ABSTRACT
Energy is the basic need for the development of the modern world. For meeting up the
regular demand of energy we need to design a system that will produce electricity
without destroying the nature. This paper attempts to show how man has been utilizing
and optimizing kinetic energy. Researches show that the world has already had its
enough shares of its energy resources. Fossil fuels pollute the environment. Nuclear
energy requires careful handling of both raw as well as waste material. The focus now is
shifting more and more towards the renewable sources of energy, which are essentially,
non-polluting. This paper attempts to show how energy can be produced, stored and
used using the road transport. Using road transportation energy can be produced, stored,
where the ramp is used for tapping the energy and generating power as a power
generating unit. In which we can get 24x7 supply of electricity without harming and
polluting the environment. The pressure plate is main mechanism used for generating
the electricity.
i
LIST OF FIGURES
1: Introduction.........................................................................1-3
2: Uses .....................................................................................4
3: Advantages...........................................................................5
4: Methodology......................................................................6-13
5: Conclusion...........................................................................14
ii
INTRODUCTION
Amongst the all form of energy the electricity is most widely used form of energy. There
is great lack of electricity in today's world, which we have to overcome. As we know the vehicles
on road are increasing very fastly in the world. As these vehicle are moving on the road they
possess some kinetic energy, which can be used for generating rotational motion of generator and
then we can produce considerable amount of electricity. As we know that the resources to
generate the electricity are lasting very rapidly and there is great increase in population which
uses the electricity for their day to day requirements. These has generated the problem of energy
crisis in the world. So we need to bring such ideas which can generate the electricity from the
things which we can uses in day to day life. So from the vehicles we can generate the electricity
by using their kinetic energy as these vehicles passes over the ramp.
The ramp was invented by peter Hughes, an electrical and mechanical engineer who is
employed by Highway Energy System Ltd. This company says that under normal traffic
conditions, the apparatus will produce 30 KW of electricity. Other proposed applications for the
road ramps include powering streets and traffic lights, heating roads in the winter to prevent ice
from forming and ventilating tunnels to reduce pollution. First of all we need to know about the
concept of this technique. If we want to use the kinetic energy which is to be converted in
electrical energy, we have to make a mechanical mechanism to rotate a generator. And kinetic
The electricity produced from ramp is said to be "clean" because its production produces
no pollution. As both health and environmental concerns are on the rise, clean energy sources are
1
a growing demand. We are proud to present the energy ramp which is made to deploy on roads
and that can produce electrical energy with out any cost when a vehicle passes over it.
These generated energy can be utilised for many purpose like street lights, lighting of
The ramp is not like usual speed-breaker.It is not harmful for the vehicles or cannot
become the cause of waste petrol when a carpasses over it. The speed ramp is not dangerous for
vehicles at all. It does not only generate free energy, but the energy that has been generated is
environment friendly with almost no pollution. On the whole the energy ramp system consist of
2
The India has second largest road network in the world, which contributes of over
5472144 km as on 31st march 2015. Amongst which 1455 km of expressway are operational
government of India by the year 2022. National Highway Authority of India(NHAI) which is
responsible for development and management of the network of over 50000 km of a national
highway out of 115000 km in India. The 148000 km of a state highway are operational in India
and the Maharashtra state has 33705 km of state highway which is largest of state highway as
compare to other states. So using these road network and vehicles we can generate electricity
3
USES
• To create electrical energy for running our appliances which are used in day to day
activities.
• To utilize freely available renewable resources for generating energy rather than using
• Such ramps can be designed at every highway as an alternative source of energy to meet
• This energy can be used for the lights on the either sides of the roads and thus much
power that is consumed by these lights can be utilized to send power to these villages.
• Electricity generated from one vehicle around 8.175Watt which can be used for various
purpose
• Energy scarcity is the main problem in our country,so this may solve the problem to
some extent.
• This technique is used to produce electricity which can be used in traffic lights and
powering streets.
4
ADVANTAGES
• Generation of power without polluting the environment.
• Energy scarcity is the main problem in our country,so this may solve the problem to
some extent.
• Electricity generated from one vehicle around 8.175Watt which can be used for various
purpose.
• Energy produced from this ramp is pollution free and maintenance of ramp is more, so it
• We can get 24x7 supply of electricity without harming and polluting the environment.
• Electro-kinetic road ramp is the method of generating electricity by harnessing the kinetic
5
METHODOLOGY
Working model :
• Road Power Generation (RPG) is a system design to capture waste and kinetic energy
from all vehicles. This device converts the kinetic energy of the vehicles into electric
• First moving car pass over the ramp. Due to vehicle load pressure plates present on the
• All pressure plates are connected to shaft using Rack and Pinion mechanism.
• Rack and Pinion mechanism convert the linear motion of pressure plate into angular
alternator.
• Whenever needed DC energy is converted into AC energy with the help of inverter and
passed on.
• On the whole, the overall Energy Ramp system is a combination of both software as well
as hardware model. The information given below will describe the features of both the
models.
6
Figure no.2 System implemented at ground
Hardware model :
The Ramp consists of gear box, flywheel, drive system and alternator. It consist of a slab
that is press down by the vehicle which produces translation motion. In addition to this a battery
isattached to alternator. Inverter is placed with the battery and a load is attached.
Relays are attached for the purpose of controlling. First one is attached between
Alternator & Battery and second is between Battery and Inverter that break the connection.
The third relay is placed between the inverter and the load which indicates the completion of
process i.e. when inverter passes 220V it energies the relay and a connection is produced
7
Figure no.3 System block diagram
A rotation reader circuit is placed in front of Flywheel. Relays are attached for the
purpose of controlling. First one is attached between Alternator & Battery and second is between
Battery and Inverter that break the connection. The third relay is placed between the inverter and
the load which indicates the completion of process i.e. when inverter passes 220V it energies the
relay and a connection is produced between the Inverter and the Load Bank.
8
A Limit switch is placed below the slab for the counting of the cars. When a car passes
over the slab, the limit switch is pressed then the limit switch signals sends to the digital input
(1746-IB16) module.
Software Model :
A Limit switch is placed below the slab for the counting of the cars. When a car passes
over the slab, the limit switch is pressed then the limit switch signals sends to the digital input
(1746-IB16) module.Allen Bradley SLC 5/03 PLC is used for monitoring & controlling of the
system and a PC-Based HMI is connected with it for displaying the process.
9
Whole system is fully automated with programmable logic controller PLC.When a car
passes over the slab, the limit switch is pressed then the limit switch signals sends to the digital
Finally number of cars displayed on the PC-Based HMI.The Software’s that are used for
The Modules that are used in SLC 5/03 are listed below: 1747-L532 (SLC 5/03 Processor)
The rotation reader provided pulses that are the digital input of the 1746-IB16 module.
PLC is programmed that the pulses is converted into rpm and are displayed on the PC-Based
HMI.
When a car passes over the slab, thelimitswitch is pressed thenthe limit switch signals
Finally number of cars displayed on the PC-Based HMI. Relays are attached for the
purpose of controlling.
The output module (1746-OB16) of PLC controls the relaysandthe indication is displayed
in the circuit.
10
Figure no.6 Flowchart of the whole system operation
Drainage specification :
Slope : 2H-1V
Ramp drainage
Height : 1m
11
Slope: According to ground level
Working principle:
Thus, system design for RPG to capture the kinetic energy from every vehicle in this
process kinetic converts into electrical energy. These is done by installing the pressure plate on
Future Enhancement :
• If we use more than one crank in the system, we can drive more alternators.
• The crank can be design in such a way that it gives more rotation per push.
• By using more effective alternators and inverters, we can get less Power losses.
12
CONCLUSION
• It has been analyzed that currently alternate energy produces approximately 11% to our
primary energy.
• It has been determined that by using coal, oil and gas sources at the current rate,may
cause the global temperature raised by 2 degrees Celsius by the year 2020.
• For this reason, it is assumed that by the year 2070, 60% of the total energy will be
• Now 5 % yearly increase in the use of energy produce by fuel, and cause increase in
• Our energy ramp which is the combination of both mechanical and electrical circuitry is
an innovative approach in order to decrease the energy crisis globally and to take a step
13
14