A NVR CABINET A
FRONT VIEW
B B
+0,2m
TERRAIN
±0,0m
D D
535
4x M10
E E
600
700
CCTV CABINET TYPE R1 TYPE R2 TYPE R3
700 QUANTITY 24 36 26
900
NOTES:
1. THE FOUNDATION DEPT MUST BE CHECKED ACCORDING TO STUDY OF SOIL
G G
MECHANIC EXECUTED FOR THE PROJECT.
THE PROCEDURES OF PREPARATION, PREPARATION, CURING AND QUALITY
CONTROL OF THE CONCRETE FOUNDATIONS WILL BE DONE IN ACCORDANCE
SECTION A-A SECTION B-B SECTION C-C WITH Std. NCh 170 of 2016
2. REINFORCED CONCRETE ELEMENTS:
FOUNDATIONS SIDE VIEW - CONDUIT ENTRANCE CONCRETE ARMATURE * QUALITY OF MATERIALS: CONCRETE FOUNDATIONS: H30 CONCRETE
REINFORCED STEEL: STEEL A630-420H
RAINFORCED * REINFORCED STEEL EMBEDMENT (COVERING): 50mm (MINIMUM)
H CONCRETE H
+0,20m +0,20m +0,20m 3. INSTALL 4x(Ø90mm) CORRUGATED CONDUITS UNDERGROUND PRIOR TO
TERRAIN FOUNDATIONS PREPARATION. ADAPT THE DIRECTION AND ORIENTATION OF THE
200
±0,0m ±0,0m ±0,0m INSTALLED CONDUITS TO THE FOLLOWING ROUTE OF INCOMING/OUTGOING CABLES.
4. FIX THE 4x(Ø90mm) CORRUGATED CONDUITS UNDER GRAVEL AND FOUNDATIONS
WITH CONCRETE GROUT.
750
R3 R3
CABLE TRENCH
550
600
R3 R3
J J
4x(Ø90) CONDUIT
50
1400
See NOTE 3. 4x(Ø90) CONDUIT
COMPACTED GRAVEL
INSTALLATION EXAMPLE.
See NOTE 4.
SELECT THE CORRECT ORIENTATION 60
ACCORDING TO CABLE ROUTE. 1250
K R2 R2 K
B REFERENCE DRAWINGS:
R1 R1 R1 PR_CL_0141_DD_0407 CABLE TRENCH SECTIONS
175
R2
550
R2
0 07/11/2021 FIRST ISSUE EG BG JZ
R1
850
C
A
Approved J.ZRNO
130 00 PRAHA 3
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16