Professional Documents
Culture Documents
Value of
Date of
Sl.No Date of Work
Name of Project Completi Client(s)/Location
. Award Performed
on
(SR)
1. Five Miscellaneous Jobs - Inter Riyadh Oil
connection pipelines of Riyadh Refinery
Oil Refinery Pipelines, c/o. Mace Saudi
Upgrading of Hydrocarbon SR
facilities, Blast Proof control Mar. '82 Aug.’ 84 Arabia Ltd.
1,000,000
room design.
Mr. Luke F.
DeBock
2. Engineering Design (Cathodic
SR
Protection for Wells & Oct. ‘82 Jun. ‘85 MAPLE (UK)
14,000,000
Flowlines)
3. Engineering Study (General site
review. Update Dha. North, Dha. Dhahran / Abqaiq -
Jan. '83 Jun. ‘84 SR 430,928
Clinic & Abqaiq region, Abqaiq ARAMCO
Clinic and Qurayyah)
4. Engineering & Drafting (Testing
Services for 6GHZ Digital Dhahran -
Feb. '83 Jun. ‘84 SR 190,316
Communication Backbone ARAMCO
System for the Eastern Province)
5. Construction Supervision King Wilkinson
SR
(Offshore Structural Apr. '83 Jun. ‘83 (UK)
1,109,707
Engineering)
6. Architectural & Engineering
Design & Supervision (General
SR Dhahran -
Engineering Services for ER – Dec. '83 Jun. ‘85
2,394,808 ARAMCO
2780 Ar – Rabiyah executive
Housing Program)
7. Engineering Design & Drafting
(Administration Building for the
Feb. '84 Jul. ‘85 SR 168,000 Ballast - Nedam
R. A. S. F at the king Khaled
Airbase – Khamis Musshayt
8. Engineering and Detail Design
(Reroute of 36” / 24” Fuel Gas Feb. '84 May ‘85 SR 224,334 Yanbu - ARAMCO
Line 1800 ft. – Yanbu)
9. Conceptual & Detail Design
Dhahran -
(ARAMCO Aviation Center Oct. ‘85 May ‘86 SR 730,136
ARAMCO
Facilities – EPIA)
10. ARAMCO Aviation Center SR
ARAMCO
Facilities at KFIA Mar. '85 Nov. '85 1,150,556
A. M. Al - Aqeel
Contract No. 15854/00
11. Khuff Gas Wellhead Air Reserve Apr. '85 Jan. '86 SR 196,468 ARAMCO
Value of
Date of
Sl.No Date of Work
Name of Project Completi Client(s)/Location
. Award Performed
on
(SR)
Vessel BI – 8107 M. A. Mullen
12. Khuff Gas Well U - 616 to U-
SR 359,425 ARAMCO
GOSP-11 Project Proposal, Apr. '85 Sep. '86
K. W. Richardson
BI-8157
13. Uthmn Gas Plant Drafting SR 165,600 ARAMCO
Jun. '85 Dec. '85
Support P. Collela
14. Khuff Gas Flowline U - 623 to U SR 162,993 ARAMCO
Jul. '85 Oct. 85
- GOST - 10 J. F. Yamzon
15. Area and Skid Lighting for
SR 120,758 ARAMCO
Shedgum and Uthmn. Khuff Jul. '85 Oct. '85
A. Q. Regino
Gas Wells.
16. Hexene Purification Project
PDM Saudi Arabia
Electrical, Instrumentation Aug. '85 Dec. '85 SR 135,750
Mr. G. Heywood
Design
17. Saudi Fisheries Fish Depot Saudi Fisheries
Processing Plant (Haskoning) SR 575,000 Company,
Sep. '85 Oct. '86
Service Order 002-SATECH Dammam.
Mr. S. H. Mid
18. Design for Frantel National Al Robaya
Hotel – Najran Five Star Hotel Feb '86 Mar '86 SR 415,000 Establishment,
Mr. K. R. Mathew
19. Abandon Old Pump House - 2
ARAMCO
and replace Sub - Station - 19, May. '86 May. '87 SR 135,147
R. I. Cimioco
131 - 8146 PRI.4
20.
Detail Design of Andr-303
Saudi ARAMCO
Trunkline to Andr-GOSP-1 and
Sept. '86 Nov. ‘90 SR 633,000 (PPD/MPPD)
Fire water System Extension at
Abqaiq
Andr-GOSP-2 Contract
#540/713-200/141
21. Engineering Services for SCECO
East/Central 380kV SR 222,000 SCECO, Dammam
Oct. '86 Apr. 87
Interconnection. Contract No. Mr. J. D. McNab
80870/01
22. EWD # 170 – Yanbu & Yanbu
Petromine Refinery # 1
ARAMCO Yanbu
East/West Pipeline Mofifications Oct. ‘86 Nov. ‘86 SR 5,846.40
Mr. D.A. Mehar
Platforms Conract No.SO-
406/713-200/Y47
23. Foodstuffs Production Facilities Best Foods Saudi
at Royal Commission for SR 900,000 Arabia Limited
Dec '86 May '87
BINZAGR – Yanbu. Design & (CPC)
Supervision Mr. S. McCall
24. Mar. '87 Sep. ‘90 SR 789,000 Saudi ARAMCO
Detail design of BI-8167 Abqaiq
Trunkline/ Testline of U-663 and
Value of
Date of
Sl.No Date of Work
Name of Project Completi Client(s)/Location
. Award Performed
on
(SR)
Value of
Date of
Sl.No Date of Work Client(s)/
Name of Project Completio
. Award Performed Location
n
(SR)
1. 380/13.8kV Substations PS-2 SWCC / Saudi
and PS-3 at RAZ AL KHAIR; Elecrticity
Mar. 2009 May 2010 SR 2700,000
Contractor SSEM Company Eastern
Operating Area.
2. 380/115kV Jubail Royal Commision
Community-2 Substation 8AB Jubail / Saudi
at Jubail; Contractor SSEM Feb. 2010 Aug 2011 SR 995,000 Elecrticity
Company Eastern
Operating Area.
3. New Dharan south
Saudi Elecrticity
380/115kV/13.8kV
May 2009 Sept 2010 SR 1200,000 Company Eastern
Substations at Dhahran;
Operating Area.
Contractor SSEM
4. Expansion of 115kV GIS and
Replacement of Busbar
Saudi Electricity
Protecion at Jubail SouthEast
Mar. 2009 May 2010 SR 352,000 Company Eastern
115/13.8kV Substation. (SEC
Operating Area.
PTS No. 05ER130);
Contractor SSEM
5. Preparation of PTS and
Drawings for new
Royal
115kV/13.8kV Substation
Mar. 2010 May 2011 SR 600,000 Commission
24BD for Jubail University
Jubail.
College – SEC PTS-
10EN1009
6. Development of Primary and
Secondary Infrastructure/ Site
Deveopment at Jalmudah and
Muthrafiah sectors in Jubail.
Development of logistics
Area, Development of Buffer
Zone and development of
Jalmudah Parks. Royal
2009 2011 12,000,000
Site development, right of Commission
ways, lift stations, storm
water, sewerage water &
potable water system, Design
of Power distribution, Load
flow analsis and lighting
system for the Infrastructure /
Site development.
7. Development of industrial 2009 2011 2,5000,000 Royal
highway (road TS3) in Jubail
Industrial City and associated
road lighting and electrical Commission
power (RC contract # 092-
C41)
8. Development of Jubail airport
road # TS4 and associated
Royal
road lighting and electrical 2009 2010 2,000,000
Commission
power (RC contract # 092-
C49)