PROJECT:

STRUCTURAL DRAWINGS FOR


PROPOSED 4 BEDROOM DETACHED DUPLEX
FOR MRS. JOY OGHOGHO OKORO
AT SANYINBO VILLAGE, IBEJU LEKKI L.G.A.
LAGOS STATE.
SEPTEMBER, 2021
STRUCTURAL BLOCKWORK
GENERAL NOTES CONCRETE STEELWORK
1. WORK TO FIGURED DIMENSIONS ONLY 1. (a) CONCRETE TO BE 30 N/MM2 1. ALL STRUCTURAL STEELWORK SHALL BE MILD 1. HOLLOW BLOCKWALLS BELOW GROUND
2. ALL DRAWINGS ARE TO BE READ IN IN FOUNDATIONS. STEEL TO BS 4360 GRADE 43A EXCEPT SLAB LEVEL ARE TO BE FILLED WITH
HOLLOW SECTIONS WHICH SHALL COMPLY MASS CONCRETE BACK FILLING IS TO
CONJUCTION WITH RELEVANT ARCHITECTS DRGS, OTHER (b) CONCRETE TO BE GRADE 25 N/MM2
STRUCTURAL DRGS AND SPECIALISTS DRGS. IN SUPERSTRUCTURE WITH GRADE 43C BE CARRIED OUT SIMULTANEUOSLY ON
WHERE HOLES, FIXING ETC. ARE REQUIRED, BOTH SIDES
BARS MAY BE DISPLACED SLIGHTLY TO 2. WELDING FABRICATION AND ERECTION OF
2. (a) R = DENOTES MILD STEEL
ACCOMMODATE THESE BUT THEY MUST NOT STRUCTURAL STEELWORK SHALL CONFORM
REINFORCEMENT ACCORDING TO 2. THE WALL THICKNESS OF THE BLOCKS
BE CUT OR REMOVED TO BS 5950
BS 4449 AND IN MILLIMETRE SIZE SHOULD NOT BE MORE THAN 225mm
3. THE ENGINEERS SHOULD BE NOTIFIED (b) T = DENOTES HIGH YIELD, HIGH BOND 3. UNLESS WHERE OTHERWISE NOTED ALL BOLTS
SHOULD THERE BE DESCREPANCIES WITHIN, ROUND REINFORCEMENT TO SHALL BE BLACK BOLTS TO BS 4190 AND
3. THE MINIMUM CRUSHING STRENGTH OF THE
BETWEEN OR AMONG THESE DRAWINGS BS 4449 AND 4466 WASHERS TO BS 4320 SHALL BE PROVIDED
AND OTHER DRAWINGS. HOLLOW BLOCKS IS TO BE 2.0N/mm2. OF
(c) T = TOP FOR ALL BOLTS
4. THE ENGINEERS SHALL NOT BE LIABLE T1 = TOP TOP GROSS AREA OF BLOCK AT 28 DAYS
4. ALL WELDS ARE TO BE 6mm. FILLET WELDS
FOR ANY STRUCTURAL DEFECT IF THE T2 = TOP BOTTOM
PROJECT IS NOT SUPERVISED BY THEM. CONTINUOUS UNLESS WHERE OTHERWISE
(d) B = BOTTOM INDICATED 4. BLOCKWORK TIES BETWEEN BLOCKWORK
5. REMOVE ALL TOPSOIL UNDER SLABS.
B2 = BOTTOM TOP WALLS AND COLUMNS/STANCHIONS ARE TO
PROVIDE 150mm WELL RAMMED AND
B1 = BOTTOM BOTTOM 5. UNLESS NOTED OTHERWISE THE COMPOSITION BE PROVIDED AT EVERY COURSE. TIES
CONSOLIDATED NATURALLY OCCURRING
HARDCORE MATERIAL OR ROCK LATERITE OF THE PROTECTIVE SYSTEM SHALL BE : TO BE 6mm BAR STRAPS 700mm LONG
UNDER ALL GROUND BEARING SLABS WELL (e) AS = ALTERNATIVELY STAGGERED INTO THE BLOCKWORK
CONSOLIDATED SELECTED FILL OR MASS (a) SURFACE TREATMENT -D
CONCRETE TO BE USED TO MAKE UP LEVELS (f) AP = ALTERNATIVELY PLACED 5. MAXIMUM POUR HEIGHT FOR ALL FILLED
WHERE NECESSARY AS AGREED WITH THE (b) METAL COATING - NONE
(g) NF = NEAR FACE BLOCK WORK TO BE 2 COURSES AT A TIME
ENGINEER. FOR FILL, LAYERS NOT TO (c) PRE - TREATMENT - NONE
EXCEED 225mm (h) FF = FAR FACE
(d) PRIMING PAINT - 1H
(i) EF = EACH FACE
6. WHERE BAD GROUND IS ENCOUNTERED
(e) FINISHING PAINT - 2T
BELOW FOUNDATION LEVEL. THE DIFFERENCE
3. ALL BLINDING AND MASS CONCRETE TO
IN LEVEL BETWEEN APPROVED BEARING AS CLASIFIED IN TABLE 4 KEY TO TREATMENT
STRATUM AND ORIGINAL LEVEL IS TO BE BE 1: 3 : 6 (CEMENT - SAND - COARSE
CP 2008 1966
MADE UP USING MASS CONCRETE AGGREGATE)
6. THE FIRST BAY OF ERECTED STEEL IS
7. THE ALLOWABLE GROUND PRESSURE FOR THE 4. IN WATER - TIGHT CONSTRUCTION JOINTS
TO BE LINED AND LEVELLED BY MEANS OF
FOUNDATION DESIGN IS 100KN/M2 AS INDICATED IN CONCRETE WORK ARE TO HAVE APPROVED TEMPORARY BRACING,
IN THE SOIL INVESTIGATION REPORT. WATER BAR AND CONTRACTOR IS TO TAKE BEFORE FURTHER ERECTION SHALL CONTINUE
SPECIAL CARE WITH THE CONCRETE SO AS
8. ALL DIMENSIONS ARE TO BE CHECKED ON
TO PRODUCE A WATER - TIGHT CONSTRUCTION. 7. ANTI - SAG RODS ARE TO BE PROVIDED
SITE
AN ADMIXTURE OF A PROPRIETARY BRAND AS SHOWN ON THE DRGS.WHERE ANTI - SAG
9. EXTERNAL WALL FOOTING TO BE 1 METRE RODS ARE NOT SHOWN ON THE DRGS.
MINIMUM DEPTH BELOW EXISTING GROUND MAY BE USED IF AGREED BY THE ENGINNER.
LEVEL OR FINAL GROUND LEVEL THEY ARE TO BE PLACED AT MID-SPAN OF
IF AN ADMIXTURE IS USED CARE SHOULD PURLINS OR TO PURLIN MANUFACTURERS
WHICHEVER IS LOWER BE TAKEN THAT IT IS PLACED STRICTLY IN SPECIFICATION
10. WHERE SELECTED FILL IS USED FOR MAKING ACCORDANCE WITH THE MANUFACTURERS
UP LEVELS TO FORM A PILING PLATFORM, INSTRUCTIONS 8. ALL STEEL SURFACES IN CONTACT WITH
THE MAXIMUM SIZE OF AGGREGATE ALUMINIUM SHEETING ARE ARE TO BE GIVEN
IS NOT TO EXCEED 75mm 5. ALL CONSTRUCTION JOINT POSITIONS ARE TO TWO COATS OF AN APPROVED BITUMASTIC
BE APPROVED BY THE ENGINEER PRIOR TO PAINT BEFORE FIXING SHEETING
11. ALL DIMENSIONS ARE IN METRES AND CASTING BUT THESE SHOULD NOT BE
MILLIMETRES UNLESS NOTED OTHERWISE 9. ALL BOLTS IN TENSION SHOULD BE PROVIDED
SPACED MORE THAN 10.0mm APART
WITH EITHER DOUBLE COILED SPRING
12. BASEMENT AND SIMILAR CONSTRUCTION SHALL WASHERS OR LOCK NUTS
6. MAXIMUM SIZE OF AGGREGATE TO BE 20mm
INCORPORATE BASEMENT TANKING COMPRISING
3 LAYER BITUMINUOUS FELT, 25mm THICK UNLESS OTHERWISE SPECIFIED
DAMP PROOF MEMBRANE PROTECTED BY
100mm THICK CONCRETE REINFORCED WITH
BRC 65
APPROVAL COLUMN
2375 2825 3375 2625 2088 3188 1216
FC11 . FC7 . FOUNDATION BEAM 1 FC12 . FC1 .
450

FOUNDATION BEAM 7

FOUNDATION BEAM 8
FOUNDATION BEAM 6

200mm THK. RAFT 200mm THK. RAFT 200mm THK. RAFT 200mm THK. RAFT 200mm THK. RAFT
FOUNDATION BEAM 9

SLAB SLAB

FOUNDATION BEAM 10
SLAB SLAB
3225

SLAB
+0.450M (TOC) +0.450M (TOC) +0.450M (TOC) +0.450M (TOC) +0.450M (TOC)
2775

FOUNDATION BEAM 11
FOUNDATION BEAM 3 FC14 .
FC16 . FC6 . FC10 .
FOUNDATION BEAM 4
525

FC18 . FC5 . FC3 . 200mm THK. RAFT


SLAB
+0.450M (TOC)
FOUNDATION BEAM 5
1950

200mm THK. RAFT 200mm THK. RAFT 200mm THK. RAFT


SLAB 200mm THK. RAFT
SLAB SLAB
1425

+0.450M (TOC) SLAB


+0.450M (TOC) +0.450M (TOC)
+0.450M (TOC)
FC8 . FC9 . FC17 . FC15 . FC13 . FC4 .
FOUNDATION BEAM 2
200 THK. SLAB
2750 2425 0.3 LDPE DAMP-PROOF MEMBRANE
T/CONCRETE 50 THK. BLINDING & LEAN MIX
T/CONCRETE EL.+0.450 CONCRETE (M10) (TYP)
EL.+0.450 150 THK. HARDCORE
COMPACTED AND INTERSTICES SHALL
BE FILLED WITH GRITS AND THOROUGH
COMPACTION SHALL BE DONE BY
SPRINKLING WATER. (TYP)
900

BASE SHALL BE VERY WELL COMPACTED


TO ACHIEVE 95% PROCTOR DENSITY.
(TYP)
500MM FILLING WITH (LOCALLY AVAILABLE GOOD
NON-EXPANSIVE SOIL AND SHALL BE
COMPACTED IN LAYERS OF NOT EXCEDDING
200 MM TO 95%OF STANDARD PROCTOR DENSITY
FOUNDATION LAYOUT
DISCLAIMER
GENERAL NOTES PROJECT TITLE: DRAWING TITLE: DRAWING NO:
* All dimensions in millimeters except otherwise stated * We do not accept responsibility
PROPOSED 4 BEDROOM DETACHED DUPLEX AT
SCALE: NTS
* All dimensions to be read and not scaled off drawings for any component, element or construction method
SANYINBO VILLAGE, IBEJU-LEKKI LGA, LAGOS STATE GENERAL ARRANGEMENT
* All dimensions to be field verified which may be inferred but not herein described
S101
* Errors,discrepancies or ommissions to be reported OF FOUNDATION
* Queries must be clarified before any work commences
* Contractor to confirm sizes of components
* We do not accept responsibility for any work
not supervised.
DATE: SEPTEMBER, 2021
and specifications prior to manufacture and installation
* All materials to conform to specifications and subject to
appropriate testing where applicable CLIENT: DESIGNED : DRAWN: CHECKED:
* Contractor liable for correct setting out of points, levels
and heights with particular reference to MRS JOY OGHOGHO OKORO ECC ECC ECC
boundaries, building lines and external / internal walls IF IN DOUBT, ASK ............. IMMEDIATELY
713 2375 2825 3375 2625 2087 3188 1216
1925 1262 454
713

150mm THK. FIRST


FLOOR SLAB
1C11 . 1C7 . +3.150 (TOC) FIRST FLOOR BEAM 1 1C1 .
1C2 . 1C19 (D=225)

FIRST FLOOR BEAM 12


1C12 . 10
78
1C20 (D=225)
150mm THK. FIRST
FLOOR SLAB
+3.150 (TOC)

FIRST FLOOR BEAM 8

FIRST FLOOR BEAM 9

FIRST FLOOR BEAM 7

150mm THK. FIRST


2750

FIRST FLOOR BEAM 11


FIRST FLOOR BEAM 10
150mm THK. FIRST

FLOOR SLAB
150mm THK. FIRST

+3.150 (TOC)
150mm THK. FIRST 150mm THK. FIRST
3225

FLOOR SLAB FLOOR SLAB 150mm THK. FIRST 150mm THK. FIRST FLOOR SLAB FLOOR SLAB
FIRST FLOOR BEAM 6

+3.150 (TOC) +3.150 (TOC) FLOOR SLAB FLOOR SLAB +3.150 (TOC) +3.150 (TOC)
+3.150 (TOC) +3.150 (TOC)
FIRST FLOOR BEAM 4 1C14 . 1C10 .

FIRST FLOOR BEAM 13


FIRST FLOOR BEAM 5
525 475

1C16 . 1C6 .
1C18 . FIRST FLOOR BEAM 3 1C5 .
1C3 .
150mm THK. FIRST
1950

150mm THK. FIRST 150mm THK. FIRST 150mm THK. FIRST STAIRS
FLOOR SLAB
FLOOR SLAB FLOOR SLAB FLOOR SLAB
1425

+3.150 (TOC)
+3.150 (TOC) +3.150 (TOC) +3.150 (TOC)
1C8 . 1C9 . 1C17 . FIRST FLOOR BEAM 2 1C15 . 1C13 .
1C4 .
712

150mm THK. FIRST


FLOOR SLAB
+3.150 (TOC)
DISCLAIMER
GENERAL NOTES PROJECT TITLE: DRAWING TITLE: DRAWING NO:
* All dimensions in millimeters except otherwise stated * We do not accept responsibility
PROPOSED 4 BEDROOM DETACHED DUPLEX AT
SCALE: NTS
* All dimensions to be read and not scaled off drawings for any component, element or construction method
SANYINBO VILLAGE, IBEJU-LEKKI LGA, LAGOS STATE GENERAL ARRANGEMENT OF
* All dimensions to be field verified which may be inferred but not herein described
S102
* Errors,discrepancies or ommissions to be reported FIRST FLOOR SLAB
* Queries must be clarified before any work commences
* Contractor to confirm sizes of components
* We do not accept responsibility for any work
not supervised.
DATE: SEPTEMBER, 2021
and specifications prior to manufacture and installation
* All materials to conform to specifications and subject to
appropriate testing where applicable CLIENT: DESIGNED : DRAWN: CHECKED:
* Contractor liable for correct setting out of points, levels
and heights with particular reference to MRS JOY OGHOGHO OKORO ECC ECC ECC
boundaries, building lines and external / internal walls IF IN DOUBT, ASK ............. IMMEDIATELY
APPROVAL COLUMN
600 5200 6000 5275 1216
2C21 . 2C22 . 2C23 . 2C24 .
600

450 600
2C30 .
ROOF BEAM 1 ROOF BEAM 4
2C2 .
2C19 (D=225)
2C20 (D=225)

ROOF BEAM 10

ROOF BEAM 7
ROOF BEAM 8

ROOF BEAM 9
ROOF BEAM 5
2750

2300
ROOF BEAM 11
ROOF BEAM 2 2C14 . 2C10 .
2425

2425
2C29 . 2C31 .
2C4 .

561
600

2C28 . 2C27 . 2C26 . ROOF BEAM 6


2C25 .
ROOF BEAM 3
600 5200 6000 2088 4404
DISCLAIMER
GENERAL NOTES PROJECT TITLE: DRAWING TITLE: DRAWING NO:
* All dimensions in millimeters except otherwise stated * We do not accept responsibility
PROPOSED 4 BEDROOM DETACHED DUPLEX AT
SCALE: NTS
* All dimensions to be read and not scaled off drawings for any component, element or construction method
SANYINBO VILLAGE, IBEJU-LEKKI LGA, LAGOS STATE GENERAL ARRANGEMENT OF
* All dimensions to be field verified which may be inferred but not herein described
S103
* Errors,discrepancies or ommissions to be reported ROOF LAYOUT
* Queries must be clarified before any work commences
* Contractor to confirm sizes of components
* We do not accept responsibility for any work
not supervised.
DATE: SEPTEMBER, 2021
and specifications prior to manufacture and installation
* All materials to conform to specifications and subject to
appropriate testing where applicable CLIENT: DESIGNED : DRAWN: CHECKED:
* Contractor liable for correct setting out of points, levels
and heights with particular reference to MRS JOY OGHOGHO OKORO ECC ECC ECC
boundaries, building lines and external / internal walls IF IN DOUBT, ASK ............. IMMEDIATELY
APPROVAL COLUMN
2375 2825 3375 2625 2087 3188 1216
5200 5275
(4)

(4)

(4)
(4)

(4)

18 Y12-200 13 B2
(19)

(22)

(9) (9)
(22)

16 Y12-200 14 B2

(17)
(4) (4) (4) (4)
(21)
3225

(5) (5) (4) (4) 18 Y12-200 15 B2


3750

(24) (18) 42 Y12-150 16 T1

(4)
(15) (16) 31 Y12-175 17 T2
(4)

(4)

38 Y12-175 18 B1
(22)

(38)

(4)
(4)

(4)
31 Y12-175 19 B1
(3)

(15) (16)
(3)

(15)

STAIR STARTERS
(44) 44 Y12-150 20 T1
(3)

(3)
(21) (16)
1950

(13)

(12)

37 Y12-175 21 B1
1425

(9)

(9)

(9)

(4)
(3)

(3)

(3)

(3)
14 Y12-200 02 B2

31 Y12-175 03 B1

14 Y12-200 04 B2

31 Y12-175 05 B1

14 Y12-200 06 B2

31 Y12-175 08 B1

14 Y12-200 09 B2

32 Y12-175 10 B1

16 Y12-200 11 B2
34 Y12-150 01 T1

31 Y12-175 07 T2

30 Y12-175 12 T2
RAFT SLAB FOUNDATION DETAILS
2375 2825 3375 2625 6492
Y12-01

Y12-07

Y12-12
17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20
14 14 14 14 14 14 14 14 14 14 15 15 15 15 15 15 15 15 15 15 15 13 13 13 13 13 13 13 13 13
705 705 810 810 950 950 765 765 1425

Y12-03

Y12-05

Y12-08

Y12-10
SECTION A
DISCLAIMER
GENERAL NOTES PROJECT TITLE: DRAWING TITLE: DRAWING NO:
* All dimensions in millimeters except otherwise stated * We do not accept responsibility
PROPOSED 4 BEDROOM DETACHED DUPLEX AT
SCALE: NTS
* All dimensions to be read and not scaled off drawings for any component, element or construction method
SANYINBO VILLAGE, IBEJU-LEKKI LGA, LAGOS STATE R.C DETAILS OF
* All dimensions to be field verified which may be inferred but not herein described
S201
* Errors,discrepancies or ommissions to be reported FOUNDATION SLAB
* Queries must be clarified before any work commences
* Contractor to confirm sizes of components
* We do not accept responsibility for any work
not supervised.
DATE: SEPTEMBER, 2021
and specifications prior to manufacture and installation
* All materials to conform to specifications and subject to
appropriate testing where applicable CLIENT: DESIGNED : DRAWN: CHECKED:
* Contractor liable for correct setting out of points, levels
and heights with particular reference to MRS JOY OGHOGHO OKORO ECC ECC ECC
boundaries, building lines and external / internal walls IF IN DOUBT, ASK ............. IMMEDIATELY
APPROVAL COLUMN
5200 3375 2625 5275 1216
(2) 2
3Y16(T1) 700 700 3Y16(T1) bbb
2Y16(T2) 2Y16(T2) a=Y16-2(B1)
ccc
b=Y16-1(T1)
c=Y16-1(T2)
d d d=Y12-3-200

900
Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 d d e=Y8-3-300
d d
3Y16(B1) 1550 1000 900 900 650 1300 1435 820 aaa
3Y16(B1) (2) 2
225 e
2/A-E (225x900) 2/E-F (225x900) 2Y16(B2) 2-2
2x3Y12-1-200 Side bars 2/F-G (225x900) 2/G-L (225x900) 2/L-M (225x900)
FOUNDATION BEAM 1
2375 2825 6000 2087 4404
3Y16(T1) 2Y16(T1) 700 700 3Y16(T1) (2) 2 bbb
2Y16(T2) ccc a=Y16-2(B1)
b=Y16-1(T1)
c=Y16-1(T2)
d d d=Y12-3-200

900
Y8-300 Y8-300 Y8-300 Y8-300 Y8-300 d d e=Y8-3-300
d d
3Y16(B1) 2Y16(B2) aaa
1550 900 900 3Y16(B1) (2) 2
225 e
1000 2-2
8/B-D (225x900) 8/D-E (225x900) 8/E-G (225x900) 8/G-H (225x900) 8/H-M (225x900)
FOUNDATION BEAM 2
5275 1216 2375 2825
3Y16(T1) bbb
2Y16(T2) (2) 2
ccc a=Y16-2(B1)
(2) 2
b=Y16-1(T1) 3Y16(T1)
c=Y16-1(T2)
d d d=Y12-3-200
900

Y8-300 Y8-300 d d e=Y8-3-300


d d Y8-300
aaa
4/G-L (225x900) 3Y16(B1) (2) 2 4/L-M (225x900)
225 e
2-2 5/B-D (225x900) 3Y16(B1) 5/D-E (225x900)
2x3Y12-1-200 Side bars (2) 2
FOUNDATION BEAM 3 2x3Y12-1-200 Side bars FOUNDATION BEAM 4
3375 2625 1950 3225
3Y16(T1) 3Y16(T1) (2) 2
(2) 2
bbb bbb
a=Y16-2(B1) a=Y16-2(B1)
b=Y16-1(T1) b=Y16-1(T1)
d d d d
d=Y12-3-200 d=Y12-3-200
900

900
Y8-300 Y8-300 d d Y8-300 Y8-300 d d
e=Y8-3-300 e=Y8-3-300
d d d d
3Y16(B1) (2) 2
aaa aaa
6/E-F (225x900) 6/F-G (225x900) 225 B/8-5 (225x900) (2) 2 B/5-2(225x900)
e
3Y16(T1) 225 e
FOUNDATION BEAM 5 2-2 2-2
2x3Y12-1-200 Side bars 2x3Y12-1-200 Side bars FOUNDATION BEAM 6
1950 3225 1425 3750
3Y16(T1) (2) 2
3Y16(T1)
(2) 2 bbb
bbb a=Y16-2(B1)
a=Y16-2(B1)
b=Y16-1(T1)
b=Y16-1(T1) d d
d d d=Y12-3-200

900
d=Y12-3-200 Y8-300 Y8-300

900
Y8-300 Y8-300 d d e=Y8-3-300
d d e=Y8-3-300
d d
d d
aaa
D/8-5 (225x900) (2) 2 D/5-2 (225x900) aaa E/6-2 (225x900) 3Y16(B1) (2) 2
225 e
3Y16(T1) 225 e E/8-6 (225x900)
2-2 2-2
2x3Y12-1-200 Side bars FOUNDATION BEAM 7 2x3Y12-1-200 Side bars
FOUNDATION BEAM 8
1425 3750
1425 3750
3Y16(T1)
(2) 2 bbb 3Y16(T1)
a=Y16-2(B1) (2) 2 bbb
b=Y16-1(T1) a=Y16-2(B1)
d d b=Y16-1(T1)
d=Y12-3-200 d d

900
Y8-300 Y8-300 d d e=Y8-3-300 d=Y12-3-200

900
Y8-300 Y8-300 d d e=Y8-3-300
d d
d d
aaa
3Y16(B1) (2) 2
225 e aaa
F/8-6 (225x900) F/6-2 (225x900) 3Y16(B1)
2-2
G/8-6 (225x900) G/6-2 (225x900)
(2) 2
225 e
2x3Y12-1-200 Side bars 2-2
2x3Y12-1-200 Side bars
FOUNDATION BEAM 9
FOUNDATION BEAM 10
2425 2300 450
(N) 1 (N) 2 (N) 3
3Y16(T1)
bbb
a=Y16-2(B1)
b=Y16-1(T1)
d d
d=Y12-3-200

900
Y8-300 Y8-300 Y8-300
d d e=Y8-3-300
d d
3Y16(B1) M/8-4 (225x900) 2x1Y8-300 aaa
M/4-2(225x900) 225 e
2-2
2x3Y12-1-200 Side bars FOUNDATION BEAM 11
DISCLAIMER
GENERAL NOTES PROJECT TITLE: DRAWING TITLE: DRAWING NO:
* All dimensions in millimeters except otherwise stated * We do not accept responsibility
PROPOSED 4 BEDROOM DETACHED DUPLEX AT
SCALE: NTS
* All dimensions to be read and not scaled off drawings for any component, element or construction method
SANYINBO VILLAGE, IBEJU-LEKKI LGA, LAGOS STATE R.C DETAILS OF RAFT
* All dimensions to be field verified which may be inferred but not herein described
S202
* Errors,discrepancies or ommissions to be reported BEAMS
* Queries must be clarified before any work commences
* Contractor to confirm sizes of components
* We do not accept responsibility for any work
not supervised.
DATE: SEPTEMBER, 2021
and specifications prior to manufacture and installation
* All materials to conform to specifications and subject to
appropriate testing where applicable CLIENT: DESIGNED : DRAWN: CHECKED:
* Contractor liable for correct setting out of points, levels
and heights with particular reference to MRS JOY OGHOGHO OKORO ECC ECC ECC
boundaries, building lines and external / internal walls IF IN DOUBT, ASK ............. IMMEDIATELY
APPROVAL COLUMN
5200 3375 2625 5275
712.5 2375 2825 3375 2625 2087 3188 1216
1925 454
712.5

(35) (35) 106 Y12-150 24 T1

(8)
(4)

(4)

(4)

(36)
(6)

10
78 12 Y12-200 25 T2
(13) 13 Y12-150 26 B1
9 Y12-150 27 B1
(8)

(8)

(8)

(8)

(8)

(15)
(9)
(22)

7 Y12-200 28 B2&T2

(19)
(7)
2750

(17)
3225

(19)
(3) (4)
(19)

(21) (19) (5) 40 Y12-150 29 B1

(16)
(19)

(4)
(12) 12 Y12-200 30 B2
(4) (5) (5) (4) (4)

(4)
39 Y12-150 31 B1

(4)
(17)
(35)

(22)

(22)
(22)

(15) 15 Y12-175 32 T1
(12) (11) 23 Y12-175 33 T1
(5)

(5)

(5)

(4)
(17) (20) (16) 53 Y12-175 34 T1
525

(8)
(9)
2425

(12)

(8)

(9)

(8)

(8)

(8)

(8)
1425

(9)
(11)

STAIRS

(8)
(5) 5 Y12-175 35 B2&T2
712.5

(4)
(4)

(4)

(4) (35) 84 Y12-150 36 T1


(6)

(35) (14)
8 Y12-200 08 B2&T2

4 Y12-200 17 B2&T2

8Y12-200 20 B2&T2
28 Y12-200 02 B2

27 Y12-200 11 B2

38 Y12-150 16 B1

15 Y12-200 22 B2
47 Y12-150 01 T1

31 Y12-175 04 T1

27 Y12-200 05 T2
21 Y12-200 06 T2

31 Y12-175 07 T1

21 Y12-200 09 T2

22 Y12-175 10 T1

21 Y12-200 12 T2
31 Y12-175 13 T1

24 Y12-200 15 T2

12 Y12-200 18 T2
24 Y12-175 19 T1

19 Y12-150 23 T1
8 Y12-200 40 B2

8 Y12-150 14 B1

9 Y12-200 38 T2
8 Y12-200 03 T2
8 Y12-200 37 T2

FIRST FLOOR SLAB DETAILS


712.5 2375 2825 3375 2625 2087 3188 1216
1500 710 820 820 960 960 790 790 635 635 910 1635
Y12-01

Y12-23
Y12-04

Y12-07

Y12-10

Y12-13

Y12-19
24 24 37 37 37 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 18 18 18 18 18 18 18 38 38 38 38 38 28 28 28
35 35 02 02 02 02 02 02 02 02 02 02 02 02 02 02 29 29 29 29 29 29 29 29 29 29 29 29 29 29 29 30 30 30 30 30 30 26 26 26 26 27 27 27 28 28 28

Y12-02

Y12-11

Y12-16

Y12-22
SECTION A
DISCLAIMER
GENERAL NOTES PROJECT TITLE: DRAWING TITLE: DRAWING NO:
* All dimensions in millimeters except otherwise stated * We do not accept responsibility
PROPOSED 4 BEDROOM DETACHED DUPLEX AT
SCALE: NTS
* All dimensions to be read and not scaled off drawings for any component, element or construction method
SANYINBO VILLAGE, IBEJU-LEKKI LGA, LAGOS STATE R.C DETAILS OF FIRST
* All dimensions to be field verified which may be inferred but not herein described
S203
* Errors,discrepancies or ommissions to be reported FLOOR SLAB DETAILS
* Queries must be clarified before any work commences
* Contractor to confirm sizes of components
* We do not accept responsibility for any work
not supervised.
DATE: SEPTEMBER, 2021
and specifications prior to manufacture and installation
* All materials to conform to specifications and subject to
appropriate testing where applicable CLIENT: DESIGNED : DRAWN: CHECKED:
* Contractor liable for correct setting out of points, levels
and heights with particular reference to MRS JOY OGHOGHO OKORO ECC ECC ECC
boundaries, building lines and external / internal walls IF IN DOUBT, ASK ............. IMMEDIATELY
APPROVAL COLUMN
713 5200 3375 2625 5275
(2) 3
1050 850 1500
850 700 850
1450 850
2Y16(T1) 2Y16(T1) 800 3Y20(T1) 2Y16(T1) 2Y16(T1) 700 3Y20(T1) 2Y16(T1)

150

150
b-b-b a=Y20(B1)
b=Y20(T1)
Y10-75 c=Y10-300

450
Y10-300 Y10-300 Y10-300 Y10-300
3Y16(B1)
450 3Y20(B1) 800 3Y20(B1) 2/E-F (225x450) 800 a-a-a c
2/A-B (225x150) 2/B-E (225x450) 2/F-G (225x450) 3Y20(B1) 2/G-L (225x450)
950 950 225
(2) 3
(2) 3 - 3
FIRST FLOOR BEAM 1
713 2375 2825 6000 2088 4404
1150 (8) 3
750
850 1700 600
850 1650
2Y16(T1) 3Y16(T1) 2Y16(T1) 700 3Y16(T1) 800 2Y16(T1) 800 3Y16(T1) 2Y16(T1)

150

150
b-b a=Y16(B1)
b=Y16(T1)
Y10-75 c=Y10-300

450
Y10-300 Y10-300 Y10-300 Y10-300 Y10-300
3Y16(B1)
450 2Y16(B1) 800 a-a-a c
3Y16(B1) (8) 3 3Y16(B1)
8/A-B (225x150) 8/B-D (225x450) 8/D-E (225x450) 8/E-G (225x450)
950 225
8/G-H (225x450) 8/H-M (225x450)
(8) 3 - 3
FIRST FLOOR BEAM 2
5275 1216
2825 (6) 3 3375 2625
(4) 1
2Y16(T1) 3Y16(T1)
150

150
b-b

150

150
a=Y16(B1) b-b-b a=Y20(B1)
b=Y16(T1)
d=Y16(B2)
c=Y10-300
b=Y16(T1)
450

450
Y10-300 Y10-300 Y10-300 c=Y10-300
Y10-300 Y10-300
3Y16(B1) a-a c a-a-a c
225 3Y20(B1)
6/E-F (225x450) 6/F-G (225x450) 2Y16(B2) 4/L-M 225
6/D-E (225x450) (6) 3
4/G-L (225x450)
(6) 3 - 3
(225x450) (4) 1 - 1
FIRST FLOOR BEAM 3 (4) 1
1B33 (225x450)
FIRST FLOOR BEAM 4
713 1950 3225 713
(5) 2 2375 700 550 (F) 2 3750
2Y16(T1) 2Y16(T1) (B) 3 2Y16(T1) 2Y16(T1) 2Y16(T1)

150

150
150

150

150

150
b-b a=Y16(B1)
b-b a=Y16(B1)
b-b a=Y20(B1)
b=Y16(T1) b=Y16(T1) b=Y16(T1)
c=Y10-300 Y10-75 Y10-75 c=Y10-300 c=Y10-300

450
450

450
Y10-300 Y10-300
Y10-300 3Y16(B1) 3Y16(B1) Y10-300
a-a B/9-8 450 B/2-1 a-a-a a-a-a
2Y16(B1) c 3Y16(B1) c
2Y20(B1) c
5/B-D (225x450) 225 (225x150) (B) 3 (225x150) 225 225
(5) 2
450 B/8-5 (225x450) F/6-2 (225x450)
(5) 2 - 2 B/5-2 (225x450) (B) 3 - 3
(F) 2
(F) 2 - 2
FIRST FLOOR BEAM 5 FIRST FLOOR BEAM 7
FIRST FLOOR BEAM 6
1950 3225
1000 713 1425 3750 712
(D) 3
800 700 550
700 2Y16(T1)
(E) 3
2Y16(T1) 2Y16(T1)
3Y16(T1) 550 3Y16(T1) 3Y16(T1)

150

150

150
b-b
150

150
(E) 1
b-b a=Y16(B1)
b=Y16(T1)
a=Y20(B1) b-b a=Y16(B1)
b=Y16(T1)
c=Y16(T1) Y10-75 Y10-75 c=Y10-300 b=Y16(T1)
d=Y10-300 d=Y10-75

450
a-a
450 Y10-300 Y10-300
Y10-300 Y10-300 3Y16(B1) 3Y16(B1) d
225
3Y16(B1) a-a d
(E) 1 2Y20(B1) 450 a-a-a c (E) 1 - 1
225 E/9-8 E/2-1 225
D/8-5 (225x450) D/5-2 (225x450) 450 (E) 3
(225x150)
(D) 3 (225x150) E/6-2 (225x450) (E) 3 - 3
(D) 3 - 3
E/8-6 (225x450)
FIRST FLOOR BEAM 8 FIRST FLOOR BEAM 9
713 1425 3750 712 713 2425 2750
1100 (G) 4
1150 (G) 3 700 (H) 3
2Y16(T1) 3Y16(T1) 800 2Y16(T1) 2Y16(T1) 2Y16(T1)

150

150
150
b-b

150

150
b-b-b a=Y20(B1) b-b a=Y16(B1)
a=Y16(B1) b=Y16(T1)
b=Y16(T2) Y10-75
Y10-75 Y10-75 b=Y16(T1) c=Y10-300
e=Y10-300 d=Y10-75

450
450
3Y16(B1) Y10-300 Y10-300
3Y16(B1) a-a-a d 3Y16(B1) Y10-300 Y10-300
225
(G) 4
2Y20(B1) 450 a-a-a e (G) 4 - 4 H/9-8 450 3Y16(B1) a-a-a c
G/9-8 G/2-1 225 (225x150) 225
(225x150)
450 (G) 3
(225x150) H/8-4 (225x450) (H) 3 H/4-2 (225x450)
(H) 3 - 3
G/8-6 (225x450) G/6-2 (225x450) (G) 3 - 3
FIRST FLOOR BEAM 10 FIRST FLOOR BEAM 11
2750 712 2425
(8) 4
(M) 2
(8) 2 550
2Y16(T1) 2Y16(T1) 2Y16(T1)

150

150

150
b-b c-c b-b
a=Y16(B1) b-b a=Y16(B1)
a=Y16(B1)
b=Y16(T1) b=Y16(T1)
c=Y16(T1) b=Y16(T1)
Y10-75 c=Y10-300 c=Y10-300

450
d=Y10-75

450
Y10-300
3Y16(B1) a-a-a d Y10-300
225
450 (8) 4 a-a-a c 3Y16(B1) a-a c
3Y16(B1) (8) 4 - 4
225
L/2-1 225
(8) 2 (M) 2
(225x150) (8) 2 - 2
M/8-4 (225x450)
(M) 2 - 2
L/4-2 (225x450)
L/4-2 (225x450)
FIRST FLOOR BEAM 12 FIRST FLOOR BEAM 13
DISCLAIMER
GENERAL NOTES PROJECT TITLE: DRAWING TITLE: DRAWING NO:
* All dimensions in millimeters except otherwise stated * We do not accept responsibility
PROPOSED 4 BEDROOM DETACHED DUPLEX AT
SCALE: NTS
* All dimensions to be read and not scaled off drawings for any component, element or construction method
SANYINBO VILLAGE, IBEJU-LEKKI LGA, LAGOS STATE R.C DETAILS OF FIRST
* All dimensions to be field verified which may be inferred but not herein described
S204
* Errors,discrepancies or ommissions to be reported FLOOR BEAMS
* Queries must be clarified before any work commences
* Contractor to confirm sizes of components
* We do not accept responsibility for any work
not supervised.
DATE: SEPTEMBER, 2021
and specifications prior to manufacture and installation
* All materials to conform to specifications and subject to
appropriate testing where applicable CLIENT: DESIGNED : DRAWN: CHECKED:
* Contractor liable for correct setting out of points, levels
and heights with particular reference to MRS JOY OGHOGHO OKORO ECC ECC ECC
boundaries, building lines and external / internal walls IF IN DOUBT, ASK ............. IMMEDIATELY
APPROVAL COLUMN
600 5200 6000 5275
1650
2Y16(T1) 800 2Y16(T1)
(10) 1
b-b a=Y16(B1)
b=Y16(T1)

300
Y10-225 Y10-225 Y10-225 Y10-225 c=Y10-225
3Y16(B1) 800 3Y16(B1) a-a c
10/N-B (10) 1
950 225
(225x300) 10/E-G (225x300) 10/G-L (225x300) (10) 1 - 1
10/B-E (225x300)
ROOF BEAM 1
5800 6000 5275 1216
1650
(4) 3 2Y16(T1) 800 2Y16(T1)
b-b
a=Y16(B1)

300
b=Y16(T1)
Y10-225 Y10-225 Y10-225 Y10-225 c=Y10-225
3Y16(B1) 800 a-a c
3Y16(B1)
(4) 3 950 225
(4) 3 - 3
4/E-G (225x300) 4/G-L (225x300) 4/L-M (225x300)
4/N-E (225x300)
ROOF BEAM 2
713 5200 6000 2088
700 (11) 3 1216
1650
2Y16(T1) 2Y16(T1) 800 2Y16(T1) 2Y16(T1) (2) 2
b-b
b-b
a=Y16(B1) a=Y16(B1)

300
b=Y16(T1) b=Y16(T1)

300
Y10-200 Y10-225 Y10-225 Y10-225 c=Y10-225 Y10-225 c=Y10-225
800 a-a a-a c
2Y16(B1) 2Y16(B1) c 2Y16(B1)
950 225 11/L-M (225x300)
225
11/N-B (11) 3 - 3
(2) 2 - 2
(11) 3 11/E-G (225x300) (2) 2
(225x300) 11/B-E (225x300)
11/G-H (225x300)
ROOF BEAM 3 ROOF BEAM 4
600 5175 712
150
(8) 2 4404 (L) 2 2750 600
(N) 1
2Y16(T1) 2Y16(T1)
2Y16(T1) 2Y16(T1)
b-b
b-b a=Y16(B1) b-b
a=Y16(B1) b=Y16(T1) a=Y16(B1)

300
b=Y16(T1)

300
Y10-225 c=Y10-225 b=Y16(T1)

300
Y10-225 c=Y10-225 Y10-225 Y10-225 c=Y10-225
Y10-225 Y10-200
a-a c a-a
a-a c 2Y16(B1) 2Y16(B1) c
2Y16(B1) 225
(N) 1
A/2-1 225 (8) 2 - 2 L/4-2-10 (225x300)
225
A/11-8 (N) 1 - 1 (8) 2 8/H-M (225x300) (L) 2
11/8-2 (225x300) (225x300) (L) 2 - 2
(225x300)
ROOF BEAM 5 ROOF BEAM 6 ROOF BEAM 7
(E) 2 6375 (G) 2 6375 (G) 3
2Y16(T1) 2Y16(T1)
b-b b-b a=Y16(B1)
a=Y16(B1)
b=Y16(T1) b=Y16(T1)

300
300
Y10-175 c=Y10-225 Y10-200 c=Y10-200
3Y16(B1) a-a c 240 3Y16(B1) a-a-a c
225 225
(E) 2
E/11-10 (225x300) (E) 2 - 2 (G) 2
G/11-10 (225x300) (G) 3
(G) 2 - 2
ROOF BEAM 8 ROOF BEAM 9
600 2425 3350 (M) 2 2425 2300 450
2Y16(T1) (H) 1 2Y16(T1)
b-b b-b
a=Y16(B1) a=Y16(B1)

300
Y10-225 b=Y16(T1) Y10-225

300
Y10-225 Y10-225 Y10-225 Y10-225 b=Y16(T1)
c=Y10-225 c=Y10-225
2Y16(B1) a-a c
2Y16(B1) a-a c
(H) 1
H/4-10 (225x300) 225 H/8-4 (225x300) H/4-3 (225x300) 225
H/8-4 (225x300) (H) 1 - 1
(M) 2
(M) 2 - 2
H/11-8 H/3-2
(225x300) (225x300)
ROOF BEAM 10 ROOF BEAM 10
DISCLAIMER
GENERAL NOTES PROJECT TITLE: DRAWING TITLE: DRAWING NO:
* All dimensions in millimeters except otherwise stated * We do not accept responsibility
PROPOSED 4 BEDROOM DETACHED DUPLEX AT
SCALE: NTS
* All dimensions to be read and not scaled off drawings for any component, element or construction method
SANYINBO VILLAGE, IBEJU-LEKKI LGA, LAGOS STATE
* All dimensions to be field verified
* Errors,discrepancies or ommissions to be reported
which may be inferred but not herein described
R.C DETAILS OF ROOF S205
* Queries must be clarified before any work commences
* Contractor to confirm sizes of components
* We do not accept responsibility for any work
not supervised.
BEAMS DATE: SEPTEMBER, 2021
and specifications prior to manufacture and installation
* All materials to conform to specifications and subject to
appropriate testing where applicable CLIENT: DESIGNED : DRAWN: CHECKED:
* Contractor liable for correct setting out of points, levels
and heights with particular reference to MRS JOY OGHOGHO OKORO ECC ECC ECC
boundaries, building lines and external / internal walls IF IN DOUBT, ASK ............. IMMEDIATELY
APPROVAL COLUMN
T/CONCRETE (ROOF) EL.+6.150
300

300

300
4Y16 05 4Y16 05 05 05 4 Y16 05
05 05

20 Y10 06-150 C/C LINKS


05 05
05 05
19Y10 01-150 C/C LINKS

19Y10 01-150 C/C LINKS


06

225
01
225

01

225
05
05 05
05
02 02 05 05
225 225
225
02-02
900

900

820
T/CONCRETE (FIRST FLOOR)
EL.+3.150
75

75
300
450

450

450
8Y16 04 4Y16 04
04 04 04 04
01
19Y10 01-150 C/C LINKS

19Y10 01-150 C/C LINKS

19Y10 01-150 C/C LINKS


4Y16 04 01

225
04 04

225
04 04 01
01 04 04 04
225

04
225 225
04 04
225
900

900

900
T/CONCRETE (GRD FLR.)
EL.+0.450
75

75

75
900

4Y16 02 8Y16 02 4Y16 02


DISCLAIMER
GENERAL NOTES PROJECT TITLE: DRAWING TITLE: DRAWING NO:
* All dimensions in millimeters except otherwise stated * We do not accept responsibility
PROPOSED 4 BEDROOM DETACHED DUPLEX AT
SCALE: NTS
* All dimensions to be read and not scaled off drawings for any component, element or construction method
SANYINBO VILLAGE, IBEJU-LEKKI LGA, LAGOS STATE R.C DETAILS OF
* All dimensions to be field verified which may be inferred but not herein described
S206
* Errors,discrepancies or ommissions to be reported COLUMNN
* Queries must be clarified before any work commences
* Contractor to confirm sizes of components
* We do not accept responsibility for any work
not supervised.
DATE: SEPTEMBER, 2021
and specifications prior to manufacture and installation
* All materials to conform to specifications and subject to
appropriate testing where applicable CLIENT: DESIGNED : DRAWN: CHECKED:
* Contractor liable for correct setting out of points, levels
and heights with particular reference to MRS JOY OGHOGHO OKORO ECC ECC ECC
boundaries, building lines and external / internal walls IF IN DOUBT, ASK ............. IMMEDIATELY
APPROVAL COLUMN
Y12-06

2425
Y12-02

5 equal threads @ 275mm


1375
Y12-06
6 equal threads @ 157.5 mm

Y12-01

Y12-01
Y12-04
945

612.5 500
07 8 Y12 01-150 c/c T1
8 Y12 02-150 c/c B1

1000
Y12-02

8 Y12 03-200 c/c B2


Y12-06

8 Y12 04-150 c/c T1


Y12-06
Y12-04

04
(4) 06
09 9 Y12 05-200 c/c T2
03 08 8 Y12 06-150 c/c T1
02 14 6 Y12 07-200 c/c B2&T2
8 Y12 08-150 c/c T1
612.5 500
11 Equal threads @ 275mm
3025
(5)
12 8 Y12 09-150 c/c T1
01 05 10 8 Y12 10-150 c/c B1
Y12-10
Y12-08

8 Y12 11-150 c/c T1

3187.5
8 Y12 12-150 c/c T1
12 Y12 13-200 c/c B2
Y12-08

11
8 Y12 14-150 c/c T1
Y12-09

Y12-09

12 equal riserS @157.5mm


13

1890
Y12-11
Y12-10

150
STAIRCASE DETAILS
DISCLAIMER
GENERAL NOTES PROJECT TITLE: DRAWING TITLE: DRAWING NO:
* All dimensions in millimeters except otherwise stated * We do not accept responsibility
PROPOSED 4 BEDROOM DETACHED DUPLEX AT
SCALE: NTS
* All dimensions to be read and not scaled off drawings for any component, element or construction method
which may be inferred but not herein described SANYINBO VILLAGE, IBEJU-LEKKI LGA, LAGOS STATE R.C DETAILS OF STAIRCASE
* All dimensions to be field verified
* Errors,discrepancies or ommissions to be reported S207
* Queries must be clarified before any work commences
* Contractor to confirm sizes of components
* We do not accept responsibility for any work
not supervised.
DATE: SEPTEMBER, 2021
and specifications prior to manufacture and installation
* All materials to conform to specifications and subject to
appropriate testing where applicable CLIENT: DESIGNED : DRAWN: CHECKED:
* Contractor liable for correct setting out of points, levels
and heights with particular reference to MRS JOY OGHOGHO OKORO ECC ECC ECC
boundaries, building lines and external / internal walls IF IN DOUBT, ASK ............. IMMEDIATELY

You might also like