You are on page 1of 1

DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

ALL RIGHTS RESERVED.


c OVE ARUP & PARTNERS HONG KONG LIMITED.
NOTES

1. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH


DRAWING NOS. 244005/FL/DS/1011 TO 1014.

2. DETAILS OF MANHOLES REFER TO RELEVANT DSD LATEST


STANDARD DRAWINGS FOR TYPE OF MANHOLE SPECIFIED
DRAINAGE MANHOLE AND CATCHPIT SCHEDULE ON THE MANHOLE/CATCHPIT SCHEDULE.

3. FOR GENERAL NOTES REFER TO DRAWING NOS.


244005/FL/DS/1001 & 1002.

4. THE PIPE NUMBERING OF THE INLET PIPE / DRAIN


SHOWN IN THE MANHOLE SCHEDULE SHALL BE AS
01
FOLLOWS: A1, A2, A3, ETC COUNTED IN CLOCKWISE
DIRECTION FROM THE OUTLET PIPE.

5. THE COVER LEVELS SHOWN IN THE MANHOLE SCHEDULE


ARE FOR REFERENCE ONLY. THE FINAL COVER LEVELS
01 SHALL BE VERIFIED ON SITE TO MATCH WITH THE FINAL
FINISHED ROAD / GROUND LEVELS.

6. THE PROPOSED INVERT LEVELS SHOWN FOR THE PROPOSED


DRAINAGE AND FOUL SEWER CONNECTION POINTS TO THE
DEVELOPMENT SITES AT THE SITE BOUNDARY SHALL BE
VERIFIED ON SITE.
01

01

01

01
01

01 TENDER ADDENDUM NO. 1 EY 05/22

- TENDER DRAWING EY 04/22

Rev Description By Date

Consultant

Contract No. and Title:

Contract No. CV/2022/08

Site Formation and Infrastructure


Works at Area 48, Fanling
L\244005_FL_DS_1023.dgn

Drawing title

DRAINAGE SCHEDULES

(SHEET 3 OF 3)
VI
V:\244005\ARUP\CI

Drawing no. Rev.

244005/FL/DS/1023 01
5/16/2022

Drawn Date Checked Approved

JC 07/21 AW DL
Scale Status
N/A TENDER
COPYRIGHT RESERVED
nted by :
enam e :

Civil Engineering and


Development Department
Pri
l
Fi