ANNEX A - COST ESTIMATE (FOR FSR ITEMS IN IFM CONTRACT)

Initial cost
Information to MINDEF/SAF (for BI minor works):
Reference JRE/PLAB/2308/2413 1. When raising non-catalogue requisitions in ePS, use "95161426" as
Camp / Unit PLAB / HQISGG Commodity Code. The "Item Description" and "Unit Price" in ePS are
Company Name SMM Pte Ltd the "Work Description" and "Total Cost (excluding GST)" respectively
Contract No. 8022200026 in this cost estimate.
2. The purchase of non-FSR items cannot be raised against Period Contract.
They are not to be included in the same PO as the FSR items.
3. This cost estimate is valid for 3 months from the date of release, which is
to take reference from the date of submission of the Work Proposal.

Work Description To replace 2 units of 1FA at Block 4 Level 2

For FSR Items in IFM Contracts Only


Page No. in %
Item No. Service No. Item Description Qty UOM Unit Rate Cost
Contract Adjustment

BUILDING SECURITY SYSTEM


These rates apply to maintenance work
include supply, installation, testing and
commissioning of the building security
system. This rate includes removal of
existing installation and making good.
These rate shall also be used for A&A
work, however, SI is to consider and
BI_A_ELEC/
include the scope of work for new 2.00 NO $ 504.00 -20% $ 806.40
43/B
cabling, conduit and accessories.
INTRUSION DETECTION SYSTEM
(IDS)
ELECTRONIC ACCESS CONTROL
SYSTEM (EACS)
Reader & Controller (1FA) - PIN Only
Digital keypad access system complete
with digital keypad & processor

BUILDING SECURITY SYSTEM


These rates apply to maintenance work
include supply, installation, testing and
commissioning of the building security
system. This rate includes removal of
existing installation and making good.
BI_A_ELEC/
These rate shall also be used for A&A 2.00 NO $ 163.00 -20% $ 260.80
53/B
work, however, SI is to consider and
include the scope of work for new
cabling, conduit and accessories.
MISCELLANEOUS
Power Supply & Charger Unit
Switching power supply module,12V, 5A

BUILDING SECURITY SYSTEM


These rates apply to maintenance work
include supply, installation, testing and
commissioning of the building security
system. This rate includes removal of
existing installation and making good.
BI_A_ELEC/53/L These rate shall also be used for A&A 2.00 NO $ 79.00 -20% $ 126.40
work, however, SI is to consider and
include the scope of work for new
cabling, conduit and accessories.
MISCELLANEOUS
Battery
Battery, 7AH, rechargeable

LV SWITCHBOARD AND
DISTRIBUTION BOARD
ENCLOSURE
Supply and install the following mild steel
boxes c/w necessary purpose made
BI_A_ELEC/
clamps, bolts and nuts, hinged door, 2.00 NO $ 179.00 -20% $ 286.40
10C/B
water-tight gasket, lock, etc., including 2
undercoats of anti-rust paint and two
coats of finishing paint and EMC
compliance:
Exceeding 0.025m3 and up to 0.05m3

BUILDING SECURITY SYSTEM


These rates apply to maintenance work
include supply, installation, testing and
commissioning of the building security
system. This rate includes removal of
existing installation and making good.
BI_A_ELEC/ These rate shall also be used for A&A
5.00 MR $ 4.00 -20% $ 16.00
53/Y work, however, SI is to consider and
include the scope of work for new
cabling, conduit and accessories.
CABLE AND ACCESSORIES
Hardwire Cable
Twisted pair screened cable, 2 pair,
AWG 22

BUILDING SECURITY SYSTEM


These rates apply to maintenance work
include supply, installation, testing and
commissioning of the building security
system. This rate includes removal of
existing installation and making good.
BI_A_ELEC/
These rate shall also be used for A&A 5.00 MR $ 2.00 -20% $ 8.00
53/AA
work, however, SI is to consider and
include the scope of work for new
cabling, conduit and accessories.
CABLE AND ACCESSORIES
Hardwire Cable
Twisted pair cable, 1mm2, Red/Black

Completion of Work to be 16 weeks upon receive of Purchase Order


Less Cost Cap $ -
TOTAL COST (excluding GST) $ 1,504.00

Notes:
All prices are in Singapore Dollars and exclude GST.

745997569.xlsx
ANNEX A - COST ESTIMATE (FOR FSR ITEMS IN IFM CONTRACT)
Revised cost
Information to MINDEF/SAF (for BI minor works):
Reference JRE/PLAB/2311/3644 1. When raising non-catalogue requisitions in ePS, use "95161426" as
Camp / Unit PLAB / HQISGG Commodity Code. The "Item Description" and "Unit Price" in ePS are
Company Name SMM Pte Ltd the "Work Description" and "Total Cost (excluding GST)" respectively
Contract No. 8022200026 in this cost estimate.
2. The purchase of non-FSR items cannot be raised against Period Contract.
They are not to be included in the same PO as the FSR items.
3. This cost estimate is valid for 3 months from the date of release, which is
to take reference from the date of submission of the Work Proposal.

Work Description To replace normal light fittings into LED type at Block 4 Level 5

For FSR Items in IFM Contracts Only


Page No. in %
Item No. Service No. Item Description Qty UOM Unit Rate Cost
Contract Adjustment
Supply and install light fitting complete
BI_SOI024_04 77.00 NO $ 230.00 $ 17,710.00
with 2 X 20W, 2 ft, LED T5/T8 tubes

Completion of Work to be 16 weeks upon receive of Purchase Order


Less Cost Cap $ -
TOTAL COST (excluding GST) $ 17,710.00

Notes:
All prices are in Singapore Dollars and exclude GST.

745997569.xlsx