You are on page 1of 4

DPU

Aimfosuer uality Aadit o Thstitte oxdept

AppayatS

ST No Equipmcnts Rating Quantity


PQ Analy2ey FLUKE 48-B MaX Gol
Lamp L:6 2000 W
nductiuc load Bank
Capacitive load Bank
Peysona ComPuter
FLUKE View Po Anelye Softuare
Pouer log V2.9.2 Softuare

Theaay
What is pouey quality
he teYm PoueY uelity means
different feoples Relative di£ferent hings to
fre Severit ofdevia
tion in Ihe in omingPol/ey
Suppliedto electviCol equipment
fYom he Steadyo fundamchtal50 H2 ox , Voltage
Curyent
PoCY 9uality PYoblem
PouweY uality is affected from
both Side o theqYid Ye ferrinj both e -the uality
Xeliability of Pouer as Spplied by the Utility
Cffects of Customer oad S on tranSmisSion System
There are folloiht type of Po problemS:
DPU
1Harmenics
Alit td Ae
I tis a distsxtion o utility
m are Caused by Noh-Lincar045 whic
matey Conto,Computers OffiCe_equpment.C whiCh inc luAe
televisjon meSt clectronic oadS Hih Ha EL
increasethe linc losses Hatntimehine
decreaSeequipment oiks aimimers
2 Tyansient.S
Commonly (ledSuclsSAyaes Spikes
tyanSient S aye he most
fequent ype
otcntCn easiest to ix. sfPoProblen
3 BAYnLetS
hese are hours
Caused by S1stcm on Vsltase SaSas
gs
OvCY/4d
damage Of equiPmentS heseare tendins to
4 Reliahlity miin

a Yefeysto he Pobability
Contintous 6pply of of
maintalaiag-
majntaning
electricity withaut intcrmaptn
Necessity o PQ Atdit

Nev aeneratioh 04d eluiphment


based Control uth ymiCYoF SSeKs
Senstaue Pover
poey clettronic devices
elettronic deviceS are
arem@
6An 9sey hes
S4Ch incease auwareness
aYe ness 0E P issues
aSinterruptionsSa15 Sirtchin1 ansh
DPU
OMany areno
Interonnec ih a letuwoxk
hin
flare 0any Componnt hasmoreConsequenCes.

P Problem Con Casily Cause osSes in the billions


of dollars So cntiye andusis iS done te Correct hose
Problems.

PoucY Quality Adit


Ffon Suyge Suppressoxsfiltey f
Votage Re gulatoys to isolatjon
Po/CY Conditionsrs to mstey qeneytransmissiontransfoumeL,
PoveY
a Solution of ator Setstherc 1sS
geneyatr
every PQ_prablem i s imaginable.
Som eatures0f an audit inclades
BasicData gatheringOnelysis.
RevieU of facility wivins
Provide wYltten Ye Camm@hd 9rsundingSyStCm
ation snecessary.
Possible Solution to the PQ
P (orrection. ProblemS
DynamiC Sa Coryectjon
P Monitoring
Harmonics tiltey, Static
Haymohics ittY, DyhamiC
Pro Cedure
1) Make (onnectionS as pey Ckt
mantoflake 43-B PQ Anelyzer dia1YamS.as pey
Check Set_date hme fom mCnu optI0h
Turn on S4pply uSing PQ Analy2er
DPU
to mea Sure arIenEJ t Voltage
Volt
Select FLUKE 43-B
SelletC.
Ere UeltageSa data
S a u eSCYecep to ecoxd
Dol/nloadSCreeh P Ahaly2cr

Obser/ation Teble

SY No Lab Voltage Curent Fouey THD


HD Cas
Cos
C T) VI
3 kv
PLC lab 226-357o. FVA 292-8 0.9
O-06 FUAR

Machine lab 2386

HV Lob 23 035 0.07/888 0 86


0-08 FVA
0 04 kVAR

PSab 2359 23

Conclesion
Hence ftom this experiment we
he poucY ulity Audit Stsditd ob
his Audit is Carried Outn
depaybmcnt