dia of bars
8. REINFORCEMENT DETAILING SHALL BE AS PER SP-34.
31'-6" 9. CONSTRUCTION SHALL BE DONE IN ACCORDANCE WITH IS 456:2000.
10.EXECUTION AT SITE AS PER STRUCTURAL DRAWINGS SHALL BE
ENSURED BY PMC/ CONTRACTOR'S TEAM.
4' 3'-61
2" 3'-21
2" 4' 3'-9" 8'-101"
2 4'-11" REINFORCEMENT DETAILS:
2 1. HIGH YIELD STRENGTH DEFORMED BARS MARKED AS "#" WITH
CHARACTERISTIC STRENGTH 500 N/MM² (Fe 500 D) CONFIRMING TO IS
1786-2008 SHALL BE USED.
2. ALL LAPS AND DEVELOPMENT LENGTH FOR M-25 SHALL BE 49 TIMES
421" 421"
CONCRETE DETAILS:
421"
421"
456-2000 UNLESS OTHERWISE NOTED.
C-3
G 2. COMPRESSIVE STRENGTH TEST MAY BE CARRIED OUT AT 7 & 28 DAYS
9"
9"
1'
TO CHECK THE QUALITY OF CONCRETE IN LINE OF IS:456.
3. CLEAR COVER OF CONCRETE TO THE MAIN REINFORCEMENT UNLESS
1'-6" 2' OTHERWISE SPECIFIED SHALL BE AS FOLLOWS:
2'
5'-11"
721"
PARTICULAR BOTTOM TOP SIDES
2
FOOTING SLAB/ 2" (50 MM) 2" (50 MM) 2" (50 MM)
BEAM
RETAINING WALL 1½" (40MM) - EARTH SIDE
9"
421"
1" (25MM) - INSIDE FACE
9"
421"
2'
421"
4'-9"
421"
ROOF SLAB OF
2" (50 MM) ¾" (20 MM)
WATER TANK
421"
NOTE:- THIS STRUCTURE IS DESIGNED FOR
421"
C-6 1'-6"
421"
STILT+3 FLOORS.
E
9"
9"
C-7
3'-71"
1'-121"
C-8 C-9 C-10 1'
1'-6"
2'
9"
421"
421"
421"
2'
421" 421"
16'-9"
46'-6"
9"
C-12 1'
C-11
421"
2'
C
1'
721"
2'
421"
11'
9"
9"
C-13 C-14
1'-6"
2'
B
421"
421"
421"
421"
5'-3"
2'
C-15
A
9"
1'
421"
STRUCTURAL CONSULTANT:-
DAV CONSULTANTS
Office No. 304, Okay Plus Big
Benn, Swez Farm, New Sanganer
Road, Jaipur-302019
Email:- davconsultants304@gmail.com
Phone- +91-7665011630, +91-9694990220
PROJECT NAME-
APARTMENTS AT SIKAR
DRAWING TITLE-