Week Day Service Delivery (Activities
by Project team
Y 1
Week 1 N 0 TRABAJO EN KM9 EL CAR
NA 4
Y 6
TRABAJO EN ASCENCION GUARAYO, URUBIC
Week 2 N 0
JULIAN.
NA 1
Y 7
Week 3 N 0 TRABAJOS EN SANTA ROSA DEL SARA, LOS
NA 0
Y 6
TRABAJOS EN EL FUERTE, MERCADO ABAS
Week 4 N 0
ANDRES,SAN JOSE DE CH
NA 1
Y 7
Week 5 N 0 TRABAJOS EN LAS PETAS Y SAN VICEN
NA 0
Y 1
Week 6 N 0 TRABAJO EN SAN IGNA
NA 6
Stipulated
Total Service Providing Days Working
28 25
of the Month Days of the
Month
Overall Comments
Remarks:
1. The item is a monthly based and lump sum package price for project assistant service.
2. The acceptance evidence for project assistance service is the weekly report which shall be sent to the supplier superviso
and concerned managers.
3. If the weekly report can not be provided, the contractor supervisor's validation email could also be considered as valid ev
4. If the service providing days are less than 80% of the stipulated working days of the month, it shall be accepted based on
The accepted proportion = service providing days of the current month / stipulated working days of the current month.
5. The stipulated holidays falling from Monday to Saturday (shall be accepted as the normal service providing days and also
working days of the month.)
6. If the Supplier fails to provide proper supporting evidence, the Contractor reserves the right to reject the acceptance.
7. Only national hollydays are considered
ervision Service
marzo
2-Mar 1-Apr
Santa Cruz
Bolivia Entel AAM 2023 4.5G
Site Supervision Service Control
AAM23_WL_SUP5_MAR
0
Accepted Qty of
100%
the Service Item
sent to the supplier supervisor and CC the contractor supervisor
Total Semirural 0
Total Rural 0
Total Days with assigned Task (Y) 1
CORREO SEMANA9 FAVA TT
Total Days without assigned task (N) 0
Total days do not apply (NA) 6
Remarks and/or Comment
In assigned task:
Y : is for a labor regular day with assignment and acom
N : Is for Saturdays without assignment, Permission for service a
NA : For Sundays and hollydays. (If in Sunday or hollyday, there is service required by PM, the status
Weekly Deliverables Report
PO Number
Service Category
Origen Base
DU NAME
Project Name
Location
KM 9 EL CARMEN
DIA DE DESCANSO
Content
* Se empiezan con los Trabajos de Swap de Gabinete en Sitio KM9 El Carmen, Energizado
AC de Gabinete MTS9300A, se migran los equipos de BBU5900 y las conexiones de FO y
Energia DC, se finaliza el Swap y se deja todos los Servicios Activos.
* Se
entrega material Consumible a la Cuadrilla del Sitio KM9 El Carmen Bulcanizante, Precinto
Negros Gruesos
/or Comments
ned task:
ment and acomplish of the assigned task
on for service absense or internal supplyer issues
PM, the status of the day Change to "Y") or when the day doesnt belog to the month
Weekly Deliverables Rep
Week No. 10 4-Mar 10-Mar
Supplier Name TTIS LTDA
ID Service FAVA TTIS03
DUID AAM23_WL_SUP5_MAR
Project Code 56A0MBN
Assigned
Catogery Date Task by Region
Project team
This week
Deliverables Thursday, March 7, 2024 Y Rural
Total Semirural 0
In assigned task:
Y : is for a labor regular day with assignment and acompli
N : Is for Saturdays without assignment, Permission for service abs
NA : For Sundays and hollydays. (If in Sunday or hollyday, there is service required by PM, the status of
Weekly Deliverables Report
PO Number
Service Category
Origen Base
DU NAME
Project Name
Location
SAN JULIAN 6 DE
AGOSTO
ASCENCION DE
GUARAYOS 2
URUBICHA
URUBICHA
CERRO GRANDE
CERRO GRANDE
DOMINGO
In assigned task:
or regular day with assignment and acomplish of the assigned task
thout assignment, Permission for service absense or internal supplyer issues
here is service required by PM, the status of the day Change to "Y") or when the day doesnt belog to the month
erables Report
6121HG2538628-263
Site Supervision Service Control
Santa Cruz
AAM23_WL_SUP5_MAR
Bolivia Entel AAM 2023 4.5G
Content
RURAL
* Ingreso a Sitio Urubicha se supervisa la Instalación de
Antenas AAU3911 , se prepara el Sitio para el Swap de Gabinetes.
realiza el ingreso a Sitio CO Grande se supervisa los trabajos pre Swap de Gabinete,
Verificación de Equipos de Tx y Tablero Principal de Energia, para energizar el Nuevo
Gabinete.
/or Comments
ned task:
ment and acomplish of the assigned task
on for service absense or internal supplyer issues
PM, the status of the day Change to "Y") or when the day doesnt belog to the month
Weekly Deliverables R
Week No. 11 11-Mar 17-Mar
Supplier Name TTIS LTDA
ID Service FAVA TTIS03
DUID AAM23_WL_SUP5_MAR
Project Code 56A0MBN
Assigned
Catogery Date Task by Region
Project team
This week
Deliverables
Thursday, March 14, 2024 Y Urbano
Total Semirural 0
Total Rural 4
In assigned task:
Y : is for a labor regular day with assignment and acom
N : Is for Saturdays without assignment, Permission for service a
NA : For Sundays and hollydays. (If in Sunday or hollyday, there is service required by PM, the status
Weekly Deliverables Report
PO Number
Service Category
Origen Base
DU NAME
Project Name
Location
EL BAJIO
EL BAJIO
EL BAJIO
In assigned task:
or regular day with assignment and acomplish of the assigned task
thout assignment, Permission for service absense or internal supplyer issues
here is service required by PM, the status of the day Change to "Y") or when the day doesnt belog to the month
erables Report
6121HG2538628-263
Site Supervision Service Control
Santa Cruz
AAM23_WL_SUP5_MAR
Bolivia Entel AAM 2023 4.5G
Content
*Se retiran material desinstalados del Sitio Pentaguazu, 6 RRU para sitio Santa Rosa del
Sara 2 * Se
retiran material 3 atenas del Sitio Azubucito
* Se deja material en Sitio Santa Rosa del Sara 2, 3
Antenas Exabandas y 6 RRU 3971
* Ingreso a Sitio Calama se retira una RRU3971/1900 para el Sitio Los Pozos
IRB1. * Se ingresa a Sitio Los
Pozos IRB1 se entrega 1RRU 3971 /1900 se supervisa el Cambio y se da soporte para la
Integración se finaliza la Integración.
* Se supervisa los trabajos de Swap de Antenas en Sitio LOS POZOS IRB. se deja todo el
material desinstalado y protegido.
/or Comments
ned task:
ment and acomplish of the assigned task
on for service absense or internal supplyer issues
PM, the status of the day Change to "Y") or when the day doesnt belog to the month
Weekly Deliverables Report
This week
Deliverables
Thursday, March 21, 2024 Y Urbano
Total Semirural 0
In assigned task:
Y : is for a labor regular day with assignment and acomplis
N : Is for Saturdays without assignment, Permission for service abse
NA : For Sundays and hollydays. (If in Sunday or hollyday, there is service required by PM, the status of t
Weekly Deliverables Report
PO Number
Service Category
Origen Base
DU NAME
Project Name
Location
EL FUERTE
MERCADO ABASTO ll
MAIRANA ll
ALMACEN EL PARI
CENSO
SAN JOSE DE
CHIQUITOS
In assigned task:
labor regular day with assignment and acomplish of the assigned task
without assignment, Permission for service absense or internal supplyer issues
y, there is service required by PM, the status of the day Change to "Y") or when the day doesnt belog to the month
iverables Report
6121HG2538628-263
Site Supervision Service Control
Santa Cruz
AAM23_WL_SUP5_MAR
Bolivia Entel AAM 2023 4.5G
Content
* Se realiza el ingreso a Sitio Mutualista, se retira 6 FO para el Sitio URB. San Andrés.
CENSO NACIONAL
* Ingreso a Sitio San Jose de Chiquito se retira los equipos desintalados , Antenas , RRU,
parav el Sitio Ascencion de la Frontera.
nd/or Comments
signed task:
gnment and acomplish of the assigned task
ission for service absense or internal supplyer issues
by PM, the status of the day Change to "Y") or when the day doesnt belog to the month
Weekly Deliverables R
Week No. 13 25-Mar 31-Mar
Supplier Name TTIS LTDA
ID Service FAVA TTIS03
DUID AAM23_WL_SUP5_MAR
Project Code 56A0MBN
Assigned
Catogery Date Task by Region
Project team
This week
Deliverables Thursday, March 28, 2024 Y Rural
Total Semirural 0
Total Rural 7
Total Days with assigned Task (Y) 7
CORREO SEMANA13 TTIS03.z
Total Days without assigned task (N) 0
Total days do not apply (NA) 0
Remarks and/or Commen
In assigned task:
Y : is for a labor regular day with assignment and acom
N : Is for Saturdays without assignment, Permission for service
NA : For Sundays and hollydays. (If in Sunday or hollyday, there is service required by PM, the statu
Weekly Deliverables Report
PO Number
Service Category
Origen Base
DU NAME
Project Name
Location
SAN VICENTE DE LA
FRONTERA
SAN VICENTE DE LA
FRONTERA
LAS PETAS
LAS PETAS
LAS PETAS
LAS PETAS
SAN VICENTE DE LA
FRONTERA
Content
*Se supervisa la Finalización de los Trabajos realizados en Sitio Las Petas, se deja las
3RRU 1900 Y 1 RRU 850 Energizadas. Trabajos Finalizado. se realiza el QA EHS a la
Cuadrilla de Instalación.
*Se realiza el Retiro del Sitio las Petas, se deja los nuevos equipos Instalados energizados,
se devuelve las llaves al Personal encargado de la Población.
* Traslado de Localidad
las Petas a Localidad de San Vicente de la Frontera, para la conclusión de los trabajos de
instalación.
Ingreso a Sitio San Vicente de la Frontera se continua con la supervisión de los trabajos de
instalación, peinado de Energia y FO aterramientos de Antenas AAU, y RRU 1900, se deja
el Sitio Listo para Swap de Antenas
MANA13 TTIS03.zip
d/or Comments
ned task:
ment and acomplish of the assigned task
sion for service absense or internal supplyer issues
y PM, the status of the day Change to "Y") or when the day doesnt belog to the month
Weekly Deliverables
Week No. 14 1-Apr 7-Apr
Supplier Name TTIS LDTA
ID Service FAVA TTIS03
DUID AAM23_WL_SUP5_MAR
Project Code 56A0MBN
Assigned
Catogery Date Task by Region
Project team
This week
Thursday, April 4, 2024 NA Urbano
Deliverables
Total Semirural 0
Total Rural 1
Total Days with assigned Task (Y) 1
CORREO SEMANA14 FAV
Total Days without assigned task (N) 0
Total days do not apply (NA) 6
Remarks and/or Comm
In assigned task:
Y : is for a labor regular day with assignment and a
N : Is for Saturdays without assignment, Permission for serv
NA : For Sundays and hollydays. (If in Sunday or hollyday, there is service required by PM, the st
Weekly Deliverables Report
PO Number
Service Category
Origen Base
DU NAME
Project Name
Location
SAN IGNACIO
Content
* Ingreso a Sitio San Ignacio se realiza la Supervisión de los trabajos, para el Swap de
Gabinete, Instalación de Antenas Massive Mimo.
d/or Comments
gned task:
nment and acomplish of the assigned task
sion for service absense or internal supplyer issues
y PM, the status of the day Change to "Y") or when the day doesnt belog to the month
Feriados 2024
Monday, January 1, 2024 Año Nuevo
Monday, January 22, 2024 Día del Estado Plurinacional
Monday, February 12, 2024 Carnaval
Tuesday, February 13, 2024 Carnaval
Friday, March 29, 2024 Viernes Santo
Wednesday, May 1, 2024 Día del Trabajo
Thursday, May 30, 2024 Corpus Christi
Friday, June 21, 2024 Año Nuevo Aymara
Tuesday, August 6, 2024 Día de la Independencia
Saturday, November 2, 2024 Día de Todos los Difuntos
Wednesday, December 25, 2024 Navidad
ANNEX 1. BOQ, SOW AND PRICE LIST -REGION DIVISION / ANEXO 1. BOQ, SOW Y LISTA DE PRECIOS - DIVSION DE REGIONES
Page 42 of 47
ANNEX 1. BOQ, SOW AND PRICE LIST -REGION DIVISION / ANEXO 1. BOQ, SOW Y LISTA DE PRECIOS - DIVSION DE REGIONES
Page 43 of 47
ANNEX 1. BOQ, SOW AND PRICE LIST -REGION DIVISION / ANEXO 1. BOQ, SOW Y LISTA DE PRECIOS - DIVSION DE REGIONES
Litoral
Page 44 of 47
ANNEX 1. BOQ, SOW AND PRICE LIST -REGION DIVISION / ANEXO 1. BOQ, SOW Y LISTA DE PRECIOS - DIVSION DE REGIONES
Page 45 of 47
Potosí
ANNEX 1. BOQ, SOW AND PRICE LIST -REGION DIVISION / ANEXO 1. BOQ, SOW Y LISTA DE PRECIOS - DIVSION DE REGIONES
Page 46 of 47
ANNEX 1. BOQ, SOW AND PRICE LIST -REGION DIVISION / ANEXO 1. BOQ, SOW Y LISTA DE PRECIOS - DIVSION DE REGIONES
Page 47 of 47