MC-1 SS-112
MC-1 SS-112
Maintenance No:
Work Pack No: SITE : Kawengan
SH1 No : TPN-110-C-0001
MC1 No : TPN-112-C-0001
Weld Categories P – Shop Weld F – Field Weld O - Offshore Weld R1 – First Repair R2 – Second Repair RW – Re-Weld
Completed By Witnessed By Approved BY Notes:
Company & Function PT. EFK PEPC Reg. 4 PEPC Reg. 4 PF-0003-B013-3" (INLET)
Signature
Part of Weld Number Joint No. Dia ( ɸ) ( Inch ) Sch Welder Stamp Accepted Rejected Remarks
CW 01 3" 40 02 √
CW 02 3" 40 01 √
CW 03 4" 40 01 √
CW 04 4" 40 01 √
CW 05 3" 40 01 √
CW 5A 3" 40 01 √
CW 06 2" 40 02 √
PF-0003-B013-3" CW 07 3" 40 02 √
INLET CW 08 3" 40 01 √
CW 09 3" 40 01 √
CW 10 3" 40 07 √
CW 11 3" 40 01 √
CW 12 3" 40 03 √
CW 13 3" 40 03 √
CW 14 3" 40 01 √
CW 15 3/4" 80 01 √
Examined by, Witnessed & Reviewed by, Witnessed & Reviewed by, Approved by,
NDE Level II
Dadan Hamdani Rhexzy D.P Andy Tri. K
Date : 06 Maret 2022 Date : 01 Maret 2022 Date : 01 Maret 2022 Date : 01 Maret 2022
LIQUID PENETRANT EXAMINATION REPORT
Client : PT.PERTAMINA EP CEPU ZONA 11 Report No. : 002/PT-RUP/ELNS/III/22
Project : PEMBANGUNAN SP TAPEN Date : 01 Maret 2022
Location : SP TAPEN Sheet : 2 of 3
Part of Weld Number Joint No. Dia ( ɸ) ( Inch ) Sch Welder Stamp Accepted Rejected Remarks
CW 16 3/4" 80 03 √
CW 17 3/4" 80 01 √
CW 18 1-1/2" 80 01 √
CW 19 1-1/2" 80 03 √
CW 20 1-1/2" 80 03 √
PF-0003-B013-3"
INLET
Examined by, Witnessed & Reviewed by, Witnessed & Reviewed by, Approved by,
NDE Level II
Dadan Hamdani Rhexzy D.P Andy Tri. K
Date : 01 Maret 2022 Date : 01 Maret 2022 Date : 01 Maret 2022 Date : 01 Maret 2022
Sheet : 3 of 3
Reference Document:
1. Piping Spesification Procedure
2. MC-1
Notes:
1 Check that the Construction Joint Integrity and/or Flange Check List Register is OK
complete, where applicable, and that all pipework has been installed/re-instated and
flushing and hydrostatic testing has been satisfactorily completed and recorded.
2 Check that the flange alignment is correct and that the correct bolts and gaskets are OK
installed at all mechanical joints to the correct torque setting and that the bolts have
been lubricated. For joints requiring bolt tensioning, that this has been carried out to
the correct Bolt Tensioning Procedure and the results recorded accordingly.
3 Visually check that pipe compound on screwed connections is to specifications. OK
(Note that the use of PTFE tape on screwed connections on Hydrocarbon service is
NOT permitted unless specifically stated in the installation procedure and agreed by
PHE WMO)
4 Check that all vents and drains are correctly installed. OK
5 Check that all temporary vents and drains have been removed and seal welded where OK
applicable.
6 Check that all process blinds and spacers have been correctly installed as indicated on OK
the P&ID.
7 Check that all the spectacle blinds are in the correct position. OK
8 Check that all pipe cleaning and pickling has been satisfactorily completed and OK
recorded.
9 Check that all temporary pipe spools have been removed and all control valves and OK
internals have been re-instated in the correct flow position.
10 Check that all Non Return Valve internals have been re-instated, and the valve has OK
been installed in the correct flow direction, and any ‘jack open’ devices have been
removed. Ensure the valve is functioning properly and that the spindles are
lubricated.
11 Check that all relief valves and Bursting Discs have been correctly installed. OK
12 Check that all gauges have been correctly installed. OK
13 Check that all pump suction strainers have been correctly installed. OK
14 Check that all chain wheels and extended spindles to specified valves have been OK
installed.
15 Check that all locking devices and interlocks to valves are installed. OK
16 Check that all pipes, including supports, have been installed as per design. OK
17 Upon completion of the above and where appropriate, the Joint Integrity Procedure OK
and/or or Flange Check List Register and conformation that all the appropriate joints
have been tagged and the relevant tag I.D. is detailed on the appropriate drawings.
Notes:
Remark:
This is to certify that all painting as defined above has been completed in accordance with paint specification