2023/238856
Date:02-07-2023
Department : Utility
Subject: Approval of budget for electrical expenses for new construction in Chirodzi camp
Preamble Details:
NA
Our Chirodzi project is on its expansion spree in mining, washery and, above all is the 8MW CPP project.
To accommodate the new workforce in Chirodzi camp,various residential projects along with new school and temple construction are going on.
The utility department has been doing all electrical projects related to new construction with existing-in-house staff.
Business Justification:-
NA
Proposal Details:
The summary of expenses for new construction and augmentation of existing systems is as below-
Expences for strengthening existing electrical infrastructure due to new construction and loads
1. Transformer 800 KVA 1 No 2000000
2. DG set 250 KVA 1 No 1500000
3 HT CABLE 3cx300 100mtr 500000
4 Cable termination 2 25000
5 Miscellaneous cables 500 5000000
New transformer for
6 1 1200000
contractor colony 250KVA
LT overhead lines and road
7 2 KM 1000000
light
8 Street lights 50 Nos 1500000
1
JSPL MOZAMBIQUE MINERAIS LDA/Chirodzi Mine/Utility/02-07-
2023/238856
Other Details:
Request you to kindly approve it for procurement and further action to complete the running projects
NFA Enclosures:
Initiated by:
02-07-2023
Signature
Approved by:
04-07-2023
Remarks:- approved
$signature Signature
2
JSPL MOZAMBIQUE MINERAIS LDA/Chirodzi Mine/Utility/02-07-
2023/238856
Approved by:
04-07-2023
Remarks:- ok
$signature Signature
Approved by:
05-07-2023
Remarks:- ok
$signature Signature
Approved by:
06-07-2023
Remarks:- Approved
$signature Signature