General Notes

- missing tags added 1. Do not scale drawings. Dimensions govern.


2. All dimensions are in millimetres unless noted otherwise.
- title drawing revised 3. All levels are in metres unless noted otherwise.
03 - refer to 1:50 DA plans for interfaces with windows and ID 4. Foster + Partners shall be notified in writing of any discrepancies.
5. Any area measurements outside of Foster + Partners scope are for
- internal balustrade fixation : refer to 100%DD submission (5/5/23) guidance only, subject to final confirmation upon completion of the other
Consultants' Design, which shall be submitted following Foster +
Partners Architectural DD submission
6. Foster + Partners' scope of services is limited to Core & Shell
Architecture services (Signature Architect) only. All representations of
other design / engineering disciplines' design are indicative only - for all
other disciplines' design please refer to their respective Design
submissions.
7. Not for Construction.
8. The Information Models and CAD drawings used as reference in this
submission, represent the documentation available on the 20th of
November 2023 in BIM 360 "L00 Laheq Island Wide" project.
9. The final FFL ground floor levels will vary according to DMP2 V18
topography and villa location on the masterplan.
10.The South Community villas shutter removal follow the solar shading
shoebox analysis by EOC which is based on SHGCgl 0.35 glass and
SBC and 50 W/m2 solar maximum criteria and 0 Hour of Annual
overheating and is compliant in all the villa orientations as per the latest
BAL-104
masterplan DMP2 rev18. The shutter removal has not taken into
05 51 00 consideration the potential ‘relaxation’ of the parameters in the winter
BAL-104
6
months, which will need to be further assessed by Chapman case-by-
05 51 00 6 6 6 6
BAL-104 BAL-104 case and Approved by RSG based on EOC’s latest simulation data.
5 5 5 05 51 00 5 05 51 00 5 Once confirmed, these relaxed criteria will allow for more shutters to be
4 4 4 4 4 removed in all orientations. The final solar response strategy will be
STR-101 STR-101
05 51 00 05 51 00
STR-101
05 51 00
BAL-201
3
BAL-201
05 51 00
issued by F+P via a separate matrix / manual once concluded.
3 3 3 05 51 00 3

BAL-201 2 2 2 2 2
05 51 00 BAL-201 STR-101 STR-101
05 51 00 05 51 00 05 51 00
1 BAL-201 1 1 1 1
05 51 00
0.00 0.00 BAL-104
0.00 0.00 0.00
05 51 00

1200 150 1200 1200 150 1200 1200 140 1200


1200 150 1200 1200 150 1200
2550 2550 2550 2540
2550

1 Staircase-31 (GF)
1 : 50 3 Staircase-33 (GF)
1 : 50 5 Staircase-34 (GF)
1 : 50 7 Staircase-38 (GF)
1 : 50 9 Staircase-39 (GF)
1 : 50

03 07/03/2024 100% Design Development - EB


1200 140 1200 Addendum III
1200 150 1200
02 01/12/2023 100% Design Development - EB
Addendum II
01 24/03/2023 100% Design Development EB
00 19/10/2022 100% Schematic Design EB
+2.10 +2.10
+2.10

1200
+2.10 Rev. Date Reason For Issue Chk

1200
1200

1200

1200
12
+2.10
Design Development
12 12
12 12
11 13
11 13 11 13 Key Plan.
11 13 11 13
STR-101 10 14
05 51 00 10 14 10 14
10 14 10 14
9 15
9 15 9 15
9 15 9 15
8 16
8 16 8 16
8 16 8 16
7 17
BAL-201
3080 7 17 7 17
7 17 7 17
05 51 00 6 18 BAL-104

3080
3080

3080

3080
BAL-104 05 51 00 6 18
6 18 6 18 6 18
5 19
05 51 00

5 19 5 19
STR-101 5 19 5 19
BAL-104 4 20
05 51 00
05 51 00 4 20 4 20
4 20 4 20
3 21
BAL-201
3 21 05 51 00 3 21
BAL-201 3 21 3 21
2 22
05 51 00
2 22 2 22
2 22 2 22
1 23 STR-101
05 51 00
Makkah
1 23 1 23
1 23 1 23

+4.20 +4.20 +4.20


+4.20 +4.20

2550 2550 2550 2555


2550

N
2 Staircase-31 (1F)
1 : 50 4 Staircase-33 (1F)
1 : 50 6 Staircase-34 (1F)
1 : 50 8 Staircase-38 (1F)
1 : 50 10 Staircase-39 (1F)
1 : 50

LIN-101 STR-101 BAL-201


09 21 16 05 51 00 05 51 00

1590 1500

1500
1 2 3 4 5 6

0.00

BAL-202
05 51 00

6 BAL-104 6
05 51 00 6
BAL-104 6
05 51 00 5 5
5 BAL-201
BAL-104 5 05 51 00
4 05 51 00 4
BAL-201 4
4
05 51 00 3 STR-101
05 51 00 3
3 STR-101
STR-101 3 05 51 00
2 BAL-201
05 51 00 2
2 05 51 00
BAL-201 2
1 05 51 00
1 STR-101 1 BAL-104 Executive Architect/ AOR
1 05 51 00
05 51 00 Licence number - 1010452878
0.00 0.00
0.00 0.00

1200 150 1200


1535 90 1535 1500 150 1500 1500 150 1500 Olaya District
2550 Riyadh 11625, KSA
3160 3150 3150 T +966 9200 29750
F +966 2900 29750
riyadh@dewan-architects.com

Signature/Design Architect

11 Staircase-41 (GF)
1 : 50 13 Staircase-44 (GF)
1 : 50 15 Staircase-47 (GF)
1 : 50 17 Staircase-49 (GF)
1 : 50 19 Staircase-52 (GF)
1 : 50
Riverside, 22 Hester Road © Foster + Partners 2022

London SW11 4AN


BAL-201
05 51 00
T +44(0)20 7738 0455
3090 F +44(0)20 7738 1107
STR-101
london@fosterandpartners.com www.fosterandpartners.com
1590 1500 05 51 00

Client

+1.225
1500

1540
+2.10 +2.10
1 2 3 4 5 6 7
1500

1500
+2.10
1490
1200

+2.10 8
STR-101
05 51 00
BAL-202 9
Project
12 STR-101 12

Laheq Island L02


12 05 51 00 05 51 00
12
10
BAL-201 11 13 13 11
05 51 00 11 13

Villas South Community


11 13
11
10 14 BAL-201 14 10
10 14
05 51 00 10 14 12
5730
2730

2650
5730
9 15 15 9
9 15
9 15 13
8 16 16 8
8 16
BAL-104 BAL-104 8 16 14
7 17 05 51 00 17 7
05 51 00 7 17 STR-101
05 51 00
3080

7 17 15

3080
3080

6 18 18 6
3080

6 18 BAL-104
5 19 BAL-201 05 51 00
6 18
+4.20 BAL-202 16
BAL-201 Drawing Title
05 51 00 19 5
05 51 00

Details
05 51 00 5 19 17
5 19
4 20
STR-101 20 4
4 20 18
05 51 00 4 20

Stairs / Ramps / Walkways


3 21 21 3
3 21 23 22 21 20 19
3 21
2 22 22 2 BAL-104

Stair Details
1540

2 22
1500

2 22 05 51 00
1 23 23 1
+4.20 1 23
1 23 +3.15 +4.20
+4.20
+4.20
Model File Reference
2550 3150 3150
3160
STR-101 BAL-201
L02-R02D01-FOS-00-ZZ-MOD-AR-00001
05 51 00 05 51 00

Drawn By Checked By Approved By

12 Staircase-41 (1F)
1 : 50 14 Staircase-44 (1F)
1 : 50 16 Staircase-47 (1F)
1 : 50 18 Staircase-49 (1F)
1 : 50 20 Staircase-52 (1F)
1 : 50
F+P
Project No
EB
First Issue Date
SB
Scale at ISO A0
L02R02 19/10/2022 1 : 50
Drawing Number Revision
L02-R02D01-FOS-00-XX-DWG-AR-52001 03