You are on page 1of 8

ENGINEERING GRAPHICS AND DESIGN KZN PROVINCE GRADE 11 EGD

MANUFACTURING, ENGINEERING AND TECHNOLOGY SUBJECTS


NAME OF LEARNER :
____________________________________________________________________________________________________________
NAME OF SCHOOL :
____________________________________________________________________________________________________________
2023
ENGINEERING GRAPHICS AND DESIGN KZN PROVINCE GRADE 12
11 EGD
ENGINEERING GRAPHICS AND DESIGN
PROGRAM OF ASSESSMENT
NAME ____________________________________________________________________
GRADE 11
2023
GRADE 11 TERM TWO
TERM 2 MAX. MARK
CONVERTED
MARK
MODERATED
MARK
TERM
MARK
CD 5 2 POINT PERSPECTIVE
41 10 10
CD 6 CIVIL - FLOOR PLAN + ELEVATION
PROGRAM OF ASSESSMENT CD 7 CIVIL - SECTIONAL ELEV + ANALYTICAL

39
60

10
10

10
10
TOTAL
140 30 30 40
2023 JUNE EXAMINATIONS
PAPER 1
115 100 100
PAPER 2
130 100 100
TOTAL
245 200 200 60
TERM TOTAL
100
7
ENGINEERING GRAPHICS AND DESIGN KZN PROVINCE GRADE 11 EGD
COUESE DRAWING 5 : TWO POINT PERSPECTIVE
ASSESSMENT CRITERIA
Given: POSSIBLE OBTAINED SIGN MODERATED
Two views of a SHOP and the information necessary to draw a two
point perspective drawing. CONSTRUCTION
PP -Picture Plane 1 + VPs
6
GL-Ground Line
HL-Horizon Line 2 WALLS + STEP + 1821
SP-Station Point RAMP
Instructions:
3 WINDOW + 821
DOORS
Complete the perspective drawing.
4 ROOF 8
· Align the drawing sheet with the ground line.
· Determine and label the vanishing points.
· Show the wall thickness at the door and window TOTAL 41
· Show ALL necessary constructions.
· NO hidden detail is required. [41]
PP
HL
GL
SP
NAME:
2 POINT PERSECTIVE
GRADE: 11 / / 2023 CD 05
DRAWING
8
ENGINEERING GRAPHICS AND DESIGN KZN PROVINCE GRADE 11 EGD
WINDOW SCHEDULE DOOR SCHEDULE ELECTRICAL LEGEND
COURSE DRAWING 6 : CIVIL DRAWING
SWITCHES
1022 2000 900 836 TO FIT
511 511 511 32 GIVEN :
* An incomplete floor plan of a garden cottage showing the:
► window position & door position
LIGHTS ► positions of the plumbing, electrical and other fixtures
949

1540

3 X 40W
* An incomplete North elevation showing the:
2100

2100
2068

► window position and door position


WINDOW (W1)
► ceiling height, ground level & floor level.
2 X 40W
WINDOW (W2) INSTRUCTIONS :
SOCKET OUTLETS 1. Complete the given floor plan using a scale of 1 : 50.
NOTE: 150 x 20 FIBRE CEMENT SILL UNDER ALL FRAME INTERIOR SLIDING DOOR (D2)
WINDOWS DOOR (D1)
2. Draw, to scale 1:50, the North elevation.
FLOOR PLAN INSTRUCTIONS
PLUMBING FIXTURES · Hatch all the external and internal walls
· Insert all window and door details
SHOWER BATH · Label the floor plan, print the scale.
(SH) (B)
· Insert the following electrical detail according to the
900 1800 legend given:
1. THREE-POLE LIGHT SWITCH
2650

2. SINGLE-POLE LIGHT SWITCH


3. CEILING LIGHT

900
4. 2 X 40W FLUORESCENT LIGHT

750
FLOOR LEVEL GROUND 5. SWITCH SOCKET OUTLET
250

LEVEL NOTE: The arrow shows the light connection to the


INCOMPLETE NORTH ELEVATION switch.
· Insert fixtures according to the legend given:
A. SHOWER
B. SINK
WATER CLOSET WASH BASIN
C. WATER CLOSET
(WC) (WHB)
D. WASH BASIN
500 570 E. BUILD-IN CUPBOARD
W1 W1 · Indicate the room designations and floor coverings as
5

283
A D D1 B follows:

930
BATHROOM - TILES

850
470
BATHROOM
3 3 BEDROOM - CARPET
KITCHEN
KITCHEN - TILES
4 FFL
LOUNGE - TILES

290
C 1
D1 PORCH - TILES

760
2

500
E 3 5 NORTH ELEVATION INSTRUCTIONS
LOUNGE
· Insert all window and door details.
D1 570
5
2 2 · Label the elevation.
3 D2 · Use the correct abbreviations and label the following:
PORCH SINK finished floor level and natural ground level.
BEDROOM
(S) BUILT-IN CUPBOARD
3
(BIC)
W2

510

600
1100 TO FIT
CIVIL
INCOMPLETE FLOOR PLAN
CD 06
ASSEMBLY
9
ENGINEERING GRAPHICS AND DESIGN KZN PROVINCE GRADE 11 EGD
COUESE DRAWING 6 : CIVIL DRAWING [ FLOOR PLAN + ELEVATION]
ASSESSMENT CRITERIA
FLOOR PLAN
1 HATCHING 3
2 DOORS 4½
3 WINDOWS 6
4 FIXTURES 5½
6 LABELS 6
SUBTOTAL 25
SOUTH WEST ELEVATION
1 WALLS, NGL, FFL 4
2 WINDOW 5½
3 DOOR 3
4 LABELS 1½
SUBTOTAL 14
TOTAL = 39
NAME:
CIVIL
GRADE: 11 / / 2023 CD 06
ASSEMBLY
10
ENGINEERING GRAPHICS AND DESIGN KZN PROVINCE GRADE 11 EGD
COURSE DRAWING 7.1 : CIVIL DRAWING
DOOR SCHEDULE PLUMBING FIXTURES SECTIONAL ELEVATION
WINDOW SCHEDULE
FEATURES: GIVEN:
2100 W 201 550
D : DOOR
SD : SLIDING DOOR
900 · The complete floor plan of a house, showing the walls and
ST : STEP the position of : windows, doors, features, fixtures and
180
W201 - W203 : WINDOWS electrical fittings. [ ON THE ANSWER SHEET]

780
850

·
1500

A B C B A The complete south elevation.[ ON THE ANSWER SHEET]

400
FIXTURES : FLOOR LEVEL · The incomplete foundation and wall details.
1. : WATER CLOSET · A table of electrical symbols.
· A door and window schedule, and plumbing fixtures.
2100

2. : DOUBLE BOWL SINK 550


450
3. : HAND WASH BASIN
2100 W 202 · Dimensions for appliances, step, bic and queen size bed.
4. : SHOWER

250
400
5. : BATH
6. : BUILT IN CUPBOARD INSTRUCTIONS:
7. : FRIDGE Answer this question on the answer sheet provided.
900

A B C B A

650
HAND WASH BASIN
8. : STOVE
9. : QUEEN SIZED BED · 7.1. Draw A Sectional Elevation on cutting plane AA,
INTERNAL/EXTERNAL (D) using a scale 1 : 20.
W 203
ELECTRICAL FITTINGS: A A
WATER CLOSET
Start with corner A of the foundation, as shown.
10. SINGLE POLE SWITCH
600

1800
800

11. TWO POLE SWITCH B B


12. 2 X 40W FLUORESCENT TUBES · All drawing must comply with the guidelines and
C C conventions as contained in the SANS 10143 document.

750
13. CEILING LIGHT BATH TUB
14. WALL MOUNTED LIGHT 1200
15. SWITCHED SOCKET OUTLET SPECIFICATIONS :
16. DISTRIBUTION BOARD
17. TELEPHONE- INTERNAL NOTES: A: HINGED SIDE. 1800

2100
B: OPENING SIDE. THE SECTIONAL ELEVATION (SCALE 1:20)
C: FIXED PANEL.
Show the following features on your drawing:
175 X 25 FIBRE CEMENT
DOUBLE · The complete foundation details and walls.

500
SILL UNDER ALL WINDOWS
FOUNDATION DETAIL BOWL SINK
· The window detail with a double lintel above.
CONCRETE FLOOR SLAB: 100 STEP DETAILS : RISER - 150 · All hatching details and respective sanware.
1500
GRANOLITHIC SCREED : 25 THREAD - 300
FLOOR TO CEILING : 2700
SLIDING DOOR(SD) Note:
WIDTH - 2100
Use correct abbreviations to label the following
A

900 X 900
features in the correct views:
W 202 W 203 SHOWER BASE
D ground level, finished floor level, damp proof course and
10 3
175

2 4 fixtures.
16

NGL
Label the elevation and scale used.
500

15
220
GRANITE EN-SUITE You may draw the substructure-hatching, freehand.

1
12 TOPS 13
A APPLIANCES TOTAL: 30
400

KITCHEN
BIC
A
600 · FRIDGE : 650 X 650 X 1800
5

8
FOUNDATION DETAIL · STOVE : 900 X 500

7
LOAD BEARING WALL
6
D

11
15
ELECTRICAL LEGENDS D 1520 600 DEPTH
SWITCHES LIGHTS SOCKET
OUTLET
OR LOUNGE
13

6
13

TO FIT
W 201

1820
OR

9
BEDROOM
N X 40W
TELEPHONE
NOTE: BUILT-IN-CUPBOARD
17 15
THE ARROWS SHOW LIGHT(S)
CONNECTED TO RESPECTIVE
11
SD W 201 N QUEEN SIZE BED PLAN VIEW
SWITCHES. ST 14
SCHEMATIC FLOORPLAN
11
ENGINEERING GRAPHICS AND DESIGN KZN PROVINCE GRADE 11 EGD
COUESE DRAWING 7.1 : CIVIL DRAWING [ SECTIONAL ELEVATION ]
CEILING HEIGHT
FFL
NGL NGL
SOUTH ELEVATION
A
W 202 W 203
DB

WHB
S
SH
WC
2 X 40W
EN SUITE A
KITCHEN TILES ASSESSMENT CRITERIA
TILES
SECTIONAL ELEVATION
B
1 WALLS, LINE BRK 5
R 2 FOUNDATION 5
3 WINDOW 5
BIC
4 HATCHING 6
5 SANWARE 6
LOUNGE BEDROOM 6 LABELS 3
TILES CARPET
7.1.SUB TOTAL 30
7.2.SUB TOTAL 30
W 201

BIC
FINAL TOTAL 60
A
W 201
NAME:
FLOOR PLAN CIVIL
GRADE: 11 / / 2023 CD 7.1
SCALE 1:50
12
ENGINEERING GRAPHICS AND DESIGN KZN PROVINCE GRADE 11 EGD
COURSE DRAWING 7.2 : CIVIL DRAWING [ANALYTICAL]
C
GIVEN:
A floor plan and an elevation of a dwelling, a title panel and a table of questions. The drawing has
E
not been prepared to the indicated scale.
D INSTRUCTIONS:
Complete the table below by neatly answering the questions, which all refer to the accompanying
B drawing and title panel.QUESTIONS
M ANSWERS
A 1 Who is responsible for drawing this plan? 1
2 How old is the Engineering company? 1
3 What is the website address of this company? 1
_________ ELEVATION 4 What does the line at A represent? 1
5 What does the line at B represent? 1
6 What does the line at C represent? 1
G
7 What is the feature at point D called? 1
8 What type of window is represented at E? 1
MASTER BEDROOM
( TILES) F
9 What is the room at F commonly known as? 1
( TILES )
10 What type of door is represented at G?. 1
L 11
What does the feature at H indicate? 1
12 What does the arrow at I represent ? 1
13 What symbol is represented at L ? 1
LOUNGE 14 What does the feature at K represent? 1
( TILES)
15 Identify the feature that is missing at J ? 1
16 What does the feature at M represent? 1
17 Suggest an alternative floor finish for room F, besides
1
"tiles"?
J
1200

18 Suggest an appropriate external wall finish, besides


1
"plaster and paint?
3400

Provide a suitable title for the above view, by completing:


19 1
2 x 40 w ______________ elevation ?
TV ROOM K 20 Identify a possible type of fixture represented at N?. 1
( TILES) 3
2 21 Draw freehand, the front view and top view of the BATH. 4
H
1 22 Calculate the Floor Area of the TV room, in meters square. 6
800
4000 I
DRAWN:
CHAVEZ
DATE:
30-03-2016
CAD:
AutoCAD 2015 CHANES CIVIL Answer Question 21: Answer Question 22:
CHECK:
SAM
DATE:
02-04-2016
DWG NO:
DoE-JUN-001-2016
ENGINEERING
ENGINEER: 19 Foresure Drive
GARY Proposed new dwelling for Mr. Joe Soap, at Sydenham
REVISION: Sundowner Avenue, on lot 19 of Klein Zeekoe Durban
02 Vallei 803. "Reliasing South African
livinginstyle@gmail.com Dreams since 1964"
SCALE:
NAME :
Rate No: 10910
1:100 www. dreamhabitat.co.za
GRADE / DIV. :
30
13

You might also like