Professional Documents
Culture Documents
BOQ
KHALIFA BIN ZAYED STREET PROJECT
SECTION D - WORK ITEMS
BILL NO. 04 - ROADS AND PAVINGS
Rate Amount
Item Description Unit Quantity
(AED) (AED)
Vehicular Pavers
150 mm thick subgrade selected fill material (Min. CBR > 25%)
4.20 m2 14,716
as per ADQCC Specifications
Pedestrian Pavers
Rate Amount
Item Description Unit Quantity
(AED) (AED)
150 mm thick subgrade selected fill material (Min. CBR > 25%)
4.24 m2 24,550
as per ADQCC Specifications
Granite Pavers
150 mm thick subgrade selected fill material (Min. CBR > 25%)
4.28 m2 30
as per ADQCC Specifications
Rate Amount
Item Description Unit Quantity
(AED) (AED)
Pedestrian Crossings
Bus shelter
Continuous lines