You are on page 1of 6

Contractor :

WUHAN BOILER CO .LTD ALSTOM BOILER FRANCE

A 17/11/15 N. PALOMBA L. COLLIN F. LE-TOHIC FIRST ISSUE FUS


Rev. Date Created by Checked by Approved by Description Status
Visa Visa Visa

Cross-Checked
Department Name Date Visa

Stamps or other information

Owner :

THANG LONG THERMAL POWER JOINT STOCK COMPANY


Consultant :
FICHTNER GmbH& Co.KG
Contractor :

WUHAN KAIDI ELECTRIC POWER ENGINEERING Co. LTD


Project Name :
THANG LONG 2 X 300MW
COAL FIRED THERMAL POWER PLANT PROJECT
Title:

METAL TEMPERATURE LOCATION

Projection Scale : N.A. Format : A4 Page : 1/6


Responsible Department Language : Date : Document
PROCESS ENG. ENG 17/11/15 Status : FUS
Type of the document : Other identification (if applicable) :
DETAIL CALCULATION

Alstom Boiler France


Identification number TLG/00/B/Z0306.0029/DC/---
Rev. A
WUHAN BOILER CO. LTD
Identification number
The information contained herein is GE proprietary information and has been disclosed in confidence to the designated party for
specified purposes only. Any use, disclosure or reproduction contrary thereto is a violation of GE’s right. ©GE 2015. All rights
reserved.
Rev : A
THANG LONG 2 x 300MW
METAL TEMPERATURE LOCATION Page : 2/6

Id N°: TLG/00/B/Z0306.0029/DC/---

REVISION DESCRIPTION

Rev. Date Modifications


A 17/11/15 First issue

The information contained herein is GE proprietary information and has been disclosed in confidence to the designated
party for specified purposes only. Any use, disclosure or reproduction contrary thereto is a violation of GE’s right. ©GE
2015. All rights reserved.
Rev : A
THANG LONG 2 x 300MW
METAL TEMPERATURE LOCATION Page : 3/6

Id N°: TLG/00/B/Z0306.0029/DC/---

TABLE OF CONTENT

1 PURPOSE ________________________________________________________________________________ 4

2 METAL TEMPERATURE LOCATION BASED ON BAIMA EXPERIENCE __________________________________ 4

2.1 FURNACE RIGHT WALL AND ROOF _______________________________________________________________ 4


2.2 BOILER REAR PASS REAR WALL AND ROOF__________________________________________________________ 5
2.3 BOILER REAR PASS HANGER TUBES_______________________________________________________________ 6

The information contained herein is GE proprietary information and has been disclosed in confidence to the designated
party for specified purposes only. Any use, disclosure or reproduction contrary thereto is a violation of GE’s right. ©GE
2015. All rights reserved.
Rev : A
THANG LONG 2 x 300MW
METAL TEMPERATURE LOCATION Page : 4/6

Id N°: TLG/00/B/Z0306.0029/DC/---

1 PURPOSE
The purpose of this process note is to define the metal temperature locations for the CFB Boiler 2 x 300
MWe of Thang Long in Viet Nam. As for Baima, metal temperature probes are installed on:
 furnace right wall and roof
 boiler rear pass rear wall, window tubes and roof
 boiler rear pass hanger tubes

2 Metal temperature location based on Baima experience


The following probes are used to operate the boiler.

2.1 Furnace right wall and roof


The following temperature probes are shown on the process diagram n° TLG/00/B/F0001-----/FD/---:
 Temperature probes n° HAD10 CT101 to HAD10 CT106 on front wall
 Temperature probes n° HAD50 CT101 to HAD50 CT104 on roof

Reference drawing N° TLG/00/B/P0220-----/GA/---

Boiler LEFT
axis

41600mm
Furnace 200mm
+/-200
axis

36730mm
Outlet
window
Window top level
+/-200mm
+/-200

Outlet window

FRONT REAR

EL +35700mm
-0/+500mm Legend

on fin

on tube
1200mm 1200mm
+/-200
RIGHT +/-200

The information contained herein is GE proprietary information and has been disclosed in confidence to the designated
party for specified purposes only. Any use, disclosure or reproduction contrary thereto is a violation of GE’s right. ©GE
2015. All rights reserved.
Rev : A
THANG LONG 2 x 300MW
METAL TEMPERATURE LOCATION Page : 5/6

Id N°: TLG/00/B/Z0306.0029/DC/---

2.2 Boiler rear pass rear wall and roof


The following temperature probes are shown on the process diagram n° TLG/00/B/F0002-----/FD/---:
 Temperature probes n° HAH35 CT101 to HAH35 CT120 on hanger tubes (including window
hanger tubes described in §2.3.
 Temperature probes n° HAH36 CT101 to HAH36 CT110 on rear wall and roof

Reference drawing N° TLG/00/B/P0200-----/GA/--- and TLG/00/B/P0215-----/GA/---

FRONT
Boiler
axis
52849mm

50674mm
Backpass axis
+/-200mm

Window top level Intlet window


+/-200mm
Window middle level
+/-200mm
+/-200

RIGHT LEFT

1200mm 1200mm
+/-200 +/-200

Legend
REAR
on fin

on tube

The information contained herein is GE proprietary information and has been disclosed in confidence to the designated
party for specified purposes only. Any use, disclosure or reproduction contrary thereto is a violation of GE’s right. ©GE
2015. All rights reserved.
Rev : A
THANG LONG 2 x 300MW
METAL TEMPERATURE LOCATION Page : 6/6

Id N°: TLG/00/B/Z0306.0029/DC/---

2.3 Boiler rear pass hanger tubes


Reference drawing N° TLG/00/B/P0200-----/GA/---

FRONT
Hanger tubes

1500mm+/-200
1200mm
+/-200
1500mm+/-200

Backpass axis

1200mm 1200mm
+/-200 +/-200
RIGHT LEFT

1200mm
+/-200

Backpass Backpass
axis REAR axis

Please note the probe location on window hanger tubes:

WINDOW HANGER TUBES


Temperature probes
installed on the first tube,
on the opposite side of
duct radiation

Protection
Flue gas sheet
flow to rear
pass

The information contained herein is GE proprietary information and has been disclosed in confidence to the designated
party for specified purposes only. Any use, disclosure or reproduction contrary thereto is a violation of GE’s right. ©GE
2015. All rights reserved.

You might also like