PFD : Stator Assembly Line (Day Shift)

SECOP process

Process added after


SECOP
Manual Roll
Preparing & Process added after
Loading ARETE

NIDE Manual Stack Making Stack Making &


& Insulation Paper Inserting Insulation Paper
(CT-50s) Inserting (CT-17s)

Yahotec Main Winding Main Winding Inserting


Inserting (CT-14s)
(CT-55s)

Main Forming
(CT-13s)

Phase Separator Insert

Yahotec Aux Winding Inserting Auxiliary Winding Inserting


(CT-52s) (CT-13s)

Auxiliary Forming
(CT-11.39s)

Crimping Machine Crimping Machine Crimping Machine


1 (CT-30s) 2 (CT-50s) 3 (CT-50s)

Final Forming
(CT-12s)

Lacing
Lacing Machine 1 Lacing Machine 2 Lacing Machine 3 Machine 4
(CT-44s) (CT-44s) (CT-44s) (CT-54.25s)

Visual Checking 1

ID Rolling (CT-8s)
Required Manpower 25
ABC Pressing (CT-10s)

Vacuum Surge testing


(CT-13s)

Sorting
Rechecking all damage
Manual from V.C.1 and checking
Walpha
Packing of damages (Insulation paper
Internal Assembly Stator Delivery damage, up-down & rotate ,
Finished
Delivery Wire damage, connector
Stators damage from ABC press
checking) coming from the
process after V.C.1 .
PFD : Stator Assembly Line (Night Shift)

Manual Roll
Preparing &
Loading

NIDE Manual Stack Making Stack Making &


& Insulation Paper Inserting Insulation Paper
(CT-50s) Inserting (CT-17s)

Yahotec Main Winding Main Winding Inserting


Inserting (CT-14s)
(CT-55s)

Main Forming
(CT-13s)

Phase Separator Insert

Yahotec Aux Winding Inserting Auxiliary Winding Inserting


(CT-52s) (CT-13s)

Auxiliary Forming
(CT-11.39s)

Crimping Machine Crimping Machine Crimping Machine


1 (CT-30s) 2 (CT-50s) 3 (CT-50s)

Final Forming
(CT-12s)

Lacing
Lacing Machine 1 Lacing Machine 2 Lacing Machine 3 Machine 4
(CT-44s) (CT-44s) (CT-44s) (CT-54.25s)

Visual Checking 1

Required Manpower 8
ID Rolling (CT-8s)

ABC Pressing (CT-10s)

Vacuum Surge testing


(CT-13s)

Sorting

Manual
Walpha
Packing of
Internal Assembly Stator Delivery Finished
Delivery Stators