TEMPORARY TEMPORARY SHEET PILE


MESH FENCING TEMPORARY DRAINAGE
SIDEW

FENCE
PLAN

PIPE 500MMØ

A
TRANSASIA CONSTRUCTION
ALK
TING

DEVELOPMENT CORPORATION

1
PROJECT MANAGEMENT

H20
L1-DM

DESIGN MANAGEMENT AND CONSULTANT


H21
L1-DM

TEMPORARY AND YS
MH

ION = 34 DA
OLIT AIDEA DESIGN FOUNDATION INC.
MESH FENCING DEM ORATION
T
L1-DM
H22

RES DESIGN AND BIM MANAGEMENT


CONSULTANT AND DESIGNER
H23
L1-DM

CONSULTANT AND DESIGNER


DRAINAGE OUTFALL
ELEV. +1030 AMSL
EXISTING DRAINAGE
DURATION OF BLOCKS
EXISTING DRAIN MH
H24
2,3 & 4 = 196 DAYS
AGE L1-DM
MEINHARDT
CONSULTING ENGINEERS/PLANNERS/MANAGERS
CONSULTANT AND DESIGNER
LINE OF BASEMENT/
DEMOLITION AND CONSULTANT AND DESIGNER
RESTORATION = 34 DAYS RETAINING WALL

E EXISTING DRAINAGE
AG PROPERTY B+H ARCHITECTS
AIN DURATION OF BLOCK 5 CONSULTING ENGINEERS/PLANNERS/MANAGERS
DR
LINE AS PER = 190 DAYS
CONSULTANT AND DESIGNER
STRUCTURAL CONSULTANT
ADJUSTED PROPERTY
EW
DN
EXISTING PLAN
LINE AS PER OKADA
DRAINAGE
6
L1-DMH2
E

1
80

SURVEY BY DAPITAN
OS
OP
PR

SY^2+ ASSOCIATES
L1-DMH25

STRUCTURAL ENGINEERS
STRUCTURAL CONSULTANT

LIGHTING CONSULTANT

1 24 23

PREPARED BY

SERVICE ROAD (±20.00M RROW) Construction and Developloment Corporation

PHENIX GARUDA CONSTRUCTION


AND DEVELOPMENT CORPORATION
DESIGN + BUILD CONTRACTOR

NO. DATE DESCRIPTION


TEMPORARY FENCE

REVISIONS
KEY PLAN:

PART OF EXIXTING LANDSCAPE LEGEND:


ROAD VERGE
EXISTING ROAD VERGE
RCBC LINE DRAWING TITLE:

COMBINED EXISTING DRAINAGE LINE AND EXISTING DRAINAGE LINE DWG REF NO:

PROPOSED DIVERSION OF NEW DRAINAGE PROPERTY LINE PURPOSE OF ISSUE:


REV.
LINE OF BASEMENT/RETAINING WALL
SHOWING WATERFEATURE PLAN AND CHECKED BY:

PROPOSED NEW DRAINAGE DRAWN BY: ATB

MODIFICATION OF ROAD NETWORK SHEET PILE


DATE:
REFFERENCE DRAWINGS:

TEMPORARY DRAINAGE PIPE 500MMØ


SECTION 1 ADJUSTMENT OF TEMPORARY FENCE
APPROVED APPROVED W/ COMMENTS DISAPPROVED
WORK MAY PROCEED. WORK MAY PROCEED. REVISE AND RESUBMIT.
PROJECT

TEMPORARY BANYAN
BANYAN
TREETREE
MANILA
MANILA
FENCE EXISTING FENCE (PROJECT
(PROJECT
GENESIS)
GENESIS)
NEW SEASIDE
NEW SEASIDE
DRIVE, DRIVE,
TAMBO,TAMBO,
PARAÑAQUE,
PARAÑAQUE,
METRO METRO
MANILA,
MANILA,
PHILIPPINES
PHILIPPINES
1701 1701
MATCHLINE A
MATCHLINE B

OWNER

C
TRANSASIA CONSTRUCTION
DEVELOPMENT CORPORATION
PROJECT MANAGEMENT

L1-DMH13
L1-DMH14
L1-DMH18 L1-DMH16 L1-DMH15
L1-DMH17
L1-DMH19

5868
DESIGN MANAGEMENT AND CONSULTANT

AIDEA DESIGN FOUNDATION INC.


DESIGN AND BIM MANAGEMENT

EXISTING LINE OF BASEMENT/


CONSULTANT AND DESIGNER

CONSULTANT AND DESIGNER


DRAINAGE RETAINING WALL PROPERTY
LINE AS PER
ADJUSTED PROPERTY
PLAN ADJACENT
LINE AS PER OKADA MEINHARDT
SURVEY BY DAPITAN LOT CONSULTING ENGINEERS/PLANNERS/MANAGERS
CONSULTANT AND DESIGNER
CPL2-DMH11
CONSULTANT AND DESIGNER

EXISTING DRAINAGE
B+H ARCHITECTS
CONSULTING ENGINEERS/PLANNERS/MANAGERS
CONSULTANT AND DESIGNER
STRUCTURAL CONSULTANT

LINCON AVENUE (±11.00M RROW)


SY^2+ ASSOCIATES
STRUCTURAL ENGINEERS
STRUCTURAL CONSULTANT
CPL2-DMH10

LIGHTING CONSULTANT

22 21 20 19

PREPARED BY

SERVICE ROAD (±20.00M RROW) Construction and Developloment Corporation

PHENIX GARUDA CONSTRUCTION


AND DEVELOPMENT CORPORATION
DESIGN + BUILD CONTRACTOR

NO. DATE DESCRIPTION


REVISIONS
KEY PLAN:

LEGEND:
EXISTING ROAD VERGE
RCBC LINE DRAWING TITLE:

COMBINED EXISTING DRAINAGE LINE AND EXISTING DRAINAGE LINE DWG REF NO:

PROPOSED DIVERSION OF NEW DRAINAGE PROPERTY LINE PURPOSE OF ISSUE:


REV.
LINE OF BASEMENT/RETAINING WALL
SHOWING WATERFEATURE PLAN AND CHECKED BY:

PROPOSED NEW DRAINAGE DRAWN BY: ATB

MODIFICATION OF ROAD NETWORK SHEET PILE


DATE:
REFFERENCE DRAWINGS:

TEMPORARY DRAINAGE PIPE 500MMØ


ADJUSTMENT OF TEMPORARY FENCE
APPROVED APPROVED W/ COMMENTS DISAPPROVED
WORK MAY PROCEED. WORK MAY PROCEED. REVISE AND RESUBMIT.
PROJECT

BANYAN
BANYAN
TREETREE
MANILA
MANILA
(PROJECT
(PROJECT
GENESIS)
GENESIS)
NEW SEASIDE
NEW SEASIDE
DRIVE, DRIVE,
TAMBO,TAMBO,
PARAÑAQUE,
PARAÑAQUE,
METRO METRO
MANILA,
MANILA,
PHILIPPINES
PHILIPPINES
1701 1701

OWNER

3RD FLOOR
+12.70 AMSL TRANSASIA CONSTRUCTION
DEVELOPMENT CORPORATION
PROJECT MANAGEMENT

PROJECT MANAGEMENT

DESIGN MANAGEMENT AND CONSULTANT

2ND FLOOR
+9.20 AMSL
AIDEA DESIGN FOUNDATION INC.
DESIGN AND BIM MANAGEMENT

PROPERTY LINE
CONSULTANT AND DESIGNER

ADJUSTMENT OF TEMPORARY FENCE


CONSULTANT AND DESIGNER

MEINHARDT
CONSULTING ENGINEERS/PLANNERS/MANAGERS
CONSULTANT AND DESIGNER

TEMPORARY FENCE
CONSULTANT AND DESIGNER

FFL +5.200 m 1ST FLOOR


+5.20 AMSL

LANDSCAPE
B+H ARCHITECTS
SOIL BUILDUP
CONSULTING ENGINEERS/PLANNERS/MANAGERS
SIDEWALK CONSULTANT AND DESIGNER
MAIN ROAD LANDSCAPE STRUCTURAL CONSULTANT

TEMPORARY
DRAINAGE PIPE
POTABLE WATER TANK EXISTING RCBC PROPOSED RCBC 500mm Ø
133 m² PART OF THE
SHEET PILE

SHEET PILE
SY^2+ ASSOCIATES
BUILDING STRUCTURAL ENGINEERS
STRUCTURAL CONSULTANT

LIGHTING CONSULTANT

PILECAP

PREPARED BY

BORED PILE

Construction and Developloment Corporation

PHENIX GARUDA CONSTRUCTION


AND DEVELOPMENT CORPORATION
DESIGN + BUILD CONTRACTOR

NO. DATE DESCRIPTION


REVISIONS
KEY PLAN:

LEGEND: DRAWING TITLE:

RCBC LINE DWG REF NO:

EXISTING DRAINAGE LINE PURPOSE OF ISSUE:


REV.

PROPERTY LINE CHECKED BY:

LINE OF BASEMENT/RETAINING WALL DRAWN BY:

DATE:

SECTION A PROPOSED NEW DRAINAGE REFFERENCE DRAWINGS:

SCALE 1:300
SHEET PILE
TEMPORARY DRAINAGE PIPE 700MMØ
ADJUSTMENT OF TEMPORARY FENCE APPROVED APPROVED W/ COMMENTS DISAPPROVED
WORK MAY PROCEED. WORK MAY PROCEED. REVISE AND RESUBMIT.
PROJECT

BANYAN
BANYAN
TREETREE
MANILA
MANILA
(PROJECT
(PROJECT
GENESIS)
GENESIS)

T-1 7' NEW SEASIDE


NEW SEASIDE
DRIVE, DRIVE,
METRO METRO
MANILA,
TAMBO,TAMBO,
MANILA,
PARAÑAQUE,
PHILIPPINES
PARAÑAQUE,
PHILIPPINES
1701 1701

OWNER

TRANSASIA CONSTRUCTION
DEVELOPMENT CORPORATION
PROJECT MANAGEMENT

PROJECT MANAGEMENT

DESIGN MANAGEMENT AND CONSULTANT

AIDEA DESIGN FOUNDATION INC.


DESIGN AND BIM MANAGEMENT
CONSULTANT AND DESIGNER

CONSULTANT AND DESIGNER

MEINHARDT

ADJUSTMENT OF TEMPORARY FENCE


CONSULTING ENGINEERS/PLANNERS/MANAGERS
CONSULTANT AND DESIGNER

CONSULTANT AND DESIGNER

WATER FEATURE
+6.000 m (BY CONSULTANT)
B+H ARCHITECTS
LANDSCAPE
LANDSCAPE CONSULTING ENGINEERS/PLANNERS/MANAGERS
CONSULTANT AND DESIGNER
FFL +5.200 m STRUCTURAL CONSULTANT
DRIVEWAY

SIDEWALK
PART OF EXIXTING
ROAD VERGE FFL/SSL +3.672 m

PUMP ROOM SY^2+ ASSOCIATES


66 m² STRUCTURAL ENGINEERS
STRUCTURAL CONSULTANT
PROPOSED RCBC EXISTING RCBC LIGHTING CONSULTANT

FFL/SSL +1.800 m

SHEET PILE

SHEET PILE
PILECAP PREPARED BY

Construction and Developloment Corporation

BORED PILE PHENIX GARUDA CONSTRUCTION


AND DEVELOPMENT CORPORATION
DESIGN + BUILD CONTRACTOR

NO. DATE DESCRIPTION


REVISIONS
KEY PLAN:

LEGEND: DRAWING TITLE:

RCBC LINE DWG REF NO:

EXISTING DRAINAGE LINE PURPOSE OF ISSUE:


REV.

PROPERTY LINE CHECKED BY:

LINE OF BASEMENT/RETAINING WALL DRAWN BY:

DATE:

SECTION B PROPOSED NEW DRAINAGE REFFERENCE DRAWINGS:

SCALE 1:300
SHEET PILE
TEMPORARY DRAINAGE PIPE 700MMØ
ADJUSTMENT OF TEMPORARY FENCE APPROVED APPROVED W/ COMMENTS DISAPPROVED
WORK MAY PROCEED. WORK MAY PROCEED. REVISE AND RESUBMIT.
PROJECT

BANYAN
BANYAN
TREETREE
MANILA
MANILA
(PROJECT
(PROJECT
GENESIS)
GENESIS)
NEW SEASIDE
NEW SEASIDE
DRIVE, DRIVE,
TAMBO,TAMBO,
PARAÑAQUE,
PARAÑAQUE,
METRO METRO
MANILA,
MANILA,
PHILIPPINES
PHILIPPINES
1701 1701

OWNER

TRANSASIA CONSTRUCTION
DEVELOPMENT CORPORATION

LINE AS PER OKADA


SURVEY BY DAPITAN

ADJUSTED PROPERTY
PROPERTY LINE
AS PER PLAN
PROJECT MANAGEMENT

PROJECT MANAGEMENT

DESIGN MANAGEMENT AND CONSULTANT

BANYAN TREE LOBBY


254 m² AIDEA DESIGN FOUNDATION INC.

LANDSCAPE DESIGN AND BIM MANAGEMENT


CONSULTANT AND DESIGNER

CONSULTANT AND DESIGNER

FFL +5.200 m SSL +5.025 m


SIDEWALK
MEINHARDT
CONSULTING ENGINEERS/PLANNERS/MANAGERS
CONSULTANT AND DESIGNER

CONSULTANT AND DESIGNER

DRIVEWAY & PARKING B+H ARCHITECTS


EXISTING RCBC CONSULTING ENGINEERS/PLANNERS/MANAGERS

3530 m² CONSULTANT AND DESIGNER


STRUCTURAL CONSULTANT

FFL/SSL +1.800 m

SHEET PILE
SY^2+ ASSOCIATES
STRUCTURAL ENGINEERS
STRUCTURAL CONSULTANT

LIGHTING CONSULTANT
PILECAP

PREPARED BY

BORED PILE
Construction and Developloment Corporation

PHENIX GARUDA CONSTRUCTION


AND DEVELOPMENT CORPORATION
DESIGN + BUILD CONTRACTOR

NO. DATE DESCRIPTION


REVISIONS
KEY PLAN:

LEGEND: DRAWING TITLE:

RCBC LINE DWG REF NO:

EXISTING DRAINAGE LINE PURPOSE OF ISSUE:


REV.

PROPERTY LINE CHECKED BY:

LINE OF BASEMENT/RETAINING WALL DRAWN BY:

DATE:

SECTION C PROPOSED NEW DRAINAGE REFFERENCE DRAWINGS:

SCALE 1:300
SHEET PILE
TEMPORARY DRAINAGE PIPE 700MMØ
ADJUSTMENT OF TEMPORARY FENCE APPROVED APPROVED W/ COMMENTS DISAPPROVED
WORK MAY PROCEED. WORK MAY PROCEED. REVISE AND RESUBMIT.