You are on page 1of 3

Name: Novy Glaiza B.

Solon BTLED-HE 2A Subject: BTLE 110


Instructor: Mr. Albert Gador Date: April 1,2024

Estimating Farm Inputs and Labor Requirements

OWNER’S NAME: JIE ANN BAYO


a. Area 400sqm
b. Crop Banana Crops
c. Age of crop 9 months
d. Planting distance between furrows and 2 km away
between hills.
e. Number of plants 600 plants
f. Numbers of workers who prepared the 12 workers
land
g. Number of days consumed in 2 weekS
preparing area.
h. Amount of salary given to each worker 400 per day
during land preparation.
i.Number of workers planted the area 12 workers
j. Number of days consumed in planting 2 weeks
area.
k. Amount of salary paid in planting area 400/day
l. Number of workers who fertilized the 12 workers
area from planting up to date of this
survey.
m. Quantity of fertilizer used from planting 2 sacks
up to date where survey was made
n. Amount of salary paid in applying 400/day
fertilizer from planting to the date of this
survey.
o. Quantity of fertilizer to be used after 3 sacks
the survey until final harvesting
p. Numbers of workers required to 12 workers
perform fertilization after the survey until
final harvesting
q. Amount of salary needed for fertilizer 400/day
application after this survey until final
harvesting
r. Estimated irrigation expenses from N/A
planting up to last harvest
s. Estimated worker hired to perform 3 Workers
irrigation from planting to last harvest
t. Estimated number of days for spraying 1 day
insecticides
u. Estimated workers needed for spraying 6 workers
insecticides
v. Estimated cost of insecticide used for N/A
spraying
w. Workers salary during insecticide 350/day
spraying
x. Estimated number of weeding 1 until harvesting
operations
y. Estimated number of workers needed 4 worker
in weeding
z. Workers salary during weeding 400/day
aa. Estimated harvesting period 4 months
bb. Estimated number of workers employ 8 workers
during harvesting from planting up to last
harvest.

You might also like