Loop 1 Loop 2

Length Diamet Area Length Diameter


Pipe Pipe Area (m^2)
(m) er (m) (m^2) (m) (m)

AB 600 0.250 0.0491 BC 600 0.150 0.0177

BE 200 0.100 0.0079 CD 200 0.100 0.0079


EF 600 0.150 0.0177 DE 600 0.150 0.0177
FA 200 0.200 0.0314 EB 200 0.100 0.0079

Iteration 1
5
k/D λ K hL = kQ./Q/ hL/Q
Loop Pipe Q (l/s) Re ( x 10 )
AB 0.0002 120.00 5.36E+05 0.015815 802.843 11.56093938 96.34116
BE 0.0006 10.00 1.12E+05 0.02058 34009.5 3.400950079 340.095
1 EF 0.0004 -60.00 4.47E+05 0.017254 11264.23 -40.55122909 675.8538
FA 0.0003 -100.00 5.58E+05 0.016276 840.525 -8.405249718 84.0525
Total -33.99 1196.34

∆Q= 0.014207716

5
Loop Pipe k/D Q(l/s) Re ( x 10 ) λ K hL =kQ./Q/ hL/Q
BC 0.0004 50.00 3.72E+05 0.017463 11401.1 28.50275149 570.055
CD 0.0006 10.00 1.12E+05 0.02058 34009.5 3.400950079 340.095
2 DE 0.0004 -20.00 1.49E+05 0.018999 12403.4 -4.961361342 248.0681
EB 0.0006 -24.21 2.70E+05 0.019027 31442.77 -18.42936433 761.2294
Total 8.506353 1917.967

∆Q= -0.0022175
Node A B C D E F
Elevatio
n 30 25 20 20 22 25
(m.o.d)

Iteration 2
K=λL/(2g hL
Loop Pipe k/D Q(l/s) Re λ hL/Q
DA^2) =kQ./Q/
AB 0.00024 134.21 6.00E+05 0.015687 796.34 14.34345 106.875
BE 0.0006 26.43 2.95E+05 0.018918 31262.29 21.83811 826.2623
1 EF 0.0004 -45.79 3.41E+05 0.017574 11473.54 -24.0592 525.3994
FA 0.0003 -85.79 4.79E+05 0.016446 849.2842 -6.251 72.86203
Total 5.87132 1531.399

∆Q= -0.00192

hL
Loop Pipe k/D Q(l/s) Re λ K hL/Q
=kQ./Q/
BC 0.0004 47.78 3.56E+05 0.01752 11437.94 26.11467 546.5327
CD 0.0006 7.78 8.69E+04 0.021203 35038.45 2.12216 272.6852
2 DE 0.0004 -22.22 1.65E+05 0.018775 12257.44 -6.05051 272.3303
EB 0.0006 -24.52 2.74E+05 0.019011 31415.89 -18.8882 770.3176
Total 3.298135 1861.866

∆Q= -0.00089
Iteration 3
K=λL/(2g hL
Loop Pipe k/D Q(l/s) Re λ hL/Q
DA^2) =kQ./Q/
AB 0.00024 132.29 5.99E+05 0.015688 796.3936 13.93756 105.3555
BE 0.0006 25.41 2.95E+05 0.018919 31263.58 20.18589 794.4074
1 EF 0.0004 -47.71 3.41E+05 0.017574 11473.44 -26.1155 547.3894
FA 0.0003 -87.71 4.79E+05 0.016446 849.2964 -6.53356 74.49116
Total 1.474338 1521.644

∆Q= -0.00048

hL
Loop Pipe k/D Q(l/s) Re λ K hL/Q
=kQ./Q/
BC 0.0004 46.90 3.49E+05 0.017544 11453.91 25.19064 537.1512
CD 0.0006 6.90 7.70E+04 0.021538 35592.64 1.692969 245.4735
2 DE 0.0004 -23.10 1.72E+05 0.018696 12205.63 -6.51488 281.9897
EB 0.0006 -24.88 2.78E+05 0.018992 31384.49 -19.4275 780.8461
Total 0.941281 1845.46

∆Q= -0.00026
Iteration 4
K=λL/(2g hL
Loop Pipe k/D Q(l/s) Re λ hL/Q
DA^2) =kQ./Q/
AB 0.00024 131.81 5.88E+05 0.015708 797.4382 13.85381 105.1074
BE 0.0006 25.14 2.81E+05 0.018978 31362.24 19.82155 788.4468
1 EF 0.0004 -48.19 3.59E+05 0.017509 11430.53 -26.5489 550.8798
FA 0.0003 -88.19 4.93E+05 0.016413 847.5785 -6.59258 74.7511
Total 0.53384 1519.185

∆Q= -0.00018

hL
Loop Pipe k/D Q(l/s) Re λ K hL/Q
=kQ./Q/
BC 0.0004 45.74 3.40E+05 0.017578 11475.94 24.00935 524.9094
CD 0.0006 6.641723 7.42E+04 0.021645 35769.82 1.577896 237.5732
2 DE 0.0004 -23.3583 1.74E+05 0.018673 12190.48 -6.65124 284.7487
EB 0.0006 -25.135 2.81E+05 0.018978 31362.24 -19.8137 788.2908
Total -0.8777 1835.522

∆Q= 0.000239
Iteration 5
K=λL/(2g hL
Loop Pipe k/D Q(l/s) Re λ hL/Q
DA^2) =kQ./Q/
AB 0.00024 131.6306 5.88E+05 0.015708 797.4382 13.8169 104.9673
BE 0.0006 25.37 2.83E+05 0.018969 31347.63 20.17649 795.2895
1 EF 0.0004 -48.3694 3.60E+05 0.017505 11428.25 -26.7375 552.7779
FA 0.0003 -88.3694 4.93E+05 0.016413 847.5785 -6.61887 74.90002
Total 0.636977 1527.935

∆Q= -0.00021

hL
Loop Pipe k/D Q(l/s) Re λ K hL/Q
=kQ./Q/
BC 0.0004 45.97909 3.42E+05 0.01757 11470.96 24.25048 527.4242
CD 0.0006 6.880809 7.68E+04 0.021546 35604.96 1.685736 244.9909
2 DE 0.0004 -23.1192 1.72E+05 0.018696 12205.63 -6.52387 282.1843
EB 0.0006 -25.17 2.81E+05 0.018978 31362.24 -19.8689 789.3876
Total -0.45654 1843.987

∆Q= 0.000124

Head loss
Pipe Q (l/s) Node Pressure head (m)
(m)
AB 133.34 13.82 A 40
BE 23.34 20.17 B 31.18
FE 46.66 26.73 C 11.93
AF 86.66 6.62 D 10.24
BC 47.67 24.25 E 14.01
CD 7.67 1.69 F 38.38
ED 22.33 6.52