150
150
b-b
150
150
b-b-b a=Y20(B1) b-b a=Y16(B1)
a=Y16(B1) b=Y16(T1)
b=Y16(T2) Y10-75
Y10-75 Y10-75 b=Y16(T1) c=Y10-300
e=Y10-300 d=Y10-75
450
450
3Y16(B1) Y10-300 Y10-300
3Y16(B1) a-a-a d 3Y16(B1) Y10-300 Y10-300
225
(G) 4
2Y20(B1) 450 a-a-a e (G) 4 - 4 H/9-8 450 3Y16(B1) a-a-a c
G/9-8 G/2-1 225 (225x150) 225
(225x150)
450 (G) 3
(225x150) H/8-4 (225x450) (H) 3 H/4-2 (225x450)
(H) 3 - 3
G/8-6 (225x450) G/6-2 (225x450) (G) 3 - 3
FIRST FLOOR BEAM 10 FIRST FLOOR BEAM 11
2750 712 2425
(8) 4
(M) 2
(8) 2 550
2Y16(T1) 2Y16(T1) 2Y16(T1)
150
150
150
b-b c-c b-b
a=Y16(B1) b-b a=Y16(B1)
a=Y16(B1)
b=Y16(T1) b=Y16(T1)
c=Y16(T1) b=Y16(T1)
Y10-75 c=Y10-300 c=Y10-300
450
d=Y10-75
450
Y10-300
3Y16(B1) a-a-a d Y10-300
225
450 (8) 4 a-a-a c 3Y16(B1) a-a c
3Y16(B1) (8) 4 - 4
225
L/2-1 225
(8) 2 (M) 2
(225x150) (8) 2 - 2
M/8-4 (225x450)
(M) 2 - 2
L/4-2 (225x450)
L/4-2 (225x450)
FIRST FLOOR BEAM 12 FIRST FLOOR BEAM 13
DISCLAIMER
GENERAL NOTES PROJECT TITLE: DRAWING TITLE: DRAWING NO:
* All dimensions in millimeters except otherwise stated * We do not accept responsibility
PROPOSED 4 BEDROOM DETACHED DUPLEX AT
SCALE: NTS
* All dimensions to be read and not scaled off drawings for any component, element or construction method
SANYINBO VILLAGE, IBEJU-LEKKI LGA, LAGOS STATE R.C DETAILS OF FIRST
* All dimensions to be field verified which may be inferred but not herein described
S204
* Errors,discrepancies or ommissions to be reported FLOOR BEAMS
* Queries must be clarified before any work commences
* Contractor to confirm sizes of components
* We do not accept responsibility for any work
not supervised.
DATE: SEPTEMBER, 2021
and specifications prior to manufacture and installation
* All materials to conform to specifications and subject to
appropriate testing where applicable CLIENT: DESIGNED : DRAWN: CHECKED:
* Contractor liable for correct setting out of points, levels
and heights with particular reference to MRS JOY OGHOGHO OKORO ECC ECC ECC
boundaries, building lines and external / internal walls IF IN DOUBT, ASK ............. IMMEDIATELY
APPROVAL COLUMN
600 5200 6000 5275
1650
2Y16(T1) 800 2Y16(T1)
(10) 1
b-b a=Y16(B1)
b=Y16(T1)
300
Y10-225 Y10-225 Y10-225 Y10-225 c=Y10-225
3Y16(B1) 800 3Y16(B1) a-a c
10/N-B (10) 1
950 225
(225x300) 10/E-G (225x300) 10/G-L (225x300) (10) 1 - 1
10/B-E (225x300)
ROOF BEAM 1
5800 6000 5275 1216
1650
(4) 3 2Y16(T1) 800 2Y16(T1)
b-b
a=Y16(B1)
300
b=Y16(T1)
Y10-225 Y10-225 Y10-225 Y10-225 c=Y10-225
3Y16(B1) 800 a-a c
3Y16(B1)
(4) 3 950 225
(4) 3 - 3
4/E-G (225x300) 4/G-L (225x300) 4/L-M (225x300)
4/N-E (225x300)
ROOF BEAM 2
713 5200 6000 2088
700 (11) 3 1216
1650
2Y16(T1) 2Y16(T1) 800 2Y16(T1) 2Y16(T1) (2) 2
b-b
b-b
a=Y16(B1) a=Y16(B1)
300
b=Y16(T1) b=Y16(T1)
300
Y10-200 Y10-225 Y10-225 Y10-225 c=Y10-225 Y10-225 c=Y10-225
800 a-a a-a c
2Y16(B1) 2Y16(B1) c 2Y16(B1)
950 225 11/L-M (225x300)
225
11/N-B (11) 3 - 3
(2) 2 - 2
(11) 3 11/E-G (225x300) (2) 2
(225x300) 11/B-E (225x300)
11/G-H (225x300)
ROOF BEAM 3 ROOF BEAM 4
600 5175 712
150
(8) 2 4404 (L) 2 2750 600
(N) 1
2Y16(T1) 2Y16(T1)
2Y16(T1) 2Y16(T1)
b-b
b-b a=Y16(B1) b-b
a=Y16(B1) b=Y16(T1) a=Y16(B1)
300
b=Y16(T1)
300
Y10-225 c=Y10-225 b=Y16(T1)
300
Y10-225 c=Y10-225 Y10-225 Y10-225 c=Y10-225
Y10-225 Y10-200
a-a c a-a
a-a c 2Y16(B1) 2Y16(B1) c
2Y16(B1) 225
(N) 1
A/2-1 225 (8) 2 - 2 L/4-2-10 (225x300)
225
A/11-8 (N) 1 - 1 (8) 2 8/H-M (225x300) (L) 2
11/8-2 (225x300) (225x300) (L) 2 - 2
(225x300)
ROOF BEAM 5 ROOF BEAM 6 ROOF BEAM 7
(E) 2 6375 (G) 2 6375 (G) 3
2Y16(T1) 2Y16(T1)
b-b b-b a=Y16(B1)
a=Y16(B1)
b=Y16(T1) b=Y16(T1)
300
300
Y10-175 c=Y10-225 Y10-200 c=Y10-200
3Y16(B1) a-a c 240 3Y16(B1) a-a-a c
225 225
(E) 2
E/11-10 (225x300) (E) 2 - 2 (G) 2
G/11-10 (225x300) (G) 3
(G) 2 - 2
ROOF BEAM 8 ROOF BEAM 9
600 2425 3350 (M) 2 2425 2300 450
2Y16(T1) (H) 1 2Y16(T1)
b-b b-b
a=Y16(B1) a=Y16(B1)
300
Y10-225 b=Y16(T1) Y10-225
300
Y10-225 Y10-225 Y10-225 Y10-225 b=Y16(T1)
c=Y10-225 c=Y10-225
2Y16(B1) a-a c
2Y16(B1) a-a c
(H) 1
H/4-10 (225x300) 225 H/8-4 (225x300) H/4-3 (225x300) 225
H/8-4 (225x300) (H) 1 - 1
(M) 2
(M) 2 - 2
H/11-8 H/3-2
(225x300) (225x300)
ROOF BEAM 10 ROOF BEAM 10
DISCLAIMER
GENERAL NOTES PROJECT TITLE: DRAWING TITLE: DRAWING NO:
* All dimensions in millimeters except otherwise stated * We do not accept responsibility
PROPOSED 4 BEDROOM DETACHED DUPLEX AT
SCALE: NTS
* All dimensions to be read and not scaled off drawings for any component, element or construction method
SANYINBO VILLAGE, IBEJU-LEKKI LGA, LAGOS STATE
* All dimensions to be field verified
* Errors,discrepancies or ommissions to be reported
which may be inferred but not herein described
R.C DETAILS OF ROOF S205
* Queries must be clarified before any work commences
* Contractor to confirm sizes of components
* We do not accept responsibility for any work
not supervised.
BEAMS DATE: SEPTEMBER, 2021
and specifications prior to manufacture and installation
* All materials to conform to specifications and subject to
appropriate testing where applicable CLIENT: DESIGNED : DRAWN: CHECKED:
* Contractor liable for correct setting out of points, levels
and heights with particular reference to MRS JOY OGHOGHO OKORO ECC ECC ECC
boundaries, building lines and external / internal walls IF IN DOUBT, ASK ............. IMMEDIATELY
APPROVAL COLUMN
T/CONCRETE (ROOF) EL.+6.150
300
300
300
4Y16 05 4Y16 05 05 05 4 Y16 05
05 05
225
01
225
01
225
05
05 05
05
02 02 05 05
225 225
225
02-02
900
900
820
T/CONCRETE (FIRST FLOOR)
EL.+3.150
75
75
300
450
450
450
8Y16 04 4Y16 04
04 04 04 04
01
19Y10 01-150 C/C LINKS
225
04 04
225
04 04 01
01 04 04 04
225
04
225 225
04 04
225
900
900
900
T/CONCRETE (GRD FLR.)
EL.+0.450
75
75
75
900
2425
Y12-02
Y12-01
Y12-01
Y12-04
945
612.5 500
07 8 Y12 01-150 c/c T1
8 Y12 02-150 c/c B1
1000
Y12-02
04
(4) 06
09 9 Y12 05-200 c/c T2
03 08 8 Y12 06-150 c/c T1
02 14 6 Y12 07-200 c/c B2&T2
8 Y12 08-150 c/c T1
612.5 500
11 Equal threads @ 275mm
3025
(5)
12 8 Y12 09-150 c/c T1
01 05 10 8 Y12 10-150 c/c B1
Y12-10
Y12-08
3187.5
8 Y12 12-150 c/c T1
12 Y12 13-200 c/c B2
Y12-08
11
8 Y12 14-150 c/c T1
Y12-09
Y12-09
1890
Y12-11
Y12-10
150
STAIRCASE DETAILS
DISCLAIMER
GENERAL NOTES PROJECT TITLE: DRAWING TITLE: DRAWING NO:
* All dimensions in millimeters except otherwise stated * We do not accept responsibility
PROPOSED 4 BEDROOM DETACHED DUPLEX AT
SCALE: NTS
* All dimensions to be read and not scaled off drawings for any component, element or construction method
which may be inferred but not herein described SANYINBO VILLAGE, IBEJU-LEKKI LGA, LAGOS STATE R.C DETAILS OF STAIRCASE
* All dimensions to be field verified
* Errors,discrepancies or ommissions to be reported S207
* Queries must be clarified before any work commences
* Contractor to confirm sizes of components
* We do not accept responsibility for any work
not supervised.
DATE: SEPTEMBER, 2021
and specifications prior to manufacture and installation
* All materials to conform to specifications and subject to
appropriate testing where applicable CLIENT: DESIGNED : DRAWN: CHECKED:
* Contractor liable for correct setting out of points, levels
and heights with particular reference to MRS JOY OGHOGHO OKORO ECC ECC ECC
boundaries, building lines and external / internal walls IF IN DOUBT, ASK ............. IMMEDIATELY