100 of uptime
decided
6 Equipment's uptime Uptime for various equipment to be agreed Quarterly uptime calculate 5 % of uptime decided
90-100%
<90%
%of preventive work >95%
To schedule and implement the maintenance programs which are as per O & M reuirement. The PPM Preventive maintenance work
7 Planned preventive maintenance 12 orders completed 75-95%
schedules and procedures should be updated from time to time orders completed
versus planned 75%
Record Diesel Usage All records received
Capturing Daily record
1 Provide monthly reproting of energy management Utility consumption tracking 5
Energy usage information of required data All records not
Energy management Water usage information 10 received
Follow Energy saving practices No violation
Follow the required
2 Implement energy saving awareness/ Practices Appropriate signage as agreed All utility 5
practices Any violation
Instruction for correct use of equipment
Fire detection and alarm checks >90%
Firefighting equipment's checked as per appropriate by site and local working % of activities
Preventive maintenance work 85-90%
1 instructions No report of noncompliance by agreed audit procedure 6 done/activities
orders completed for fire system
Health safety and Means of Escape routes checked scheduled
<85%
environment Riser checked
10
(including fire and # of reported injuries <5
2 Workplace accidents Accident book to be kept and statics reported monthly No of workplace injuries 2
emergency per month >5
At least once in a
# of safety surveys conducted on
3 Safety culture Asses the site with respect to safety standards as per guidelines 2 # of reported incidents month
site
not done