2a.

BOQ
KHALIFA BIN ZAYED STREET PROJECT
SECTION D - WORK ITEMS
BILL NO. 04 - ROADS AND PAVINGS

Rate Amount
Item Description Unit Quantity
(AED) (AED)

Vehicular Pavers

100X100X100mm thick (P-09) Beige vehicular pavers


4.16 m2 516
(approved patern and design) with sand filler material

100X100X100mm thick (P-10) Brown Beige vehicular pavers


4.16a m2 7,151
(approved patern and design) with sand filler material

100X200X100mm thick (P-11) Brown Beige vehicular pavers


4.16b m2 7,049
(approved patern and design) with sand filler material

4.17 50-70mm black sand levelling course m2 14,716

4.18 150mm aggregate base course m2 14,716

4.19 200mm granular sub-base course m2 14,716

150 mm thick subgrade selected fill material (Min. CBR > 25%)
4.20 m2 14,716
as per ADQCC Specifications

Pedestrian Pavers

100X100X60mm thick (P-01) Beige pedestrian pavers


4.21 m2 3,693
(approved patern and design) with sand filler material

300X300X60mm thick (P-02) Beige pedestrian pavers


4.21a m2 9,091
(approved patern and design) with sand filler material

600X600X60mm thick (P-03) Beige pedestrian pavers


4.21b m2 7,876
(approved patern and design) with sand filler material

600X600X60mm thick (P-04) Light Beige pedestrian pavers


4.21c m2 340
(approved patern and design) with sand filler material

1200X1200X60mm thick (P-05) Light Beige pedestrian pavers


4.21d m2 1,254
(approved patern and design) with sand filler material

Page: d/04-2 AED


KHALIFA BIN ZAYED STREET PROJECT
SECTION D - WORK ITEMS
BILL NO. 04 - ROADS AND PAVINGS

Rate Amount
Item Description Unit Quantity
(AED) (AED)

Pedestrian Pavers (Cont'd)

200X200X60mm thick (P-06) Dark Beige pedestrian pavers


4.21e m2 653
(approved patern and design) with sand filler material

600X600X60mm thick (P-07) Dark Beige pedestrian pavers


4.21f m2 1,332
(approved patern and design) with sand filler material

600X600X60mm thick (P-12) Brown Beige pedestrian pavers


4.21g m2 311
(approved patern and design) with sand filler material

4.22 50-70mm black sand levelling course m2 24,550

4.23 150mm thick granular subbase course m2 24,550

150 mm thick subgrade selected fill material (Min. CBR > 25%)
4.24 m2 24,550
as per ADQCC Specifications

Granite Pavers

Granite pavers (approved colour, patern and design) with sand


4.25 m2 30
filler material

4.26 50mm thick sand cement mortar m2 30

120mm thick concrete base with single layer A393 mesh


4.27 m2 30
reinforcement

150 mm thick subgrade selected fill material (Min. CBR > 25%)
4.28 m2 30
as per ADQCC Specifications

Pre-cast Concrete Steps

Pre-cast concrete steps including all required works as per


4.28a m2 16
Drawings and Specifications.

Tying to Existing Road

Tying to existing road including all necessary preparations


work as shown on the Drawings and Specifications.

4.29 Longitudinal joints m 1,300

Page: d/04-3 AED


KHALIFA BIN ZAYED STREET PROJECT
SECTION D - WORK ITEMS
BILL NO. 04 - ROADS AND PAVINGS

Rate Amount
Item Description Unit Quantity
(AED) (AED)

Kerbs and Edging

4.30 Drop kerbs 30cm thick, Type B m 2,800

4.30a Flush kerbs 20cm thick, Type F m 250

4.31 Upstand kerbs 15cm thick, Type B m 2,000

4.32 Flush kerbs 10cm thick, Type C m 1,600

4.32a Flush kerbs 10cm thick, Type E m 1,500

Pedestrian Crossings

Construction of pedestrian crossings at pre-cast concrete


4.33 nr 2
pavers including all related works

Construction of raised pedestrian crossings at pre-cast


4.34 nr 17
concrete pavers including all related works

Construction of pedestrian crossings at asphalt pavers


4.35 nr 8
including all related works

Construction of raised pedestrian crossings at asphalt pavers


4.36 nr 9
including all related works

Bus shelter

Supply and Install Bus shelter including excavation, foundation,


screed flooring, fabrication, erection of superstructure,
complete all electrical installations together with the power
supply connection from AADC with all necessary cable supply,
4.37 nr 2
installation and terminations, testing, commissioning, bus stop
marking, etc. all complete in accordance with the DOT
standard performance requirements, particular specifications
general arrangements and typical drawings

Ancillaries - Surface Markings

All the pavement markings at the project shall be completed as


shown in the drawings and specifications and as per the latest
ADQCC guidelines

Continuous lines

4.38 Stop Line; reference 601; 300mm wide m 116