No.10875 Inquiry Regarding Gas Power Plant Purchase - Initial Stage 50 MW, Future
Expansion to 500 MW 2024/01/14 18:52:29

Dear Sir/Madam
I hope this email finds you well. My name is Samiullah Rohani, and I am writing on
behalf of Gulbahar Group, an esteemed company actively involved in the development
of energy projects. Our vast portfolio spans various sectors, including construction,
general trading, tobacco, hospitality, cement, and pharmaceuticals, operating in
Afghanistan and more than 50 countries worldwide, with our principal office situated in
Dubai, UAE.
We are currently in the process of working on energy infrastructure and are exploring
options for a gas power plant to meet our growing energy needs.
After thorough research, we were impressed by the reputation and expertise of your
prestigious Company in providing cutting-edge and reliable power solutions. Your
company's commitment to excellence aligns with our vision for sustainable and efficient
energy production.
We are interested in initiating the first phase of our project with a 50 MW gas power
plant. However, as part of our long-term strategy, we plan to expand the facility to a
total capacity of 500 MW in subsequent phases. Given your company's track record in
delivering scalable and adaptable solutions, we believe that your company is the ideal
partner to support our ambitious goals.
To facilitate further discussions and explore the possibilities of collaboration, we would
appreciate it if you could provide us with the following information:
1. Detailed specifications and Pricing related to your gas power plant offerings,
specifically tailored for a 50 MW initial stage and the potential for expansion up to 500
MW.
2. Cost estimates for the 50 MW initial installation and any relevant pricing structures
for future expansions.
Additionally, we would be interested in any case studies or references from similar
projects your company has successfully undertaken.
We are eager to move forward with this project and believe that a partnership with your
company would be mutually beneficial. Please let us know if there is a convenient time
for a meeting or if you would prefer additional information from our end.
Thank you for considering our inquiry. We look forward to the possibility of working
together and creating a successful and sustainable energy future.
Warm Regards
Samiullah Rohani
s.rohani@gi.com.af
+93777873079
Gulbahar Group

Category:Small and medium gas turbines

2/5
: Gas Turbine Combined Cycle Power Plants (Middle
: Mr.
: SAMIULLAH
: ROHANI
: Gulbahar Group
: Gulbahar Energy
: Energy Specialist
: Related industry
: Afghanistan
: 1001
: Our main office in UAE
: +93777873079
: I agree with MHI handling my personal information.

3/5
Answer Contents(1) 2024/01/16 09:13:32

Dear Mr. SAMIULLAH ROHANI,

Thank you very much for your kind interest in our products.
Regarding your 50MW initial installation, most close gas turbine would be H-25 with the
simple cycle capacity of approx. 40MW at ISO condition (15deg.C, 60%Relative
Humidity). In case of H-25 combined cycle (1 gas turbine on 1 steam turbine), output
would be around 50MW. Please refer to H-25 introduction page and other line-ups in
our web site.

https://power.mhi.com/products/gasturbines/lineup/h25
https://power.mhi.com/products/gasturbines/lineup

In case you prefer simple cycle (gas turbine only), we have aero derivative type.

https://power.mhi.com/group/aero/products

Please kindly let us know whether our gas turbine in line ups matches to your needs or
not.

In the mean time, it would be appreciated if you could kindly provide following
information for our consideration.

1. What is the fuel gas source?


2. location of the site that gas turbines is intended to be installed? (City, County,
Country)
3. Before or Midst ot After Feasibility Study?
4. Simple cycle or Combined cycle (with steam turbine) or Combined Heat & Power
(without steam turbine)?
5. minimum allowable output (in kW) of each Gas Turbine and No. of GT units that will
consist the entire power plant (500MW)? In case n+1(redunduncy stand by) unit
required, please also specify?
6. Do you consider same gas turbine model for 500MW or can size of gas turbine vary
in 500MW?
7. Power/Heat supply to? (industry or national network or isolated network).
8. Base (flat) load operation or Intermittent (fluctuating) operation?
9. Amount of Gas (per hour) that can be supplied to GTs.
10. Your company's role; Owner or Consultant to Owner/Developer or Engineering
Contractor or Construction Contractor or ?

Sincerely,

4/5
Additional inquiry contents(1) 2024/01/21 17:12:41

Dear Mitsubishi Team,

I extend my sincere appreciation for your prompt response. Your timely assistance is
invaluable. Kindly refer to the attached file for the comprehensive answers to your
inquiries.
please feel free if you have questions regarding our project.

Thank you and best regards,

Rohani
s.rohani@gi.com.af


Answer to Inquiry.pdf (26.1 KB)

Answer Contents(2) 2024/01/22 10:41:23

Dear Mr. SAMIULLAH ROHANI,

Thank you very much for your kind answer.


We will review them and get back to you later.

Sincerely,

Answer Contents(3) 2024/01/22 13:22:24

Dear Mr. SAMIULLAH ROHANI,

In order to make proper assignments, we would like to know your physical location.
Are you stationed in Dubai? If so, we woild have our colleague in Dubai contact you.
It would be better if we could know each other in face at Dubai.
We are sorry that we do not have office in Afganistan. We might have to look for
Japanese trading firm that has office in Afganistan.