PREVENTIVE MAINTENANCE CHECKLIST - UPS( Uninterruptable Power System )
Division Sub-Category Activities
Visually check for liquid contamination from batteries and
1.1.1 capacitors 1.1.2 Inspection of electronic circuits and control cards 1.1.3 Check of output frequency 1.1.4 Visual inspection of grounding ELECTRICAL PORTION
Inspection and tightening of batteries’ interconnections, of
1.1.5 DC circuit and of AC input – output cables 1.1.6 Test UPS transfer switches, circuit breakers and maintenance bypasses. 1.1.8 Clean and vacuum UPS equipment enclosures. 1.1.9 Inspection and monitoring of system’s alarms and LEDs 1.1.10 Check and measure of voltage reading of (input/output) 1.1.11 Check and measure of current reading of (input/output) 1.1.12 Inspection of loads normal distribution per phase Off-line load test the UPS system to ensure that the system 1.1.13 is completely functional. erruptable Power System ) Date:
Frequency Comments / Status After 2 After 4 After 6 Months Month Month