You are on page 1of 6

Tinggi Revetment 1,5 meter

Item Pekerjaan Luas Panjang Volume Satuan Berat Besi


Galian 14.00 490.00 6,860.00 m3
Bor Pile K350 D60cm @2m 1.41 33,350.00 47,140.23 m3
Pembesian D16 126.67 29,929.00 3,791,006.67 kg 1.58
Pembesian D8 22.51 15,586.60 350,932.30 kg 0.40
STA 1+200-1+300 60.00 115.00 6,900.00
STA 6+800 130.00 115.00 14,950.00
STA 16+100 50.00 115.00 5,750.00
STA 16+300 50.00 115.00 5,750.00
Sirtu Dipadatkan 7.10 490.00 3,479.00 m3
Rip-rap D35cm 1.24 490.00 607.60 m3
Geotextile 2.40 490.00 1,176.00 m2
Concrete K250 (Revetment) 6.00 490.00 2,940.00 m3
Pembesian D16 336.62 490.00 164,942.17 kg 1.58
Waterstop 1.00 490.00 490.00 m2
Back Fill 0.90 490.00 441.00 m3

Tinggi Revetment 2,5 meter


Item Pekerjaan Luas Panjang Volume Satuan Berat Besi
Galian 35.63 3,080.00 109,740.40 m3
Bor Pile K350 D60cm @2m 0.28 139,875.00 39,542.66 m3
Pembesian D16 25.33 152,743.00 3,869,489.33 kg 1.58
Pembesian D8 4.50 126,219.00 568,364.16 kg 0.40
STA 9+800-10+000 60.00 150.00 9,000.00
STA 10+900-11+200 120.00 277.50 33,300.00
STA 12+800-12+900 160.00 115.00 18,400.00
STA 14+500-14+700 55.00 150.00 8,250.00
STA 15+900-16+000 50.00 87.50 4,375.00
STA 16+200 50.00 62.50 3,125.00
STA 0+100 80.00 80.00 6,400.00
STA 1+400 60.00 150.00 9,000.00
STA 2+000 60.00 25.00 1,500.00
STA 5+600-5+900 80.00 220.00 17,600.00
STA 6+600-6+700 130.00 222.50 28,925.00
Sirtu Dipadatkan 7.10 3,080.00 21,868.00 m3
Rip-rap D35cm 2.20 3,080.00 6,776.00 m3
Geotextile 12.70 3,080.00 39,116.00 m2
Concrete K250 (Revetment) 6.00 3,080.00 18,480.00 m3
Pembesian D16 372.08 3,080.00 1,146,016.67 kg 1.58
Waterstop 2.00 3,080.00 6,160.00 m2
Back Fill 4.90 3,080.00 15,092.00 m3

Tinggi Revetment 4 meter


Item Pekerjaan Luas Panjang Volume Satuan Berat Besi
Galian 14.00 125.00 1,750.00 m3
Bor Pile K350 D60cm @2m 0.28 184,800.00 52,242.96 m3
Pembesian D16 25.33 184,800.00 4,681,600.00 kg 1.58
Pembesian D8 4.50 184,800.00 832,154.40 kg 0.40
STA 9+700 60.00 3,080.00 184,800.00
Sirtu Dipadatkan 7.10 125.00 887.50 m3
Rip-rap D35cm 1.24 125.00 155.00 m3
Geotextile 2.40 125.00 300.00 m2
Concrete K250 (Revetment) 6.00 125.00 750.00 m3
Pembesian D16 414.83 125.00 51,854.17 kg 1.58
Waterstop 1.00 125.00 125.00 m2
Back Fill 0.90 125.00 112.50 m3

Kesimpulan REVETMENT
Item Pekerjaan Volume Satuan
Galian 118,350.40 m3
Bor Pile K350 D60cm @2m 138,925.85 m3
Pembesian D16 12,342,096.00 kg
Pembesian D8 1,751,450.86 kg
Sirtu Dipadatkan 26,234.50 m3
Rip-rap D35cm 7,538.60 m3
Geotextile 40,592.00 m2
Concrete K250 (Revetment) 22,170.00 m3
Pembesian D16 1,362,813.00 kg
Waterstop 6,775.00 m2
Back Fill 15,645.50 m3
Lokasi STA 1+200 sampai 1+500 (Kiri)
Elevasi Luas Volume
16 14,541 14,407
17 14,272 12,271
19 10,270 6,523
20 2,776 2,505
21 2,233 1,449
22 664 332

Total 10,808

Lokasi STA 6+300 sampai 6+900 (Kiri)


Elevasi Luas Volume
16 27,599 26,828
17 26,056 17,894
18 9,731 4,866

Total 49,587

Lokasi STA 8+800 sampai 9+600 (Kanan)


Elevasi Luas Volume
14 36,089 30,386
15 24,682 18,065
16 11,447 6,121
17 794 397

Total 54,968

Lokasi STA 10+600 sampai 11+400 (Kiri)


Elevasi Luas Volume
14 28,293 26,390
15 24,487 18,399
16 12,311 6,156

Total 50,945

Lokasi STA 14+300 sampai 14+800 (Kanan)


Elevasi Luas Volume
13 15,496 15,263
14 15,029 10,269
15 5,508 2,754

Total 28,285
Lokasi STA 15+800 sampai 16+400 (Kanan)
Elevasi Luas Volume
12 17,353 16,436
13 15,518 13,371
14 11,224 5,612

Total 35,419

Lokasi STA 16+800 sampai 17+400 (Kiri)


Elevasi Luas Volume
13 26,088 16,930
14 7,771 3,886

Total 20,815

Lokasi STA 17+500 sampai 18+100 (Kanan)


Elevasi Luas Volume
12 31,297 29,621
13 27,945 14,586
14 1,227 614

Total 44,821

Kesimpulan
Total Galian Sungai 295,646