Item Pekerjaan Volume Satuan
Galian 118,350.40 m3
Bor Pile K350 D60cm @2m 138,925.85 m3
Pembesian D16 12,342,096.00 kg
Pembesian D8 1,751,450.86 kg
Sirtu Dipadatkan 26,234.50 m3
Rip-rap D35cm 7,538.60 m3
Geotextile 40,592.00 m2
Concrete K250 (Revetment) 22,170.00 m3
Pembesian D16 1,362,813.00 kg
Waterstop 6,775.00 m2
Back Fill 15,645.50 m3
Lokasi STA 1+200 sampai 1+500 (Kiri)
Elevasi Luas Volume
16 14,541 14,407
17 14,272 12,271
19 10,270 6,523
20 2,776 2,505
21 2,233 1,449
22 664 332
Total 10,808
Total 49,587
Total 54,968
Total 50,945
Total 28,285
Lokasi STA 15+800 sampai 16+400 (Kanan)
Elevasi Luas Volume
12 17,353 16,436
13 15,518 13,371
14 11,224 5,612
Total 35,419
Total 20,815
Total 44,821
Kesimpulan
Total Galian Sungai 295,646