Case Scenario-3
Case Scenario-3
for
HUNZA
Prepared By:
SHAHZAIB AHMAD
INNOVATIVE ENGINEERING SOLUTION
HOUSE 84-B, ZARAR SHAHEED ROAD
LAHORE-54000
+924236674002
25/03/24
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
hazem PEARL CONTINENTAL HOTEL AND RESORT
heaven Page 2
General Data
Project Title: PEARL CONTINENTAL HOTEL
Project File Name: CASE SCENARIO-3..fiw
AND RESORT
Designed By: SHAHZAIB AHMAD Date: 25/03/24
Code Reference: NFPA 1, NFPA 13, NFPA 14, NFPA
Approving Agency:
20
CASE SCENARIO - 3 (BASED ON PROVIDING 250 GPM AT THE FOUR HYDRAULICALLY
MOST REMOTE HOSE CONNECTIONS ON HORIZONTAL STANDPIPE AND AT TOPMOST
OUTLET OF EACH OTHER STANDPIPES.
Client Name: PEARL CONTINENTAL HOTEL
Phone:
AND RESORT
Address: HUNZA City, State Zip Code:
Company Name: INNOVATIVE ENGINEERING
Representative:
SOLUTION
Company Address: HOUSE 84-B, ZARAR SHAHEED
City And State: LAHORE-54000
ROAD
Phone: +924236674002
Building Name: PEARL CONTINENTAL HOTEL
Building Owner: PEARL CONTINENTAL
AND RESORT
Contact at Building: Phone at Building:
Address Of Building: City, State Zip Code:
Project Data
Description Of Hazard: STANDPIPE Hose System Type: Wet
Design Area Of Water Application: 1 ft² Maximum Area Per Hose: 1 ft²
Default Hose K-Factor: 25.00 K Default Pipe Material: SCHED 40 WET STEEL
Inside Hose Stream Allowance: 0.00 gpm Outside Hose Stream Allowance: 0.00 gpm
In Rack Sprinkler Allowance: 0.00 gpm
Hose Specifications
Make: Model:
Size: Temperature Rating: 0 F
HOTEL AND RESTAURANT
BUILDING
Group Peak Node Groupings Output Data (Inputs may have changed)
Pipe Segment Pipe Pipe Hose Flow Fixed Flow Beg. Node Imbalance
Beg. End. Type Flow Rate At Beg. Node Out (+) In (-) Residual Flow At Beg.
Node Node Group (gpm) (gpm) (gpm) (gpm) Pressure (psi) Node (gpm)
Hose Summary
Hose System Type: Wet
Specified Area Of Application: 1.00 ft²
Minimum Desired Density: 0.000 gpm/ft²
Application Average Density: 1051.828 gpm/ft²
Application Average Area Per Hose: 0.25 ft²
Hose Flow: 1051.83 gpm
Average Hose Flow: 262.96 gpm
200
180
160
160
140
Pressure psi
120
100
80
60
40
20
0
2 4 6 8 10 12 14 16 18 20
Flowrate(x100) gpm
EL
EV
AT
IO
N=
+6
4'-9
"
"
13
8'-6
+5 15
N=
IO
AT
EV
EL
EL
EV
AT
IO
N
=+
64
'-9
" 12
4" "
=Ø
R 1
TE 55'-1 4"
=Ø
ME H = R "
DIANGT TE 6'-0
LE ME H =
DIANGT
LE
11E
DIA LEVA
10
EL LENMET TION
EV G ER =+
AT TH = 58
IO =1 Ø 2-1 '-6
N
= + '-6" /2" "
58
'-6
"
6Ø"
R= "
TE 10'-6
ME H =
DIANGT
LE
06 09EL
EL
DIA EV DIA EVA
AT
EL LENMET TION
05 08
EL LE MET IO
N= EV G ER
EV NG ER AT TH = =+
AT TH = +5 IO =1 Ø 2 48
IO =1 Ø 2 8'-6 N = '-6 -1/2 '-0
N = '-6 -1/2 " "
+5 " " +4 " "
8'-6 8'-0
" "
E
OSHER
6Ø"
R= "
TE 41'-0
ME H =
DIANGT
LE
H
O TE E OT
M H
REOF T2)
6"
=Ø
R "
TE 51'-6
ME H =
DIANGT
LE
T .
M OSACH .1.2
Y E 1 0
LL OF ): 7.
"
'-0
+7 07
N=
A T IO
6
VA
T
E
EL
IC E 1
A UL UTL 4 (20
R O 1
DIA
H YD ST FPA
LE ME
NG TE
O
UROPMER N
TH R =
=1 6Ø"
48
'-0
"
O
F T P
6"
T HETHE AS
D
Ø
R= "
AT AT AN
TE 84'-0
ME H =
DIANGT "
LE +7
'-0
N=
IO
AT
M D
02
2
EV
ELE EL
P N .1.
VA
TIO 04
N
= -1
4'-0
0 GPE A10.1
DIA "
01 LE ME
N TE
ELEGTH R = =Ø6" "
VA = 22Ø 6" R '-0
TIO ' TE = 7
N= ME TH
5
-17'
-0"
DIAENG
L
2 I .
IN G DP 6): 7
N 1
VID STA (20
"
-7'-0
03
N=
A TIO
EV
EL
O L 4
N PRNTA A 1
O FP
ED ORIZ R N
S O E
(BA E HAS P
-3 H
R IO ON TIPES
A P
C ENIONSAND
S T T
ASE NEC S
C ON
C