Republic of the Philippines

Department of Public Works


Transportation and
TABLE OF Communications OFFICE OF THE
BUILDING OFFICIAL
CONTENTS RECOMMENDING APPROVAL:

_____________________
C7 ARCHITECTURAL PLANS _____________ BUILDING OFFICIAL
DATE
WASHER 1 PERSPECTIVE
T&B ROOM
SITE DEVELOPMENT PLAN
01 A-1 2 APPROVED BY:
3 LOCATION MAP

GROUND FLOOR PLAN _____________________


4
_____________ BUILDING OFFICIAL
DATE
02 A-1 5 SECOND FLOOR PLAN LAND USE AND ZONING
6 FRONT ELEVATION PLAN
KITCHEN
7 REAR ELEVATION PLAN
C5 8 LEFT ELEVATION PLAN
C6 9 RIGHT ELEVATION PLAN _____________________________
03 A-1
10 CROSS-SECTION PLAN
11 LONGITUDINAL SECTION PLAN
12 GROUND FLOOR REFLECTED CEILING
PLAN

C4
T&B
DINING AREA
04 A-1

13 GROUND FLOOR REFLECTED CEILING


PLAN
LINEANDGRADE
GROUND FLOOR TILE FINISHES
C2
14
15 SECOND FLOOR TILE FINISHES

16 TILE SHEDULE

17 ROOF PLAN _____________________________


C3 05 A-1 18 SCHEDULE OF DOORS AND WINDOWS

LIVING AREA
BEDROOM 1
STRUCTURAL PLANS ARCHITECTURAL
01 S-2 1 GENERAL NOTES AND
SPECIFICATIONS
2 FOUNDATION LAYOUT PLAN

3 BEAM AND SLAB LAYOUT PLAN


S-2
4 SECOND FLOOR FRAMING PLAN
_____________________________
02 5 ROOF BEAM FRAMING PLAN
6 COLUMN AND FOOTING DETAILS
03 S-2
7 COLUMN DETAILS STRUCTURAL/CIVIL
8 FOOTING DETAILS
9 DETAIL OF WALL FOOTING
10 LONGITUDINAL BEAM AND TO COLUMN
CONNECTION DETAILS

04 S-2
11 BEAM SCHEDULE _____________________________
12 SLAB DETAILS
13 ROOF TRUSS DETAILS
C1 14 DETAILS OF STAIR RAILINGS
15 STAIR DETAILS
PORCH

SANITARY

05 S-2
_____________________________

OWNER: PROJECT TITLE: CHECKED AND VERIFIED BY: REVISIONS:

TALISIC, VIOS, ACERA


TriBuild Corporation YEAR: THIRD YEAR DATE SUBMITTED: 04 - 12 - 2024
PROPOSED ONE STOREY RESIDENTIAL
BUILDING
ENGR. LORRIZZA S. ZAFRA
INSTRUCTOR

SECTION: BSCE_3T
16 DETAILS OF BALCONY RAILINGS

06 S-2 17 FLOOR REBAR

18 FLOOR SLAB

07 S-2 19 ROOF FRAMING


S
20 PURLINS CONNECTION DETAILS

ELECTRICAL PLANS
PLUMBING

GENERAL NOTES AND


01 E-3 1 SPECIFICATIONS

_____________________________
2 FIRST FLOOR LIGHTING LAYOUT

3 SECOND FLOOR LIGHTING LAYOUT


02 E-3
4 FIRST FLOOR OUTLET LAYOUT
ELECTRICAL
5 SECOND FLOOR OUTLET LAYOUT

03 E-3 6 RISER DIAGRAM

04 E-3 7 SOAK-AWAY PIT PLAN

A B C D 8 SEPTIC TANK PLAN


_____________________________

10000
3875 2050 4075

7000 2522,66
SIDE SETBACK
1 1

MECHANICAL
5075

5075
2 _____________________________
2
2850
12925

15000
PLUMBING PLANS
5000

9925 FIREDEPARTMENT

GENERAL NOTES AND


01 P-4 1
3 3
SPECIFICATIONS

_____________________________
2075

4 4 TECHNICAL DESCRIPTION 02 P-4 2


3
GROUND WATER SUPPLY LAYOUT
SECOND WATER SUPPLY LAYOUT
2090

4 GROUND SANITARY LINE LAYOUT


ELECTRONICS
5 5
LINES BEARINGS DISTANCE 5 SECOND SANITARY LINE LAYOUT

1-2 S 33° 20' E 18.00 Mtrs 6


7
WATER SUPPLY ISOMETRIC VIEW
WATER SANITARY LINE ISOMETRIC
VIEW
_____________________________
2-3 S 56° 40' W 25.00 Mtrs
4737,99

3875 2045 4080


10000
FRONT SETBACK
3-4 N 33° 20' W 18.00 Mtrs
A B C D 4-1 N 56° 40' E 25.00 Mtrs
7000

ROADS
GEODETIC

_____________________________

S
H
E
E
T
N

OWNER: PROJECT TITLE: CHECKED AND VERIFIED BY: REVISIONS:

TALISIC, VIOS, ACERA


TriBuild Corporation YEAR: THIRD YEAR DATE SUBMITTED: 04 - 12 - 2024
PROPOSED ONE STOREY RESIDENTIAL
BUILDING
ENGR. LORRIZZA S. ZAFRA
INSTRUCTOR

SECTION: BSCE_3T
A B C D

10000
3875 2050 4075

1 1
W-3 W-2 W-2

D-2

WASHER
T & B ROOM

D-2
MASTER

5075

5075
BED ROOM
W-1

KITCHEN W-2

2 2
D-2

12925

2850
T & B
W-2 D INING AREA

15000
W-1
D-2

9925
LIVING AREA

5000
BED ROOM 1

3 W-1 3

2090 2075
4 4
D-1
W-1

P ORCH

5 5
P ORCH

3875 2045 4080


10000

A B C D

FLOOR PLAN

OWNER: PROJECT TITLE: CHECKED AND VERIFIED BY: REVISIONS:

TALISIC, VIOS, ACERA


TriBuild Corporation YEAR: THIRD YEAR DATE SUBMITTED: 04 - 12 - 2024
PROPOSED ONE STOREY RESIDENTIAL
BUILDING
ENGR. LORRIZZA S. ZAFRA
INSTRUCTOR

SECTION: BSCE_3T O
.

A B C D A B C D

1700
1700

300
300

TOP OF ROOF BEAM TOP OF ROOF BEAM D2 W2 W2


W3
W1 D1 W1

2700
2700

GROUND FLOOR FINISH LEVEL


GROUND FLOOR FINISH LEVEL

NGL

180
NGL
180

A B C D
A B C D

FRONT REAR
A-1
01

S
H
E
E
T

OWNER: PROJECT TITLE: CHECKED AND VERIFIED BY: REVISIONS:

TALISIC, VIOS, ACERA


TriBuild Corporation YEAR: THIRD YEAR DATE SUBMITTED: 04 - 12 - 2024
PROPOSED ONE STOREY RESIDENTIAL
BUILDING
ENGR. LORRIZZA S. ZAFRA
INSTRUCTOR

SECTION: BSCE_3T
N
O
.

A-
1
02

3
4

1
5
3

4
2
1

1700
300
1700

TOP OF ROOF BEAM W2


W1
TOP OF ROOF BEAM
300

W2

2700
W1 W3
2700

GROUND FLOOR FINISH LEVEL


GROUND FLOOR FINISH LEVEL
NGL

180
NGL
180

3
2
1

5
4

1
5

4
8 LEFT ELEVATION 9 RIGHT ELEVATION
SCALE 1:100 METERS SCALE 1:100 METERS
A-1 A-1

OWNER: PROJECT TITLE: CHECKED AND VERIFIED BY: REVISIONS:

TALISIC, VIOS, ACERA


TriBuild Corporation YEAR: THIRD YEAR DATE SUBMITTED: 04 - 12 - 2024
PROPOSED ONE STOREY RESIDENTIAL
BUILDING
ENGR. LORRIZZA S. ZAFRA
INSTRUCTOR

SECTION: BSCE_3T
A B C D
1 2 3 4 5
1700
300

1700
TOP OF ROOF BEAM
BEDROOM
TOP OF ROOF BEAM

300
2700

LIVING ROOM

2700
COMFORT KITCHEN DINING AREA
COMFORT ROOM
LIVING AREA

ROOM

GROUND FLOOR FINISH LEVEL


GROUND FLOOR FINISH LEVEL

NGL NGL
180

180
A B C D

1 2 3 4 5

S
H
E
E
T

SECTIONS
OWNER: PROJECT TITLE: CHECKED AND VERIFIED BY: REVISIONS:

TALISIC, VIOS, ACERA


TriBuild Corporation YEAR: THIRD YEAR DATE SUBMITTED: 04 - 12 - 2024
PROPOSED ONE STOREY RESIDENTIAL
BUILDING
ENGR. LORRIZZA S. ZAFRA
INSTRUCTOR

SECTION: BSCE_3T
N
O
.

A-1
03
MARBLE
TILES

A B C D

10000
3875 2050 4075

1 1
FF1
FF3 GRANITE
TILES

5075

5075
MARBLE
TILES

2 2

2850
12925

15000
5000

9925
3 3
2075
4 4
2090

5 5
FF2
WOODEN
TILES

3875 2045 4080


10000

A B C D

FLOOR FINISHING PLAN


OWNER: PROJECT TITLE: CHECKED AND VERIFIED BY: REVISIONS:

TALISIC, VIOS, ACERA


TriBuild Corporation YEAR: THIRD YEAR DATE SUBMITTED: 04 - 12 - 2024
PROPOSED ONE STOREY RESIDENTIAL
BUILDING
ENGR. LORRIZZA S. ZAFRA
INSTRUCTOR

SECTION: BSCE_3T
S
H
E
E
T
N
O
.

A-1
04

OWNER: PROJECT TITLE: CHECKED AND VERIFIED BY: REVISIONS:

TALISIC, VIOS, ACERA


TriBuild Corporation YEAR: THIRD YEAR DATE SUBMITTED: 04 - 12 - 2024
PROPOSED ONE STOREY RESIDENTIAL
BUILDING
ENGR. LORRIZZA S. ZAFRA
INSTRUCTOR

SECTION: BSCE_3T
OWNER: PROJECT TITLE: CHECKED AND VERIFIED BY: REVISIONS:

TALISIC, VIOS, ACERA


TriBuild Corporation YEAR: THIRD YEAR DATE SUBMITTED: 04 - 12 - 2024
PROPOSED ONE STOREY RESIDENTIAL
BUILDING
ENGR. LORRIZZA S. ZAFRA
INSTRUCTOR

SECTION: BSCE_3T
1800 850 850 1800
635 900

2250

1118
2150
2100

1118
610
MARK # OF SETS TYPE DIMENSION MATERIALS MARK # OF SETS TYPE DIMENSION MATERIALS

W1
D1
1-SET FRENCH DOOR 1800 × 2100 WOOD & GLASS 4-SETS 4-PANEL FIXED WINDOW 1800 × 2015 FIBER GLASS
D2 W2
4-SETS GENERIC DOOR 850 × 2250 WOOD 4-SETS AWNING WINDOW 635 x 610 VINYL
D3 W3
2-SETS PVC DOORS 850 × 2150 PVC 1-SETS SINGLE HUNG 900 x 2015 FIBER GLASS

S
H
E
E
T
N
O
.

A-1
05
19 SCHEDULE OF DOORS AND WINDOWS METERS
SCALE 1:50
A-1

OWNER: PROJECT TITLE: CHECKED AND VERIFIED BY: REVISIONS:

TALISIC, VIOS, ACERA


TriBuild Corporation YEAR: THIRD YEAR DATE SUBMITTED: 04 - 12 - 2024
PROPOSED ONE STOREY RESIDENTIAL
BUILDING
ENGR. LORRIZZA S. ZAFRA
INSTRUCTOR

SECTION: BSCE_3T
OWNER: PROJECT TITLE: CHECKED AND VERIFIED BY: REVISIONS:

TALISIC, VIOS, ACERA


TriBuild Corporation YEAR: THIRD YEAR DATE SUBMITTED: 04 - 12 - 2024
PROPOSED ONE STOREY RESIDENTIAL
BUILDING
ENGR. LORRIZZA S. ZAFRA
INSTRUCTOR

SECTION: BSCE_3T
S
H
E
E
T

N
O
.

S-2
01

S
H
E
E
T
N
O
.

S-
2
02

OWNER: PROJECT TITLE: CHECKED AND VERIFIED BY: REVISIONS:

TALISIC, VIOS, ACERA


TriBuild Corporation YEAR: THIRD YEAR DATE SUBMITTED: 04 - 12 - 2024
PROPOSED ONE STOREY RESIDENTIAL
BUILDING
ENGR. LORRIZZA S. ZAFRA
INSTRUCTOR

SECTION: BSCE_3T
75 mm, clr.
NAT. GROUND LINE
L
FOOTING TIE BEAM
NAT. GRADE LINE

REBARS
1500

W
300

COLUMN

200mm THICK
GRAVEL BASE

SCHEDULE OF FOOTINGS
DIMENSION DEPTH REINFORCING BARS 7 COLUMN DETAILS
SCALE 1:50 METERS
MARK FROM REMARKS S-2
WIDTH LENGTH THICKNESS PARALLEL TO PARALLEL TO
(W) (L) (t) N.G.L. (D) WIDTH (BAR W) LENGTH (BAR L)

SQUARE
F-1 1200 1200 300 1500 mm 8 - 16 mm Ø 8 - 16 mm Ø
FOOTING

OWNER: PROJECT TITLE: CHECKED AND VERIFIED BY: REVISIONS:

TALISIC, VIOS, ACERA


TriBuild Corporation YEAR: THIRD YEAR DATE SUBMITTED: 04 - 12 - 2024
PROPOSED ONE STOREY RESIDENTIAL
BUILDING
ENGR. LORRIZZA S. ZAFRA
INSTRUCTOR

SECTION: BSCE_3T
10 mm Ø HORT. BARS

9-16mm Ø BED BARS SPACED EQUALLY


BOTHWAYS
4-16mm Ø VERTICAL BARS 16mm Ø BAR
4-16mm Ø VERTICAL BARS

20mm Ø BAR

NATURAL GRADE LINE


20mm Ø BAR
225
425
200

300

FC
9 DETAIL OF WALL FOOTING
SCALE 1:50 METERS
S-2

SH EETN O.

OWNER: PROJECT TITLE: CHECKED AND VERIFIED BY: REVISIONS:

TALISIC, VIOS, ACERA


TriBuild Corporation YEAR: THIRD YEAR DATE SUBMITTED: 04 - 12 - 2024
PROPOSED ONE STOREY RESIDENTIAL
BUILDING
ENGR. LORRIZZA S. ZAFRA
INSTRUCTOR

SECTION: BSCE_3T
S-2
03

SH EETN O.
B D E
L
L/4 L/4 S-2
SH EETN O.
(h=DEPTH OF BEAM)

S-2
05
h

12MM DIA TOP AND


BOTTOM BAR
L/5 L/5

AT SUPPORT AT MID SPAN AT SUPPORT AT SUPPORT AT MID SPAN AT SUPPORT

B D

10 MMØ STIRRUPS SP. @ 2


@ 50mm, 3 @ 100mm, 3
@ 150mm, REST @ 200mm
h
(h=DEPTH OF BEAM)

0.30 0.30 0.30

0.250 0.250 0.250

BEAM DETAILS
OWNER: PROJECT TITLE: CHECKED AND VERIFIED BY: REVISIONS:

TALISIC, VIOS, ACERA


TriBuild Corporation YEAR: THIRD YEAR DATE SUBMITTED: 04 - 12 - 2024
PROPOSED ONE STOREY RESIDENTIAL
BUILDING
ENGR. LORRIZZA S. ZAFRA
INSTRUCTOR

SECTION: BSCE_3T
OWNER: PROJECT TITLE: CHECKED AND VERIFIED BY: REVISIONS:

TALISIC, VIOS, ACERA


TriBuild Corporation YEAR: THIRD YEAR DATE SUBMITTED: 04 - 12 - 2024
PROPOSED ONE STOREY RESIDENTIAL
BUILDING
ENGR. LORRIZZA S. ZAFRA
INSTRUCTOR

SECTION: BSCE_3T
SHEETNO.

S-2
06
A B C D

1 1
RB1 RB1

RB1

RB1
5075

5075
RB1
ELEVATION
2 2
RB1 RB1
2850
12925

15000
RB1

RB1
5000

9925
3
RB1
3
2075

4
RB1 4
2090

5 5

SHEETNO.

3875 2045 4080


10000 S-2
07
A B C D
20 PURLINS CONN. DET.
SCALE 1:10 METERS
S-2

19 ROOF FRAMING
SCALE 1:4 METERS
S-2
OWNER: PROJECT TITLE: CHECKED AND VERIFIED BY: REVISIONS:

TALISIC, VIOS, ACERA


TriBuild Corporation YEAR: THIRD YEAR DATE SUBMITTED: 04 - 12 - 2024
PROPOSED ONE STOREY RESIDENTIAL
BUILDING
ENGR. LORRIZZA S. ZAFRA
INSTRUCTOR

SECTION: BSCE_3T
SPECIFICATIONS:
1. ALL ELECTRICAL INSTALLATIONS HEREIN AND OTHER RELATED WORKS
TO BE DONE IN THIS BUILDING SHALL BE IN ACCORDANCE WITH THE
PROVIONS AND STANDARDDS OF THE FOLLOWING:
1.1 THE LATEST EDITIOB OF THE PHILIPPINES ELECTRICAL
CODE
1.2 REPUBLIC ACT 7926 OTHERWISE KNOWN AS THE NEW
ELECTRICAL ENGINEERING LAW

2.
1.3 THE NATIONAL BUILDING CODE OF THE PHILIPPINES
ALL ELECTRICAL INSTALLATIONS HEREIN SHALL BE DONE UNDER THE
DIRECT SUPERVISION OF A DULY REGISTERED ELECTRICAL ENGINEER.
ELECTRICAL SYMBOLS
HE SHALL BE RESPONSIBLE IN THE INTERPRETATION OF THE PLANS AND SYMBOL DESCRIPTION SYMBOL DESCRIPTION
SPECIFICATIONS AND THE REQUIRED STANDARDS OF THE ELECTRICAL
CODE. CIRCUIT LINE RUN INSIDE WALL
3. MATERIALS AND EQUIPMENT TO BE USED SHALL HAVE INSPECTED r2
2 GANG RANGE OUTLET OR UNDER FLOOR
COMMODITY CLEARANCE (ICC) LABEL FOR FOREIGN MADE PRODUCTS
AND P.S MARK FOR LOCAL IN NATURE OF BUREAU OF PRODUCT STANDARD CIRCUIT LINE RUN INSIDE
2 GANG CONVENEINCE
(BPS) WALL OR OVER CEILING
CO2 OUTLET
4. ALL PANEL BOARDS, MAIN DISTRIBUTION PANELS, ETC., SHALL HAVE
GROUNDING BUS FOR BRANCH CIRCUITS AND SUB FEEDER GROUNDING 3 GANG CONVENEINCE
OUTLET SWITCH LINE
SYSTEM SHALL BE BONDED TO THE NEAREST METAL WATER PIPE. CO3

5. MOUNTING HEIGHT FOR ALL WIRING DEVICES AND PANEL BOARDS SHALL
BE. WP
SERVICE ENTRANCE
5.1 LIGHTING OUTLETS 1.40M ABOVE FLOOR FINISH WEATHER PROOF OUTLET
5.2 CONVENIENCE OUTLETS 0.30M ABOVE FLOOR CKT
1
FINISH
REFRIGERATOR OUTLET CIRCUIT HOMERUN
5.3 TELEPHONE OUTLETS 0.30M ABOVE FLOOR FINISH REF2

5.4 PANEL BOARDS AND CABINETS 1.40M ABOVE FLOOR


FINISH 6. WIRING METHODS SHALL BE AS FOLLOWS: CEILING LIGHT S1 SINGLE GANG SWITCH
6.1 SERVICE ENTRANCE RESISTS INTERMEDIATE
METALLIC METER BOARD / KILO
WATT HOUR S2 DOUBLE GANG SWITCH
CONDUIT (IMC) M
6.2 LIGHTING AND POWER SYSTEM POLYVINYL CHLORIDE
(PVC) S3
6.3 TELEPHONE OUTLETS POLYVINYL CHLORIDE (PVC) LOAD PANEL THREE GANG SWITCH
6.4 ALL VIBRATING EQUIPMENTS LIQUID TIGHT FLEXIBLE
METAL CONDUIT

OWNER: PROJECT TITLE: CHECKED AND VERIFIED BY: REVISIONS:

TALISIC, VIOS, ACERA


TriBuild Corporation YEAR: THIRD YEAR DATE SUBMITTED: 04 - 12 - 2024
PROPOSED ONE STOREY RESIDENTIAL
BUILDING
ENGR. LORRIZZA S. ZAFRA
INSTRUCTOR

SECTION: BSCE_3T
7. NO CHANGES OR MODIFICATION SHALL BE MADE WITHOUT THE
DESIGNERS WRITTEN CONSENT
8. ALL WORKS SHALL BE EXECUTED IN A WORKMANSHIP MANNER AND
SHALL PREVENT A NEAT AND ORDERLY ACCEPTANCE. ALL WIRING SHALL
BE CONCEALED IN THE LEAST POSSIBLE WAY.

1 GENERAL SPECIFICATIONS AND NOTES


CT TITLE:
S-2
P
R
O
P
O
S
E
D
T
W
O
S
T
O HEETN
R
E
Y E-3
R
E 01
S

OWNER: PROJECT TITLE: CHECKED AND VERIFIED BY: REVISIONS:

TALISIC, VIOS, ACERA


TriBuild Corporation YEAR: THIRD YEAR DATE SUBMITTED: 04 - 12 - 2024
PROPOSED ONE STOREY RESIDENTIAL
BUILDING
ENGR. LORRIZZA S. ZAFRA
INSTRUCTOR

SECTION: BSCE_3T
CKT 1

CKT 2
KWHM
SOURCE M PB CKT 3

SINGLE LINE DIAGRAM


CKT 4
GROUND AND 2ND FLOOR
SPARE

OWNER: PROJECT TITLE: CHECKED AND VERIFIED BY: REVISIONS:

TALISIC, VIOS, ACERA


TriBuild Corporation YEAR: THIRD YEAR DATE SUBMITTED: 04 - 12 - 2024
PROPOSED ONE STOREY RESIDENTIAL
BUILDING
ENGR. LORRIZZA S. ZAFRA
INSTRUCTOR

SECTION: BSCE_3T
3875 2050 4075

WASHER
T&B ROOM

MASTER

5075

5075
BEDROOM
C7

KITCHEN

C6
C5

LEGENDS

C4

12925

2850
SYMBOL DESCRIPTION
T&B
DINING AREA
PIN LIGHT CEILING LIGHT

15000
C3 WARM LIGHT
9 WATTS SL

DROP LIGHTING

9925
LIVING AREA

5000
SWITCH
BEDROOM 1

2075

C2

C1
2090

PORCH

PORCH

3875 2045 4080


10000

OWNER: PROJECT TITLE: CHECKED AND VERIFIED BY: REVISIONS:

TALISIC, VIOS, ACERA


TriBuild Corporation YEAR: THIRD YEAR DATE SUBMITTED: 04 - 12 - 2024
PROPOSED ONE STOREY RESIDENTIAL
BUILDING
ENGR. LORRIZZA S. ZAFRA
INSTRUCTOR

SECTION: BSCE_3T
CIRCUIT LOAD SIZE OF WIRE VOLTAGE WATTS AMPERE CIRCUIT SIZE OF WIRE
NO. DESCRIPTION LOAD BREAKER
PROTECTION

SWITCHES LO CO AU POLE AT
1 LIGHTING OUTLET 1 6 230 600 2.61 2P 15A 2-2.00MM2 THHN STRANDED COPPER WIRE, 15MM FCP
2 LIGHTING OUTLET 1 9 230 900 3.91 2P 15A 2-2.00MM2 THHN STRANDED COPPER WIRE, 15MM FCP
3 LIGHTING OUTLET 1 8 230 800 3.48 2P 15A 2-2.00MM2 THHN STRANDED COPPER WIRE, 15MM FCP
4 LIGHTING OUTLET 1 2 230 200 0.87 2P 15A 2-2.00MM2 THHN STRANDED COPPER WIRE, 15MM FCP
5 LIGHTING OUTLET 1 9 230 900 3.91 2P 15A 2-2.00MM2 THHN STRANDED COPPER WIRE, 15MM FCP
6 LIGHTING OUTLET 1 6 230 600 2.61 2P 15A 2-2.00MM2 THHN STRANDED COPPER WIRE, 15MM FCP
7 LIGHTING OUTLET 1 2 230 200 0.87 2P 15A 2-2.00MM2 THHN STRANDED COPPER WIRE, 15MM FCP
8 CONVENIENCE OUTLET 3 230 600 2.61 2P 20A 2-2.00MM2 THHN STRANDED COPPER WIRE, 15MM FCP
9 CONVENIENCE OUTLET 6 230 1200 5.22 2P 20A 2-2.00MM2 THHN STRANDED COPPER WIRE, 15MM FCP
10 CONVENIENCE OUTLET 4 230 1080 4.69 2P 20A 2-2.00MM2 THHN STRANDED COPPER WIRE, 15MM FCP
11 CONVENIENCE OUTLET 2 230 1260 5.48 2P 20A 2-2.00MM2 THHN STRANDED COPPER WIRE, 15MM FCP
12 CONVENIENCE OUTLET 3 230 540 2.35 2P 20A 2-2.00MM2 THHN STRANDED COPPER WIRE, 15MM FCP
13 CONVENIENCE OUTLET 4 230 540 2.35 2P 20A 2-2.00MM2 THHN STRANDED COPPER WIRE, 15MM FCP
14 CONVENIENCE OUTLET 3 230 1080 4.70 2P 20A 2-2.00MM2 THHN STRANDED COPPER WIRE, 15MM FCP
RANGE 1 230 3500 15.22 2P 30A 2-2.00MM2 THHN STRANDED COPPER WIRE, 15MM FCP
5 HP, ACU 1 230 3729 16.21 2P 40A 2-2.00MM2 THHN STRANDED COPPER WIRE, 15MM FCP
5 HP, ACU 1 230 3729 16.21 2P 40A 2-2.00MM2 THHN STRANDED COPPER WIRE, 15MM FCP
TOTAL 21458 93.3

COMPUTATION
A. SIZE OF MAIN FEEDER B. SIZE OF MAIN PROTECTION
=(IT + 25% OF HIGHEST MOTOR LOAD)xDF =(IT + 25% OF HIGHEST MOTOR LOAD)xDF
=(93.3 + (0.25x16.21)x0.80 =(93.3-16.21) + (2.5 x 16.21) + 0.80
=96.542 =118.415
USE: 2-22MM2 THW, STRANDED COPPER
WIRE, 1-2MM2 THW, GROUNDWIRE

OWNER: PROJECT TITLE: CHECKED AND VERIFIED BY: REVISIONS:

TALISIC, VIOS, ACERA


TriBuild Corporation YEAR: THIRD YEAR DATE SUBMITTED: 04 - 12 - 2024
PROPOSED ONE STOREY RESIDENTIAL
BUILDING
ENGR. LORRIZZA S. ZAFRA
INSTRUCTOR

SECTION: BSCE_3T
HEETN

E-3
02
OWNER: PROJECT TITLE: CHECKED AND VERIFIED BY: REVISIONS:

TALISIC, VIOS, ACERA


TriBuild Corporation YEAR: THIRD YEAR DATE SUBMITTED: 04 - 12 - 2024
PROPOSED ONE STOREY RESIDENTIAL
BUILDING
ENGR. LORRIZZA S. ZAFRA
INSTRUCTOR

SECTION: BSCE_3T
22358.71

C.O. C.O. C.O. C.O.


OUTLET

7989.33
MH MH MH

OWNER: PROJECT TITLE: CHECKED AND VERIFIED BY: REVISIONS:

TALISIC, VIOS, ACERA


TriBuild Corporation YEAR: THIRD YEAR DATE SUBMITTED: 04 - 12 - 2024
PROPOSED ONE STOREY RESIDENTIAL
BUILDING
ENGR. LORRIZZA S. ZAFRA
INSTRUCTOR

SECTION: BSCE_3T
HEETN

E-3
S
H
E
E
T
N
O
.

E-3
04
PLUMBING NOTES

1. ALL WORK SHALL COMPLY WITH THE CITY OF CHICAGO BUILDING CODES AND
THE ILLINOIS PLUMBING CODE 2014.

2. PLUMBING CONTRACTOR SHALL COORDINATE HIS WORK WITH ALL OTHER


CONTRACTORS INVOLVED IN THE PROJECT.

3. PLUMBING BIDDERS SHALL VISIT THE JOB SITE TO LOCATE WATER AND
SANITARY PIPING TIE-IN POINTS.

4. INSULATION:
A. SEE INSULATION SPECIFICATION SECTION IN THE PROJECT MANUAL OR ON THE
DRAWINGS FOR INSULATION THICKNESS AND REQUIREMENTS.
B. HANDICAPPED SINK AND LAVATORY WASTE PIPING AND WATER SUPPLY PIPING
SHALL BE INSULATED TO COMPLY WITH THE ILLINOIS ACCESSIBILITY CODE AND THE
AMERICANS WITH DISABILITIES ACT USING PREFABRICATED INSULATION.

5. PLUMBING FIXTURES, EQUIPMENT AND DRAINS:


A. FURNISH AND INSTALL PLUMBING FIXTURES AND DRAINS SCHEDULED GENERAL PLUMBING NOTES
COMPLETE WITH APPROPRIATE TRAPS, CARRIERS, WASTE FITTINGS, AND LOCAL
1. THE CONTRACTOR SHALL FURNISH AND INSTALL THE PLUMBING SYSTEMS COMPLETE WITH ALL EQUIPMENT,
STOPS. B. MANUFACTURERS LISTED ARE AN INDICATION OF THE QUALITY PIPING, VALVES, INSULATION, CONTROLS HANGERS, TRIM,
EXPECTED. EQUIVALENT PRODUCTS FROM OTHER MANUFACTURERS MAY BE ACCESSORIES AND ASSOCIATED WORK, IN ACCORDANCE WITH THE BUILDING CODE, ALL AUTHORITIES
SUBMITTED FOR REVIEW. HAVING JURISDICTION, AND THIS SPECIFICATION.
2. THE WORK SHALL INCLUDE ALL LABOR, MATERIALS, EQUIPMENT, HOISTING AND RIGGING, SCAFFOLDING,
LOADING AND UNLOADING, CLEAN
6. PLUMBING DOMESTIC WATER SYSTEM AND SANITARY SYSTEM SHALL NOT -UP OF DEBRIS AND OTHER SERVICES, TO PROVIDE THE OWNER WITH FULLY OPERATIONAL SYSTEMS.
HAVE DEAD ENDS. 3. ALL WORK SHALL BE PROPERLY COORDINATED WITH THE WORK OF OTHER TRADES TO AVOID CONFLICTS.
A. DOMESTIC WATER SYSTEM SHALL COMPLY WITH 890-1200C. REFER TO THE ARCHITECTURAL AND STRUCTURAL DRAWINGS ONLY
B. SANITARY SYSTEM SHALL COMPLY WITH 890-1320D. FOR INFORMATION REGARDING CEILING ELEVATIONS, SPACE CLEARANCES, WALL AND PARTITION
LOCATIONS ETC., USED TO PREPARE COORDINATED DRAWINGS.
4. BIDDERS, PRIOR TO SUBMITTING PROPOSALS, SHALL VISIT THE SITE AND FULLY EXAMINE THE AREAS
7. THE VERTICAL DEFLECTION OF PVC PIPE SHALL NOT EXCEED 5%. NO DEFLECTION INVOLVED WITH THIS WORK, TO FAMILIARIZE THEMSELVES WITH THE EXACT
IS CONDITIONS AND DIFFICULTIES THAT MAY ATTEND THE EXECUTION OF THIS WORK. SUBMISSION OF A
PROPOSAL WILL BE CONSTRUED AS EVIDENCE THAT SUCH AN
PERMITTED FOR IRON PIP EXAMINATION HAS BEEN MADE, AND LATER CLAIMS WILL NOT BE RECOGNIZED, FOR EXTRA LABOR,
MATERIALS AND EQUIPMENT, REQUIRED BECAUSE OF ADDITIONAL

OWNER: PROJECT TITLE: CHECKED AND VERIFIED BY: REVISIONS:

TALISIC, VIOS, ACERA


TriBuild Corporation YEAR: THIRD YEAR DATE SUBMITTED: 04 - 12 - 2024
PROPOSED ONE STOREY RESIDENTIAL
BUILDING
ENGR. LORRIZZA S. ZAFRA
INSTRUCTOR

SECTION: BSCE_3T
DIFFICULTIES ENCOUNTERED, WHICH COULD HAVE BEEN FORESEEN HAD SUCH AN EXAMINATION 11. CARBONATED BEVERAGE DISPENSER SHALL HAVE AN ASSE 1022 OR ASSE 1032 (WITH DEVICE IN LINE AND THE
BEEN MADE. DOUBLE CHECK DEVICE SHALL BE CONSTRUCTED OF STAINLESS STEEL MATERIALS. SECTION 890.1130 (F).
5. ALL MATERIALS AND WORKMANSHIP SHALL BE GUARANTEED FOR A PERIOD OF ONE YEAR FROM 12. DEAD ENDS SHALL BE AVOIDED IN DRAINAGE SYSTEM, EXCEPT WHERE NECESSARY TO EXTEND THE SYSTEM
DATE OF TO INSTALL A CLEANOUT IN AN ACCESSIBLE LOCATION. THE DEAD
FINAL ACCEPTANCE OF THIS WORK. ENGAGE THE SERVICES OF VARIOUS ENDS INTENDED FOR FUTURE CONNECTION OR CREATED BY REMOVAL OR ABANDONMENT OF PIPE; WHICH IS
MANUFACTURER'S SUPPLYING THE EQUIPMENT FOR THE PROPER START-UP MORE THAN TWO (2'
ADJUSTMENT AND OPERATION OF THE EQUIPMENT, AND INSTRUCT THE OWNER'S PERSONNEL IN THE -0") FEET ABOVE A FLOOR OR MORE THAN TEN (10) FEET HORIZONTALLY FROM THE NEAREST VENTED
PROPER OPERATION AND MAINTENANCE OF THE PLUMBING SYSTEMS. CONNECTION MUST HAVE A VENTED CONNECTION TO THE OUTSIDE ATMOSPHERE. SECTION
6. PROVIDE SPARE PARTS: SPARE PARTS SHALL BE PROVIDED PER SPECIFICATION OR NO LESS THAN 5% 890.1320
OF INSTALLED AMOUNT OR ONE OF EACH. 13. WATER DISTRIBUTION PIPE THAT HAS BEEN TERMINATED OR IS AN UNUSED SEGMENT SHALL HAVE NO DEAD
7. THIS CONTRACTOR SHALL SECURE ALL REQUIRED PERMITS AND APPROVALS AND TRANSMIT ENDS. NO SEGMENT OF PIPE WITH A DEVELOPED LENGTH OF MORE THAN TWO (2'-0") FEET SHALL BE
ORIGINALS TO PERMITTED. SECTION 890.1190 (C)
THE OWNER FOR RECORD. CONTRACTOR SHALL BE 14. IN LIEU OF AIR CHAMBERS PROVIDE WATER HAMMER ARRESTORS PER OSHAREQUIREMENTS
RESPONSIBLE FOR ALL FEES.
8. SUBMIT PDFS OF THE PLUMBING INSTALLATION SHOP DRAWINGS, CERTIFIED BY ALL TRADES THAT
COORDINATION HAS BEEN ESTABLISHED. SUBMIT PLUMBING FIXTURE CUTS
WITH TRIM, INSULATION, PIPE MATERIALS, FITTINGS, VALVES AND CERTIFIED EQUIPMENT CUTS
WITH CONSTRUCTION WIRING DIAGRAMS. SUBMIT PDFS OF OPERATING AND
1 GENERAL SPECIFICATIONS AND NOTES
SERVICE MANUALS WHICH SHALL INCLUDE COPIES OF ALL SHOP DRAWINGS, FIXTURE AND
EQUIPMENT CUTS, SERVICE INSTRUCTIONS.
P-4
9. CONVECTION OVENS AND STEAM EQUIPMENT SHALL HAVE THE APPROVED DUAL CHECK VALVE
ASSEMBLY INSTALLED ON THE WATER SUPPLY LINE. SECTION 890.1130 (F).
10. AN APPROVED REDUCED PRESSURE ZONE (RPZ) BACKFLOW PREVENTER DEVICE SHALL BE SHEETNO.
INSTALLED IN THE POTABLE WATER SUPPLY TO EACH LOCATION WHERE SANITIZING
CHEMICALS OR DETERGENTS WILL BE ASPIRATED OR PUSHED BY WATER PRESSURE
INTO P-4
CLEANSING/SANITIZING OPERATION. SPILL PROOF OR PRESSURE VACUUM BREAKERS ARE
PROHIBITED AS PER 2004 ILLINOIS PLUMBING CODE SECTION 890.1130 (F) AND IEPA. 01
S
H
E
E
T
N
O
.

OWNER: PROJECT TITLE: CHECKED AND VERIFIED BY: REVISIONS:

TALISIC, VIOS, ACERA


TriBuild Corporation YEAR: THIRD YEAR DATE SUBMITTED: 04 - 12 - 2024
PROPOSED ONE STOREY RESIDENTIAL
BUILDING
ENGR. LORRIZZA S. ZAFRA
INSTRUCTOR

SECTION: BSCE_3T
P-4
02

OWNER: PROJECT TITLE: CHECKED AND VERIFIED BY: REVISIONS:

TALISIC, VIOS, ACERA


TriBuild Corporation YEAR: THIRD YEAR DATE SUBMITTED: 04 - 12 - 2024
PROPOSED ONE STOREY RESIDENTIAL
BUILDING
ENGR. LORRIZZA S. ZAFRA
INSTRUCTOR

SECTION: BSCE_3T