2 Kickoff Meeting For Reference 03 - PRV RDD e 017 - Ceiling Closure Inspection
2 Kickoff Meeting For Reference 03 - PRV RDD e 017 - Ceiling Closure Inspection
: PRV-RDD-E-017
2
Clear access path for the Landlord services (FF valve, FCU/AHU & IFU), duct dampers, water Click or tap here to enter
meter with service platform and/or catwalk if required. text.
3 Any ceiling suspended design features installation has to be as per the approved drawings
Click or tap here to enter
text.
INSPECTION CHECKLIST
text.
32 Click or tap here to enter
HVAC duct installation as per approved drawings
text.
33 Click or tap here to enter
Pre-insulated duct material, Phenolic, PID duct acceptable, PIR duct not acceptable*
text.
34 Click or tap here to enter
Flexi duct length ≤ 1200 MM
text.
35 Click or tap here to enter
FCU’s maintenance platform
text.
36 Click or tap here to enter
VCDs are installed at duct branches
text.
37 Click or tap here to enter
GI duct used for fresh and extract air duct
text.
38 Click or tap here to enter
Fire rated duct used for smoke extract duct (Anchor area >100 m²)
text.
40 Click or tap here to enter
Duct insulation thickness checked (Fiber glass: 40 mm and Elastomeric: 25 mm) *
text.
41 Click or tap here to enter
Chilled water pipe material: Black steel ASTM A 53 Grade B, Sch.40*
text.
42 Click or tap here to enter
Chilled water piping work completion (valves and accessories pressure tested)
text.
43 Click or tap here to enter
Condensate piping is provided for chilled water with insulation
text.
44 Click or tap here to enter
Chilled water pipe elastomeric insulation*
text.
45 Click or tap here to enter
Fresh air and extract duct work specifications*
text.
46.1 Click or tap here to enter
Flange joints are used*
text.
46.2 Click or tap here to enter
Ceramic wool gasket between flange and fire sealant longitudinal joint*
text.
46.3 Click or tap here to enter
Rock wool insulation used – high density not less than 100kg/m3*
text.
46.4 Click or tap here to enter
GI material used for Fresh Air Duct
text.
46.5 Click or tap here to enter
Rigid duct connected to the hood spigots (No flexible duct acceptable) *
text.
46.6 Click or tap here to enter
Kitchen hood supported with C channel frame (not threaded rod) *
text.
46.7 Click or tap here to enter
Kitchen extract and ecology unit
text.
CEILING CLOSURE INSPECTION FORM NO.: PRV-RDD-E-017
APPROVAL
Ceiling Inspection: Approved
Not Approved Re-inspection Date: Click or tap to enter a date.
Comments:
Click or tap here to enter text.
Items in asterisk (*) are material specifications and will be inspected progressively.