CEILING CLOSURE INSPECTION FORM NO.

: PRV-RDD-E-017

Project: Date of Inspection: Click or tap to enter a date.


Unit Name Click or tap here to enter text. Unit Number Click or tap here to enter text.

CEILING CLOSURE INSPECTION

No. Description YES NO N/A Comments


Civil

1 Ceiling grid to be supported with adequate from the soffit slab


Click or tap here to enter
text.

2
Clear access path for the Landlord services (FF valve, FCU/AHU & IFU), duct dampers, water Click or tap here to enter
meter with service platform and/or catwalk if required. text.

3 Any ceiling suspended design features installation has to be as per the approved drawings
Click or tap here to enter
text.

4 All MEP services to be self-supported


Click or tap here to enter
text.

5 Tagging for all MEP services


Click or tap here to enter
text.

6 Fire sealant around penetrations through demise


Click or tap here to enter
text.
Fire Life Safety System
7 Click or tap here to enter
False ceiling smoke detector provision as per Civil Defence approved Drawing
text.
8 Click or tap here to enter
LED indicator provision in location as per approved drawing
text.
9 Click or tap here to enter
Coverage of smoke detector as per ADCD requirement
text.
10 Click or tap here to enter
Smoke detectors provided in show windows, fittings rooms and based on ceiling profiles
text.
11 Click or tap here to enter
End of resistor / capacitors provided at break glass and sounder circuit
text.
12 Click or tap here to enter
The installed fire devices are the same manufacture specifications as the base build.
text.
13 Click or tap here to enter
Void (above ceiling) smoke detector fixed directly to the soffit
text.
14 Fire resistant cables, directly fixed to the soffit, utilizing fire rate coated copper P clips with cable Click or tap here to enter
ties and fire rated glands* text.
15 Click or tap here to enter
Heat detectors installed in kitchen area
text.
16 Click or tap here to enter
Pipe sizes, sprinkler head locations are as per approved drawing.
text.
17 Click or tap here to enter
Pipe Material: GI ASTM A 53 Grade B, Sch.40, UL*
text.
18 Click or tap here to enter
Sprinkler Head make as per MEP Specifications and UL listed.
text.
19 Click or tap here to enter
Below ceiling sprinkler head: Recessed pendent, quick response, 68 ◦C, 3 mm
text.
CEILING CLOSURE INSPECTION FORM NO.: PRV-RDD-E-017

20 Click or tap here to enter


Above ceiling sprinkler head quick response, temperature rating 68 ◦C 3 mm
text.
21 Click or tap here to enter
Coverage of sprinkler head as per ADCD requirement
text.
22 Click or tap here to enter
Sprinkler heads provided in show windows, fittings rooms and based on ceiling profiles
text.
23 Click or tap here to enter
Piping installation as per NFP13 (Return bends / no direct tapping from bottom of the pipe)
text.
24 Click or tap here to enter
Sprinkler heads are installed, and pressure tested
text.
25 Click or tap here to enter
Piping and location of the fire hose cabinet as per approved drawing.
text.
26 Fire resistant white color cable provided for emergency and exit light (cable fixed directly to soffit Click or tap here to enter
by utilizing fire coated copper P clips with cable ties and fire-resistant glands) text.
27 Provisions for emergency exit & smoke detector to be provided for confined areas as per the Click or tap here to enter
approved drawings text.
28 Zone control valve assembly installed (BF valve, check valve & flow switch terminated to unit Click or tap here to enter
FAC text.
29 Click or tap here to enter
Drainpipe and valve provided and connected properly
text.
30 Click or tap here to enter
Fire resistant cables provided for the following: *
text.
30.1 Click or tap here to enter
Smoke detector and sounder circuit*
text.

INSPECTION CHECKLIST

No. Description YES NO N/A Comments


30.2 Click or tap here to enter
Music system*
text.
30.3 Click or tap here to enter
Smoke curtain*
text.
30.4 Click or tap here to enter
Hood fire suppression system*
text.
30.5 Click or tap here to enter
LPG gas panel*
text.
30.6 Click or tap here to enter
Zone control valve*
text.
30.7 Click or tap here to enter
Unit FACP terminated with IFU provision
text.
30.8 Click or tap here to enter
FAHU, FCU, A/C DB, Smoke extract fan and any tenant installed equipment
text.
HVAC
31 FCU supply and installation as per approved drawing. Click or tap here to enter
CEILING CLOSURE INSPECTION FORM NO.: PRV-RDD-E-017

text.
32 Click or tap here to enter
HVAC duct installation as per approved drawings
text.
33 Click or tap here to enter
Pre-insulated duct material, Phenolic, PID duct acceptable, PIR duct not acceptable*
text.
34 Click or tap here to enter
Flexi duct length ≤ 1200 MM
text.
35 Click or tap here to enter
FCU’s maintenance platform
text.
36 Click or tap here to enter
VCDs are installed at duct branches
text.
37 Click or tap here to enter
GI duct used for fresh and extract air duct
text.
38 Click or tap here to enter
Fire rated duct used for smoke extract duct (Anchor area >100 m²)
text.
40 Click or tap here to enter
Duct insulation thickness checked (Fiber glass: 40 mm and Elastomeric: 25 mm) *
text.
41 Click or tap here to enter
Chilled water pipe material: Black steel ASTM A 53 Grade B, Sch.40*
text.
42 Click or tap here to enter
Chilled water piping work completion (valves and accessories pressure tested)
text.
43 Click or tap here to enter
Condensate piping is provided for chilled water with insulation
text.
44 Click or tap here to enter
Chilled water pipe elastomeric insulation*
text.
45 Click or tap here to enter
Fresh air and extract duct work specifications*
text.
46.1 Click or tap here to enter
Flange joints are used*
text.
46.2 Click or tap here to enter
Ceramic wool gasket between flange and fire sealant longitudinal joint*
text.
46.3 Click or tap here to enter
Rock wool insulation used – high density not less than 100kg/m3*
text.
46.4 Click or tap here to enter
GI material used for Fresh Air Duct
text.
46.5 Click or tap here to enter
Rigid duct connected to the hood spigots (No flexible duct acceptable) *
text.
46.6 Click or tap here to enter
Kitchen hood supported with C channel frame (not threaded rod) *
text.
46.7 Click or tap here to enter
Kitchen extract and ecology unit
text.
CEILING CLOSURE INSPECTION FORM NO.: PRV-RDD-E-017

47 Click or tap here to enter


Fire damper and volume control damper is provided as per approved Drawings
text.
Power and Lighting
48 Ceiling rose installed, suspended cables from sofit ceiling dropped at proposed installation location Click or tap here to enter
(as per approved drawing) text.
49 Click or tap here to enter
LSF cables used. *
text.
50 Click or tap here to enter
IP 65 Power sockets used in wet and below kitchen hood area*
text.
51 Click or tap here to enter
Heat resistant cables used for light fixtures (105 degrees) in kitchen area
text.
52 Click or tap here to enter
Hilti, Fischer, Rawl plug make anchors used for supports*
text.
53 Click or tap here to enter
Cable trays are as per local authority regulations
text.
LPG

54 Click or tap here to enter


Pipe in pipe used for LPG pipe above ceiling
text.

APPROVAL
Ceiling Inspection: Approved
Not Approved Re-inspection Date: Click or tap to enter a date.

APPROVAL FOR CEILING CLOSURE

RDD – Delivery Manager


Name Click or tap here to enter text. Signature
Date Click or tap to enter a date.

Comments:
Click or tap here to enter text.

Items in asterisk (*) are material specifications and will be inspected progressively.