E-TENDER DOCUMENT
Name of the work: Energy Audit of CLW as per Energy Conservation Act 2001
Note:
Before quoting, It is mandatory to go through the latest GCC for services at this link
(http://indianrailways.gov.in/railwayboard/uploads/directorate/Transformation_Cell/General%2
0Conditions%20of%20Contract%20for%20Services.pdf) to avoid any confusion
Signature valid
Digitally signed by
ARUP KUMAR MITRA
Date: 2022.08.29
17:21:06 IST
Reason: IREPS-CRIS
Annexure-I
TECHNICAL SPECIFICATION AND SCHEME FOR ENERGY AUDIT OF
CLW/ CHITTARANJAN WORKSHOPS & TOWNSHIP
1.1 General
Chittaranjan Locomotive Works (CLW) located in Burdwan District of West Bengal. CLW
manufactures electrical locomotives, traction equipment and steel castings for Indian Railways. The
salient features of Chittaranjan Locomotive Works in connection with Production and Energy usage
are as under: -
Annual production : 486 Electric Locomotives (2021-22)
Target production : 485 Electric Locomotives (2021-22)
Operations : 283 days (General & Shift Operations)
Connected electrical load : 30MW
Contract Demand : 9 MVA
Annual electricity consumption : 36 million units.
Annual diesel consumption (as back up) : 15 KL
Power factor : 0.98 (average)
Note: - Tenderers may visit CLW, before quoting to obtain more details of the complete
establishment at their own cost for better appreciation and understand of the above.
(v) To audit the existing lighting system and give recommendations for optimized lighting and
energy requirements workshops & offices.
(vi) To audit various Electric Motors (above 50 H.P.) along with their usage and give
recommendations for reducing energy consumption and increasing efficiency of the system.
(vii) To audit the major fuel oil consumption points and related equipment.
(viii) To audit various testing facilities, labs for testing finished products for their efficient
utilization.
(ix) To audit energy intensive major plants / processes like Paint shop, VPI plant TM test plant,
short blasting plant, dust collection plant and welding plants, Sewage treatment plants. Give
recommendation for their effective usage.
(i) To audit the Water distribution system from start to end which includes Water Pumping System
pump performance, connected motor load, and suggested measures to optimize it.
(ii) To audit water pumping system in the Township Area, which includes vertical turbine pump for
drawing water, booster pump for distribution.
(iii) Energy audit of all the pumps with respect to their usage and efficiency, suggesting ways to
improve on it for reducing the energy consumption along with cost-benefit analysis.
4.0 Deliverables: -
4.1 Require to submit a detailed report clearly indicating on improving energy usage, an
alternate method to achieve the task in energy-efficient way and identification of energy-
saving opportunities of various equipment and process.
4.2 Submit a detailed report by segregating the major energy-intensive unit such as
Compressor, VPI plant, Heavy machinery, TM test plant, Short blusting plant, Welding
process, Oil furnaces, etc. by measuring the energy consumption and suggest ways to
conserve energy and increasing the efficiency without affecting the quality of work.
4.3 Submit a detailed report on the evaluation of electrical and other energy consumption at
present and recommendations of effective measures and action plan for maximum
energy saving with a view to optimizing the complete system.
4.4 Submit a detailed report on the energy consumption of various pumps, suggesting ways
to reduce energy consumption and increase the efficiency of the system. If energy-
efficient pump is required, then cost-benefit analysis is also given.
4.8 Training :
4.8.1 Develop a purposeful MIS, for effective monitoring and control of energy usage to reduce
the total cost ofd energy. Group of staff shall also require to be trained for running MIS.
4.8.2 To conduct awareness program for Executives and Non- Executives on Energy Efficiency.
Training should be given for conducting awareness program in regard to Energy
Efficiency. The training days will be as per mutual agreement between CLW auditors.
4.8.3 Audit Report in 03 hard copies and 01 soft copy in CD should be submitted after
completion.
4.8.4 Audio visual presentation in Energy Audit is also required to be given before CLW
Administration. Also during the course of the Audit CLW Administration shall be kept
appraised of the progress through audio visual presentation from time to time.
b. The Agency should be enlisted as accredited by the Bureau of Energy Efficiency (BEE)
Engineers who are likely to be working on energy Audits assignment of Indian Railways
should be certified from BEE. Enclose copy of certificate of BEE & proof that engineer is
working since last one year with the agency.
c. The agency should not be involved in any major litigation that may have an impact of
affecting or compromising the delivery of services as required under this contract.
d. The agency must not be black listed by any Central/ State Government/ Public Sector
Undertaking in India.
e. Consortium/ Joint Ventures will be allowed.
f. The agency is desired to have experience in implementation of energy efficiency projects
in Govt. sector.
7.0 Special notes: -
i) CLW will normally provide only one room accommodation in any Rest House at free
of cost, however, intimation should be sent at least 3 days in advance. In exceptional
cases accommodation for longer period can be considered.
ii) No Vehicle / Transport shall be provided by CLW.
8.0 Documents :-
Following documents to be enclosed duly filled by the Tenderer along with their offer.
8.1 Organizational Profile :
Sl. Details of the Company / Firm
No.
1.1 Name of the Company/ Firm
1.2 Year of registration/ Incorporation in India*.
1.3 Type of Organization (Service/ Manufacturer/ Consultants etc.)
1.4 Present certified / accredited Energy Auditors
1.5 Number of permanent employees
1.6 Number of key personnel working with the company since last two years.
1.7 Number of employees working in areas of Energy audit/ Performance.
1.8
1.9 experience in Energy Auditing for Government/
Commercial sector
1.10 Mailing address
1.11 Telephone No.
1.12 FAX No.
1.13 Email
1.14 Annual Turnover ** FY FY FY
2019-20 2020-21 2021-22
1.15 Annual Profits ** FY FY FY
2019-20 2020-21 2021-22
Witness Bidder
Signature Signature
Name Name
Address Designation
Company
Date Date
8.2 Prior Experience of the Organization:
In this, the bidder needs to provide following documents to support their experience.
(i) One page giving details of at least five energy audit carried out in Government/ PSU/ Corporate
buildings, hospitals, offices, commercial complexes having load more than prescribed in tender.
(ii) Credentials to support experience in preparation of Energy Audit reports thereafter in the last
three years.
(iii) Completion certificates from above mentioned establishments at least five during last three
years will be essential.
(ii) Development of protocol and format for energy audit: The selected bidder will develop
protocol and format of energy audit report based on the documents collected from employer
and take approval from the employer before starting energy audit of advertised location/ utility.
(iv) Approach to Implementation: This activity shall result in implementation of proposed measures in
Railway stations, hospitals, offices, residential colonies, production units, workshops etc. ENERGY
important to be
addressed in energy audit, which shall give true implementation potential and can be directly
adopted for implementation. This shall also discuss operational as well as administrative
parameters. Agency shall discuss their approach in capturing these parameters keeping
implementation in mind.
(v) Understanding of utilities in consideration: INDIAN RAILWAYS (IR) prefers ENERGY AUDIT
FIRMS/ESCO bid after having understanding about the utilities to be audited in
consideration. Agency explains their understanding of different utilities in consideration.
8.5 Composition of the team personnel and task(s) of each team member:
1. Key Professionals:
2. Team Members
Note: Please attach Letter of Intent or Purchase Order and Certificate of successful
completion for each project , from the respective Client(s).
Witness Bidder
Signature Signature
Name Name
Address Designation
Company
Date Date
8.8 Declaration Letter:
Declaration Letter on official letter head stating the following:
We are not involved in any major litigation that may have an impact of affecting or
compromising the delivery of services as required under this contract.
We are not black- listed by any Central/ State Government/ Public Sector Undertaking
in India.
Witness Bidder
Signature Signature
Name Name
Address Designation
Company
Date Date
SCHEDULE OF ITEMS, QUANTITIES & RATES
Name of Work : Energy Audit of CLW as per Energy Conservation Act 2001
Basic value : Rs. 6,64,000/- (Rupees Six lakhs Sixty-four Thousand only)
(GST Inclusive)
Estimate No. : EL-G-ENERGY AUDIT 22-23
Schedule
Sl. DESCRIPTION QTY Rate Unit Total
No
1. Energy Audit of CLW/Chittaranjan Workshop & Township as per 1 6,64,000 Job 6,64,000
Technical Specification (attached at annexure-I)
Total (inclusive GST) Rs. 6,64,000
End of document.