SERVICE BUILDING GROUND FLOOR BACKUP BUILDING GROUND FLOOR
CLIENT : PROJECT : INDEPENDENT ENGINEER : DESIGN BY : TITLE : ARCHITECTS- 4-laning of Fagne - Guj - Maharashtra Border Section of NH-6 from SERVICE & BACKUP BUILDING DETAILS Umesh Bagul Km 510.000 to Km 650.794 (package-III) Transportation ARCHITECT & INTERIOR DESIGNER 105+106, PADMA - VISHWA CENTRE in the state of Maharashtra to be executed as CONCESSIONAIRE : DRG. NO. : IL&FS Transportation OLD PANDIT COLONY, BOT (Toll) project on DBFOT pattern under NHDP GAJRA / TOLL PLAZA / DHULE -004 NASHIK. Fagne Songadh Expressway Limited Networks Limited PH-(0253) 2579667. Phase III REVISION : R1
CONSULTANCY SERVICES FOR "FEASIBILITY STUDY AND DETAILED DESIGN (ROAD,BRIDGES & CULVERTS) FOR PROPOSED ROAD EIDMONEY TO CHOWFALDANDI BRIDGE APPROACH (APPROXIMATE LENGTH 18.00 KM TO 25.00 KM)" EXTENDED UPTO COX'S BAZAR (REVISED LENGTH 36.900 KM) UNDER COX'S BAZAR ROAD DIVISION (0+000 CHAINAGE AT COX'S BAZAR)