You are on page 1of 1

General Note:

SITE INVENTORY AND ANALYSIS For any information concerning


this work architect should be
concerted

SITE INVENTORY 3. SUN ANGLE AND SUN PATH 6. TEMPERATURE


The direction of sun and the effect of sun present in the site will help me how to Minimum temperature is 10.3 centigrade and maximum temperature is 27 degree
Site inventory are informations about the properties of the site. orient the buildings and also to specify the type of openings that will match with centigrade, though most times in mbeya region is cold. Temperature will help to Project Title:
The following were the elements observed during site visit: the site determine how to orient windows and doors to the building so as to reduce coldness
1.site location
2.Site accessibility A proposed nursery school to be
3.Sun angle and sun path(orientation) built at iwambi area block F
4.Soil type
5.Precipitation
6.Temperature
7.Vegetation
8.Utilities
9.Neighborhood context
Drawing title:

SITE ANALYSIS site inventory and analysis


1. SITE LOCATION 7. VEGETATION
In the site there are natural vegetation ie trees, these trees are important to the site
The site is located in Mbeya region which is found in southern part of TANZANIA. and they will not affect the site during and after construction.
It is in Mbeya district at Iwambi 15 kilometers from mbeya city.

4. SOIL TYPE
Written By:
Nature of the soil found at the site is loam soil which supports cultivation and
plantation
Soil type helps to determine type of foundation that will be used at the site by Zawadi N Makingo
considering the soil type, also help to determine size of foundation
Reg: 20100434040032

Project coordinators:

Mr Israel Mayage
and
proposed area

28740sq m Dr Juma Nzige


8. UTILITIES
There are different services around the site, there is availability of electricity to the
site hence will help to easern electrical services to the site both during and after
construction.
5. PRECIPITATION/ RAINFALL
2. SITE ACCESSIBILITY The amount of rainfall is minimun in april, may, september, october and november. scale:
The site is accessible because its sorrounded with road there is main road from Mbeya- Maximum rainfall in december to march.
Tunduma but also there are other rough roads which gives a direct way to the site. Precipitation will help to avoid starting construction during rainfall season. not to scale
Hence the site is accessible, this is an advantage because its easier to transport different
materials during construction, but also even after construction the accessibility of the
site will help the childrens and workers to access their area easily.

Date:
proposed area

28740sq m

December 2022

GSPublisherVersion 0.57.100.100