General Notes

1. Do not scale drawings. Dimensions govern.


2. All dimensions are in millimetres unless noted otherwise.
3. All levels are in metres unless noted otherwise.
4. Foster + Partners shall be notified in writing of any discrepancies.
5. Any area measurements outside of Foster + Partners scope are for
guidance only, subject to final confirmation upon completion of the other
Project Notes Symbols Abbreviations Consultants' Design, which shall be submitted following Foster +
Partners Architectural DD submission
6. Foster + Partners' scope of services is limited to Core & Shell
1.0 General AC Air Conditioning MACH Machine
Architecture services (Signature Architect) only. All representations of
ACO Acoustic(al) other design / engineering disciplines' design are indicative only - for all
1.1 The project notes are to be read in conjunction with all relevant technical specification sections. MAIN Maintenance other disciplines' design please refer to their respective Design
FFL +123.456 ACF Architectural Concrete Finish MAP Metal Acoustic Panel
1.2 For site information and existing conditions, refer to the survey provided by others. Foster + Partners is not responsible for the
Section/Elevation Floor Height Symbol SSL +123.456
ADH Adhesive MAT Material
submissions.
ADJ Adjacent 7. Not for Construction.
accuracy or completeness of this information. MAX Maximum 8. The Information Models and CAD drawings used as reference in this
A/E Architectural and Engineering
Section/Elevation Level Symbol AFF Above Finished Floor
MDF Medium Density Fibre [Board] submission, represent the documentation available on the 20th of
1.3 Refer to landscaping, structural, mechanical, acoustic, lighting, plumbing, fire protection, electrical and exterior wall MECH Mechanical November 2023 in BIM 360 "L00 Laheq Island Wide" project.
Underside of Slab Symbol AGG Aggregate MED Medium
maintenance consultants drawings and specifications for coordination of work. 9. The final FFL ground floor levels will vary according to DMP2 V18
ATL Alternative MEMB Membrane
U/S SLAB +123.456 topography and villa location on the masterplan.
ALUM Aluminium MEZZ Mezzanine
1.4 See structural drawings for exact location and size of all structural elements. 10.The South Community villas shutter removal follow the solar shading
ANOD Anodised MFR Manufacture(r)
FFL +123.456 AOD Above Ordnance Datum shoebox analysis by EOC which is based on SHGCgl 0.35 glass and
Finished Floor Level Symbol MH Manhole
1.5 All elevations are referenced to 0.000 Survey Datum, unless otherwise noted. All floor levels are to the top of the finished floor SBC and 50 W/m2 solar maximum criteria and 0 Hour of Annual
AP Access Panel MIN Minimum
unless otherwise noted. overheating and is compliant in all the villa orientations as per the latest
APPROX Approximate (Approximately) MIR Mirror(ed)
ARCH Architect(ural) masterplan DMP2 rev18. The shutter removal has not taken into
1.6 Cladding details shown are indicative of the profiling and detailing required. The intent shown on typical details is to be SSL +123.456 MISC Miscellaneous consideration the potential ‘relaxation’ of the parameters in the winter
Structural Slab Level Symbol AS Acoustic Sealant MJ Movement Joint
maintained throughout. months, which will need to be further assessed by Chapman case-by-
ASP Asphalt MO Masonry Opening
ASSY Assembly case and Approved by RSG based on EOC’s latest simulation data.
1.7 Construction or work indicated in the drawings as (NIC) is not included in this contract. MOD Modified Once confirmed, these relaxed criteria will allow for more shutters to be
AVG Average MS Mild Steel removed in all orientations. The final solar response strategy will be
1.8 All wall tiling modules are to be laid out on the wall so that the regulating edge conditions have cut tiles no less than half the full Plan Spot Level Symbol BAL Balustrade
MTL Metal issued by F+P via a separate matrix / manual once concluded.
size tile dimension, unless noted otherwise. MTD Mounted
+123.456 BRD Board
External Spot Level MUL Mullion
BTW Between MVT Movement
1.9 A finish indicated for a wall shall mean the entire length and height of a wall shall be finished as indicated unless otherwise
BJF Bituminous Joint Filler
stated.
FFL +123.456 BLDG Building N North
Internal Spot Level
BLK Blockwork / CMU NRC Noise Reduction Coefficient
1.10 Where recessed or non-modular fixtures are used in modular ceilings, they are to be centered in the tile as indicated unless SSL +123.456 BMS Building Management System NEG Negative
otherwise noted.
B/ Bottom of NIC Not In Contract
BRK Brick NO Number
1.11 Visualisations are for information only. EL + 123.456 BSMT Basement
Spot Elevation In Meters BWIC Builders Works in connection
NOM Nominal
NTS Not To Scale
2.0 Dimensions CAB Cabinet OA Overall
C/C Centre to Centre OC On Centre
2.1 Unless noted otherwise, all dimensions are given in millimetres.
Plan Change Of Level FFL+0.00 CH Ceiling Height (Above Finished Floor Level) OD Outside Diameter
CEM Cement OH Opposite Hand
2.2 Unless noted otherwise, all levels are given in metres.
FFL+0.03 m CER Ceramic OPNG Opening 05 01/12/2023 100% Design Development - EB
CIF Crack Inducer Floor Joint
2.3 Dimensions shall govern, do not scale drawings. OPP Opposite Addendum II
CJ Control Joint ORIG Original
Exterior Elevation Symbol C/L Centre Line 04 24/03/2023 100% Design Development EB
2.4 All dimensions shall be verified on site before proceeding with the work. Discrepancies must be notified.
CLG Ceiling 03 27/01/2023 50% Design Development EB
01
PARA Parapet
Elevation Designation CLO Closet PAV Pavers (Paving)
2.5 Exterior walls are dimensioned to the exterior finished face of the wall, unless noted otherwise.
CLR (OPG) Clear (Opening) 02 19/10/2022 100% Schematic Design EB
PC Precast Concrete
2.6 Unless noted otherwise, walls and partitions enclosing shafts (e.g. lift shafts, mechanical shafts) show the clear internal
CMU Concrete Masonry Unit (Blockwork) PCS Precast Concrete Systems 01 09/09/2022 50% Schematic Design EB
CO Clean Out
dimensions set out from a grid line. All other dimensions are from the finished face. PERP Perpendicular 00 27/07/2022 100% Concept Design EB
COL Column PFB Prefabricate(d)
COMM Communication Rev. Date Reason For Issue Chk
2.7 Stair dimensions are from the finished design face of the stair tread to unfinished face of the walls. PFL Power Float
1 COMP Composite / Composition
2.8 Partitions other than shaft enclosures are dimensioned to show their centre-line annotated with C/L, or to unfinished face, as
Elevation Designation With Sheet Reference Number
#-##-###- ##-## CONC Concrete
PL
PLA
Plastic Laminate
Plaster Design Development
CONN Connection PLBG Plumbing
shown on the drawings. Partitions shown flush faced with structural columns or walls are not dimensioned.
CONST Construction +/- Plus or Minus Key Plan.
CONT Continuous PNL Panel
Ref Ref CONTR Contractor POL Polished
COP Car Operating Panel PPC Polyester Power Coating
1 1 CORR Corridor PR Pair
Interior Elevation Symbols COV Covering PROD Product
CPT Carpet(ed)
1 1 1 1

Ref

Ref

Ref

Ref
A-### -##-### PNT Point
Elevation Designation With Sheet Reference Number CRN Cornice PT Paint
CS Concrete Sealed PTD Painted
1 1 CSK Counter sunk PTN Partition
CT Ceramic Tile PUC Polyurethane Coating
Ref Ref CTR Centre PVDF Polyvinylidene Fluoride Coating
CW Cold Water
Building Section Symbols PWC Paper Wall Covering
PWD Plywood
D Deep / depth
Section Designation 1 DA
DB
Detailed Arrangement
Decibel
QUAL Quality
QTY Quantity
DBL Double
DD Deck Drain R Riser
DEPT Department

N
RAD Radius
DET Detail RB Resilient Base
Section Designation With Sheet Reference Number 1 DIA Diameter RC Reinforced Concrete
#-##-###- ##-## DIAG Diagonal RCP Reflected Ceiling Plan
DIFF Diffuser RD Render(ing)
DIM Dimension RECON Reconstituted
DIV Division REF Reference / Refer
DL Dry Lining
01
REINF Reinforced
DLD Dead Load REM Remove / Removable
DN Down REQ Required
Enlarged Area Symbols DO Door Opening RES Resilient
DPC Damp Proof Course REV Revision / Revised
Detail Designation DPM Damp Proof Membrane RFL Raised Flooring System
DR Door RF Roof
DRG Drawing RFM Reinforced Mesh
DW Dumbwaiter RM Room
RO Rough Opening
E East RUB Rubber
EA Each RWP Rain Water Pipe
## EC Exposed Construction
#-###-### EJ Expansion Joint S South
##-##
EL Elevation SAN Sanitary Item
Detail Designation With Sheet Reference Number ELEC Electrical SCR Screed
EM Emergency SCHED Schedule
EML Expanded Metal Lath (Mesh) SECT Section
ENCL Enclosed / Enclosure SEP Separate(ing)
ENT Entrance SERV Service
EP Electrical Point SHT Sheet
EQ Equal SIM Similar
EQUIP Equipment SGN Signage
ERC Epoxy Resin Coating SLD Slide / Sliding
PROVIDE ESC Escalator SLT Sealant
EWC Electrical Water Cooler SN Sign(s)
Area Of Prototype Symbol PROTOTYPE EWS External Wall System SOP Setting Out Point
EXH Exhaust SPEC Specification(s)
EXIST Existing SPKR Speaker
EXPN Expansion SPR Sprinkler
EXPO Exposed SQ Square
EXT Exterior / External SSL Structural Slab Level
SS Stainless Steel
FA Fire Alarm SSS Satin Stainless Steel
Sheet Continuation Line FAP Fire Alarm Panel ST Stone
FCL Finished Ceiling Level STC Sound Transmission Class
For Sheet Continuation Of This Drawing See: A-XX-000- XX-31 FD Floor Drain STD Standard
FDTN Foundation STO Storage
FE Fire Extinguisher STRUCT Structure / Structural
Reception
Room Identification Symbol ##-###
FEC Fire Extinguisher Cabinet SUSP Suspend(ed)
FF&E Fixtures, Furniture & Equipment SW Switch
SWD Softwood
FFL Finished Floor Level SYM Symmetrical
FHC Fire Hose Cabinet
Identification Symbol (T Code) SAN-101
? FHR Fire Hose Reel T Tread
Executive Architect/ AOR
Licence number - 1010452878
FIN Finished TAN Tangent
FL / S Floor / Flooring System TECH Technical
FLASH Flashing TEL Telephone
FLUOR Fluorescent
Door / Window Symbol Number D05-08-01 W05-08-01 FO Face Of
TEM Temporary Olaya District
Riyadh 11625, KSA
FD30 TEMP Temperature
FUT Future THK Thick(ness)
T +966 9200 29750
F +966 2900 29750
FWC Fabric Wall Covering T/ Top of riyadh@dewan-architects.com
GA General Arrangement TYP Typical
Slab Penetrations Below GALV Galvanised Signature/Design Architect
GC General Contractor UG Upper Ground Level
GD Gold (Gilding) UNF Unfurnished
GL / S Glass / Glazing System UNO Unless Noted Otherwise
GLB Glass Block Riverside, 22 Hester Road © Foster + Partners 2022
Slab Penetrations Above GLN Grid Line
UR Urinal
London SW11 4AN
U/S Under Side
GR Grade T +44(0)20 7738 0455
GRND Ground VAR Varies / Variable F +44(0)20 7738 1107
GSK Gasket VERT Vertical london@fosterandpartners.com www.fosterandpartners.com
GYP Gypsum Plaster
Grid Line Symbol 00 VEST
VIN
Vestibule
Vinyl
Client
HD Head VNR Veneer
HM Hollow Metal VOC Volatile Organic Compounds
HORZ Horizontal
Revision Cloud HP High Point
VOL Volume
VP Vent Pipe
HR Hours (Fire Resistant Rating)
HSP Hose Point W West
HT Height W/ With
HTG Heating WA Wheelchair Access
HW Hot water W/O Without Project
In Abeyance HWD Hardwood WC Water Closet
HWR Hardware WD Wood Laheq Island L02
WHB Wash Hand Basin
ID
INC
Inside Diameter
Include / Inclusive
WLP Wallpaper Villas South Community
WPRS Waterproofing System
INFO Information WVR Wood Veneer
Revision Cloud Delta INSUL Insulation WT Weight
## INT Interior
ISOL Isolation
IWS Internal Wall System Drawing Title
N
JF Joint Filler Technical and Project Information
North Point
Project Notes and Abbreviations
JS Joint Sealant
JT Joint

KIT Kitchen
KRB Kerb

L Level
Model File Reference
LAM Laminated
LAQ Lacquered L02-R02D01-FOS-00-ZZ-MOD-AR-00001
LAT Lateral
LCA Local Collaborating Architect Drawn By Checked By Approved By
LG Lower Ground Floor
LIN Linear
LNG Longitudinal F+P EB SB
LP Low Point
LT Light Project No First Issue Date Scale at ISO A0
LTWT
LV
Lightweight
Level L02R02 27/07/2022 NTS
LVR Louvre
Drawing Number Revision
L02-R02D01-FOS-00-XX-DWG-AR-00601 05