Installation of S-50 in Ammonia Plants

Method · June 2021


DOI: 10.13140/RG.2.2.33710.64327

CITATIONS READS
0 616

1 author:

Prem Baboo
The Institution of Engineers (India)
102 PUBLICATIONS 34 CITATIONS

SEE PROFILE

Some of the authors of this publication are also working on these related projects:

Comparison Stamicarbon Saipem View project

Silo (UREA) level measurement View project

All content following this page was uploaded by Prem Baboo on 25 June 2021.

The user has requested enhancement of the downloaded file.


www.researchgate.net 25th June 2021
Research Gate is an academic social networking site

Installation of S-50 in Ammonia Plants


By
Prem Baboo
DGM (Production & Process)

Abstract
Installation of S-50 ammonia synthesis converter and increase in the conversion per pass can also
along with waste heat boiler in downstream of be achieved with the replacement of the S-200
existing S-200 ammonia synthesis converter is
one of the major schemes of Energy Saving With a three-bed radial flow converter with two
Project of Ammonia plant. The energy saving internal heat exchangers. To enable the HP
reported 0.18 G.Cal/T of Ammonia. Several steam production, Topsoe has recognized the
ammonia plants have installed an additional following modifications in the existing ammonia
ammonia synthesis converter in combination synthesis converter configurations. According to
with a HP steam waste heat boiler, downstream Topsoe, The introduction of S-50 converter
of the existing ammonia converter. The result is along with S-200 converter in the existing plants
increased conversion per pass, reduced as shown in the figure-2. The purified synthesis
compression requirements due to the smaller gas contains a small amount of impurities,
recycle gas stream, and improved waste heat mainly the inert Ar and CH4. To avoid an up
recovery. Among the methodologies aimed at concentration of inert, continuous purge from
finding energy saving opportunities, pinch the synthesis loop would be required. The
analysis linked to power and steam modeling has ammonia synthesis loop has been designed for a
proved to be a powerful way for determining maximum pressure of 245 kg/cm2g. The normal
projects to improve the overall energy efficiency operating pressure will be 200 kg/ cm2g.
of industrial sites. This procedure has been depending on load and catalyst activity. The
applied successfully in many industrial facilities, normal operating temperatures will be in the
allowing optimal energy recovery in the process range of 360 to 525 °C for the 1st bed and 370 to
and hence reduction of fuel consumption. 460°C for the 2nd bed. The heat liberated by the
Keywords reaction is utilized for high pressure steam
Converter, S-50, Ammonia, Energy, waste heat production in the loop waste heat boiler, E 3501
boiler.Revamp. and preheat of high pressure boiler feed water.
Introduction The make-up synthesis gas flow, which is in the
The Topsoe S-250 system uses two radial flow range of 176693 Nm2h, leaves the make-up
converters placed in series with waste heat synthesis compressor group at 200 kg/cm2g and
boilers between the converters and after the last 39°C.The make-up synthesis gas is further
converter (see Figure). This system compared to cooled in the make-up gas chiller, E 3514,
the S-200 series (employing one converter) is giving an outlet temperature of about 22°C.
claimed to increase the conversion per pass and The mixing of make-up synthesis gas and
reduce the energy use. Similar energy savings circulating synthesis gas takes place between the

This is an open access article, Research Gate is a European commercial social networking site for scientists and researchers .
www.researchgate.net 25th June 2021
Research Gate is an academic social networking site

first ammonia chiller, E 3506, and the second Hydrogen: 51.8 mole %
ammonia chiller, E 3507 The addition decreases Nitrogen: 17.2 mole %
the temperature of the mixture to about 18°C, Ammonia: 21.0 mole %
due to part evaporation of the ammonia already Methane: 6.7 mole %
condensed. The final condensing takes place in Argon: 3.3 mole %
the second ammonia chiller, where the gas/liquid Cooling of Converter Effluent Gas:
mixture is cooled to about 12°C . The The converter effluent gas is cooled in six steps
gas/liquid mixture is separated in the ammonia before purge gas removal, make-up synthesis
separator, B 3501. and during normal operation gas addition and final condensing of ammonia.
about 645915 Nm2/h of synthesis gas leaves the The purpose of the cooling taking place in the
top as recalculating gas and about 83272 Nm2/h first five heat exchangers, is
(62377 kg/h) of liquid ammonia leaves the 1. to recover waste heat for HP
bottom. The approximate converter inlet gas steam production and BFW
composition is shown below. preheat
Hydrogen: 64.2 mole % 2. to preheat the converter inlet gas
and
Nitrogen: 21.4 mole % 3. to save refrigeration energy in
Ammonia: 5.6 mole % the ammonia chillers.
4. The converter effluent gas
Methane: 5.9 mole % passes the tube side of the six
heat exchangers and the
Argon: 2.9 mole % anticipated cooling temperatures
are shown as:
100.0 mole % (mole weight: 10.29)
Heat Exchanger Temperature °C
The main inlet flow to the converter, R 3501, is E 3501 Loop Waste Heat Boiler 456/350 °C
introduced through two inlet nozzles at the
E 3502 BFW Pre heater 350/269 °C
bottom. The inlet gas passes up through the
annular space between the pressure shell and the E 3503 Hot Heat Exchanger 269/61 °C
insulated basket, and thereby the pressure shell
is kept relatively cool.The temperature profile of E 3504 Water Cooler 61/38 °C
the shell may be followed by the eleven
E 3505 Cold Heat Exchanger 38/28 °C
thermocouples mounted on the shell to ensure
that the design temperature of the pressure shell E 3506 First Ammonia Chiller 28/23 °C
(370°C) is never exceeded.The approximate
composition of the converted gas is

This is an open access article, Research Gate is a European commercial social networking site for scientists and researchers .
www.researchgate.net 25th June 2021
Research Gate is an academic social networking site

Fig-1

This is an open access article, Research Gate is a European commercial social networking site for scientists and researchers .
www.researchgate.net 25th June 2021
Research Gate is an academic social networking site

Fig-2

Fig-3

This is an open access article, Research Gate is a European co


commercial
mmercial social networking site for scientists and researchers .
www.researchgate.net 25th June 2021
Research Gate is an academic social networking site

Fig-4

This is an open access article, Research Gate is a European co


commercial
mmercial social networking site for scientists and researchers .
www.researchgate.net 25th June 2021
Research Gate is an academic social networking site

Fig-5
Detail Installation of S-50

Fig-6 Fig-7

Operating conditions

Inlet Gas
o
Temperature C 366
Pressure Kg/cm2 177
Total flow Nm3/hr 550,656
Composition
H2 Vol% 52.72
N2 Vol% 17.57
Inerts, CH4 + Vol% 9.69
NH3 Vol% 20.02
Outlet Gas
o
Temperature C 419
Pressure Kg/cm2 176
Total flow Nm3/hr 531,482
Composition
H2 Vol% 49.21
N2 Vol% 16.40
Inerts, CH4 + Vol% 10.04
6

This is an open access article, Research Gate is a European commercial social networking site for scientists and researchers .
www.researchgate.net 25th June 2021
Research Gate is an academic social networking site

NH3 Vol% 24.35


Table- 1 Fig-8

Fig-9
Catalyst
Type KM1
Size mm 1.5-3
Diameters, OD (effective)/ ID mm 2,896 / 760
Height (excl./incl. bottom cone part) m 20,100 / 21,200
Volume m3 125,4
Table-2
Mechanical Data (Pressure Vessel)
Type Vessel with top manhole
Inner diameter mm 3,000
Inner length (T-T) mm 20,250
Normal operating pressure Kg/cm2 g 177
Design pressure Kg/cm2 g 245
Hydrogen partial pressure, design Kg/cm2 130
Temperature of Operating Design
o
Cover and cylinder part C 366 430
o
Spherical bottom C 366 430
o
Bottom forging C 419 450
o
Bottom flange C 419 450
Nozzle sizes
Main inlet inch 16
outlet inch 16
Table-3
7

This is an open access article, Research Gate is a European commercial social networking site for scientists and researchers .
www.researchgate.net 25th June 2021
Research Gate is an academic social networking site

Installation of S-50 ammonia synthesis converter one of the major scheme of Energy Saving
along with waste heat boiler in downstream of Project of Ammonia plant.
existing S-200 ammonia synthesis converter is

units Design Design


Parameters Line-II Line-I Line-I Line-II
Conveter inlet flow Nm³/h 658400 766490 656158 645915
Make up gas flow Nm³/h 184520 185800 179904 182780
HG from PGR Nm³/h 0 7160 0 0
Converter Feed comp.
H2 vol% 0.6419 0.6258 0.6415 0.6424
N2 vol% 0.1974 0.2185 0.2132 0.2141
NH3 vol% 0.0450 0.0450 0.0578 0.0559
Ar vol% 0.0327 0.0303 0.0287 0.0291
CH4 vol% 0.0830 0.0804 0.0588 0.0584
Converter outlet
comp. 1.00 1.00 1.00 1.00
H2 vol% 0.5195 0.5118 0.5184 0.5173
N2 vol% 0.1575 0.1706 0.1721 0.1724
NH3 vol% 0.1860 0.1870 0.2094 0.2100
Ar vol% 0.0385 0.0358 0.0329 0.0333
CH4 vol% 0.0985 0.0949 0.0672 0.0670
1.00 1.00 1.00 1.00
Conerter inlet pressure kg/cm²g 179.80 195.40 220.00 220.00
Conerter outlet pressure kg/cm²g 178.00 193.40 216.00 216.00
Pressure Drop kg/cm²g 2.00 2.00 4.00 2.00
Ist Bed Temperature
Inlet °C 364.00 363.50
Outlet °C 491.00 498.50
IInd Bed Temperature
Inlet °C 355.00 387.60
Outlet °C 435.00 436.70 457.00 456.00
Table-4

Pre shutdown activity

This is an open access article, Research Gate is a European commercial social networking site for scientists and researchers .
www.researchgate.net 25th June 2021
Research Gate is an academic social networking site

Fig-10
grouting after removal of template.
After completion of steel cage of top portion of
civil foundation of S-50 ammonia synthesis Skirt were placed on foundation and leveled at
converter, anchor bolts were position with the elevation of 106.200 mtr. with the help of MS
help of template and clearance given for further plats on 27.07.2011and gaps between base plate
civil job. Shrinkom-20 were used for pockets of skirt and civil foundation were filled by
Shrinkom-20.

Fig-11

S-50 ammonia synthesis converter were placed enclosed. After opening of top cover and outer
and leveled / centered on skirt with the help of screen panel covers, joint inspection was done
Demag CC2800-1and CC2000 crane on by NFL / HTAS to check any damage during
05.08.2011. Erection plan submitted by M/s transportation / erection and found Ok. Lot of
Sarens Heavy Lift India Pvt. Ltd., party engaged rust as scale was found on inside surface of
by piping & equipment erection contractor (M/s reactor which was vacuum cleaned before
Satnam Global Infra projects Ltd., Delhi) for catalyst loading.
heavy equipment erection along with cranes is
9

This is an open access article, Research Gate is a European commercial social networking site for scientists and researchers .
www.researchgate.net 25th June 2021
Research Gate is an academic social networking site

Fig-12
After inspection, catalyst was charged with the After catalyst loading, outer screen panel cover
help of shower head from 27.01.2012 to boxed up and tack weld as instructed by HTAS.
30.01.2012 and balance from 08.02.2012 to Gland packing of stuffing box (centre screen and
12.02.2012. The approximate density of outer screen panel cover flange) checked and
catalyst achieved was 2.93 Kg/litre. During found OK. Top cover and bottom cover were
charging of catalyst, support provided for centre boxed up with the help of bolt tightening device
screen and outer screen panels were removed and lip seal welded with Inconel filler wire.
which was provided by the supplier to avoid any Insulation job of S-50 Ammonia synthesis
damage while transit. converter (160.0 mm thick) and connecting pipe
line job done by M/s Kaefer Punj Lloyd Limited.
S-50 Loop a philosophy below 220 HB. Instrumentation, Electrical and
• Higher conversion 35.5 % as compared Structure job were taken care by respective
to 28.3% in S-200 department.
• Ammonia concentration at the outlet of
S-50 = 24.35% as compare to 20.02% in
Ammonia Synthesis shut down pre-
S-200 conditions
• Lower circulation rate as compared to S- Front end load has been reduced to 60% of the
200 for same load normal capacity. Loop pressure is reduced to
• Higher steam generation 82 T/hr as 130 to 150 g/cm2. Recycle gas lined up from line
compared to 70 T/hr in S-200 I. Cut off purge gas to reformer fuel. 35TV4
Shutdown Activities taken on manual and its position is fixed at
desired level to control the converter bed
All the prefabricated pipelines were hydrotest at temperature.343HV609 closed & anti surge
367.5 Kg/cm2 before hookup with existing valve 343HV615 opened. Reduce the BFW flow
header and S-50 converter. RT of the all weld to E3502 by adjusting 32HV32 . Stop make up
joint done on half weld and UT at full weld joint to loop . Close compressor suction valve,
of pipe line. Stress reliving of alloy steel pipe 343HV601. Check that venting is shifted to
weld joint (2.25Cr 1Mo steel) was done as per 33PV62.Stop the purge gas flow by closing
ASME section and Hardness was achieved

10

This is an open access article, Research Gate is a European commercial social networking site for scientists and researchers .
www.researchgate.net 25th June 2021
Research Gate is an academic social networking site

35FIC31 . Close 35LIC22 & block level in B3501. Block the ammonia chillers
level & B3510 level. Refrigeration compressor Pre-Conditions
is to be kept running. Watch the converter shell LT Shift section & Methanation section
temp. (Design temp. = 370 0C).If it increases, shutdown has already been taken.PG venting has
open the converter inlet valve 35HV1 full been shifted to 33PV60.Surplus gas to reformer
&close the cold shot 35TV4.Prepare for start up fuel is cut off. Reduce the GV solution
of synthesis section after rectifying tripping circulation rate to 80% of the design capacity.
cause. Decrease the flow of PG to F3303 by partly
Shut Down for Installation S-50 opening 33HV25.Close 33HC21 there-by
At loop pressure around 130 to 150 kg/cm2, shifting the venting on 33PV61 &33HV25. Keep
interrupt make up gas flow to the loop. Catalyst F3303 under pressure at 15 - 20 kg/cm2 by
cooling is started by increasing the circulation putting that set point on 33PV60.If pressure
flow. Cooling rate to be maintained to 50 0C/hr could not be maintained open NG to absorber.
maximum. When the catalyst is cooled down to If 33LRC4 level shows a rising trend, then
50 0C, the compressor is shut down. check that transfer some of the level to T3301 through
inlet & outlet valves closed in field. During P3304. As the CO2 flow through F3302 has
cooling down, the BFW pre heater, E3502 & decreased considerably, stop CO2 blower &
loop boiler, E3501 are isolated. Depressurize F3302 pressure is controlled on 33PV24. Inject
loop to 60 kg/cm2. Drain B3501 completely, nitrogen, if required. Regenerate the solution
Drain the liquid inventory in ammonia chillers & for at least 4 hours or till the F/C of the solution
accumulators in B3510 & send it to storage via. comes below 0.17.with process gas heat through
B3503.Stop refrigeration compressor. The BFW E3302A/B. Maintain venting at 33HV25 as per
pre heater, E3502 & loop boiler, E3501 are the heat requirement in E3302A/B.
depressurized before the loop depressurization. Depressurize F3301 progressively on 33PV33 &
Depressurize loop through 35FV31. Reduce the 33PV29.Close 33HV25, there taking total
loop pressure to 1 to 3 kg/cm2 venting on 33PV61. Complete the regeneration
through the heat input from E3302A/B. Stop
Methanation Section
the motive steam to ejector X3301 and overhead
Normal Shut Down
condensate feed to E3303.Open the local vent.
Reduce the heat input to R3311 by slowly
Increase the temp. of lean solution on 33TIC24 .
closing 33TRC60. Cool the catalyst @ 80
0 Transfer solution from F3301 to T3301 through
C/Hr. by process gas. When all the temp are
the pump P3304.Stop the aeration & GV
around 150 0C, the process gas flow to R3311 is
filtration unit .Drain all the solution lines &
stopped by activating IS6 thus closing
towers to T3301Isolate, drain, purge & wash the
33USV161. Purge the reactor with nitrogen &
solution pumps .Depressurize F3303, purge with
keep it under nitrogen pressure. In normal case
nitrogen. Also purge the solution line to F3301
purge & keep the methanator under nitrogen
top. Depressurize; purge the towers F3301 &
pressure in hot condition.
F3302 with nitrogen .Maintain GV solution
GV Section Normal Shut down temp. in T3301 at 50-60 0C.
It includes three main steps:
1. Plant capacity reduction to 40%. Start the GV solution in close loop
2. Effective shutdown of plant. T3301P3305 A3301 A3302 A3303 
3. Depressurizing, draining & Purging T3301

11

This is an open access article, Research Gate is a European commercial social networking site for scientists and researchers .
www.researchgate.net 25th June 2021
Research Gate is an academic social networking site

GV Section Start up procedure conditions Startup after long S/D, in which major welding
job done in the reboiler & GV towers
.
Isolate F3303 (close 33HC21), close I/V at 72 hours , checking the column pressure,
methanator I/L, Close 33LIC20 & it’s solution concentration & temp. Analyze the
I/V.33HV25 kept opened. All solution line solution for K2CO3 & V2O5 every 8 hours. Add
drains, tower drains, level gauge’s drains, V2O5, if it falls below 0.3% w/w.. Normally
sample connection drain’s closed. F3303, solution concentration should remain constant.
F3302, F3301 purged with nitrogen. Analyze for At the end of the operation stop steam flow to
oxygen contents, it should be below 0.1%. E3302A/B. When the solution cools down to
Plant Passivation 105 0C, depressurize F3301 & F3302 to 0.05
Plant passivation is done for provide the kg/cm2g.
protective layer of OF V2O5 on the metal Passivation after Long Shut down
surface. Regenerated GV solution stored in T3301 is
Static Passivation used for this passivation. V2O5 concentration
It is done for passivation in Re boilers. should not be lower than 40% of total vanadium.
Prepare 23.5% K2CO3 & 0.4% V2O5 solution . F3301 & F3302 are pressurized with N2 at 0.05
F3301 bottom is filled up with solution so that kg/cm2g. Adjust E3302 heating quench MP
E3302A/B, with solution inlet & steam outlet steam pressure at 6 to 7 kg/cm2g and temp at 140
0
pipes are completely filled, up to the reboiler C so that F3301 & F3302 bottom temp. 105 0C
take off trey to allow solution to flow by gravity, maximum. Continue this operation for next 36
by means of P3305 feeding solution from hours, checking the column pressure, solution
T3301. Pressurize F3301 with nitrogen to 1.7 concentration & temp . Analyze the solution for
kg/cm2g . Start solution heating with quench K2CO3 & V2O5 every 8 hours. Add V2O5, if it
MP steam injection to E3302A/B (Temp. is falls below 0.3% w/w. Normally solution
maintained at 130-140 0C) .Start solution heating concentration should remain constant.
with quench MP steam injection to E3302A/B Start up GV solution Circulation
(Temp. is maintained at 130-140 0C) . Analyze Pressurize F3303 with natural gas up to 3
the solution for K2CO3 & V2O5 every 8 hours. kg/cm2. Start the pump MP3302B & start
Add V2O5, if it falls below 0.3% w/w.. Normally filling F3301through with flow approx..150 to
solution concentration should remain constant. 175 T/hr. Start the pump MP3302B & start
filling F3301through with flow approx..150 to
Dynamic Passivation
175 T/hr. Put 33LIC9 in operation & stabilize
Avoiding the presence of process gas &
level in all the three towers. Put 33LIC7 in
pressurizing F3303 with recycle gas up to 15
operation. 33FIC23 flow may be increased to
kg/cm2g.Pressurize F3301 & F3302 at 1.5
200 to 225 T/hr. When normal level appears in
kg/cm2g with nitrogen. Maintain solution flow
33LIC7, lined up MP3301C & start the pump.
rates 33PIC22 = 1500 T/hr &33PIC23 = 275
Take 33FIC22 in operation at1200 T/hr. flow
T/hr. Adjust E3302 heating quench MP steam
rate. Stabilize the levels. Take 33FIC1 in
pressure at 6 to 7 kg/cm2 and temp at 140 0C so
operation. Continue circulation, maintaining the
that solution at F3301 & F3302 bottom should
levels. Section is now ready for introduction of
not boiled off.. Maintain the heating rate of 10-
process gas. Heating of circulation GV
15 0C.& F3301 & F3302 bottom temp. 110-115
0 solution with MP steam. Heat up the line by
C maximum. Continue this operation for next
12

This is an open access article, Research Gate is a European commercial social networking site for scientists and researchers .
www.researchgate.net 25th June 2021
Research Gate is an academic social networking site

opening 33HV116, maintaining pressure about Pressurize R3311 by slowly opening 33USV161
6-7 kg/cm2. Lined up 33TIC5 maintaining U/S I/V. at the rate of 1kg/cm2/min. Heating is
temp. of heating steam as per requirement started through 33HIC74. In case the catalyst
&introduce steam to E3302A/B. Put level bed is having temp.,R3311 top vent 33HIC63 is
controller 33LIC21 in operation . Maintain to be opened initially so that bed should not get
heating rate of 10 to15 0C/hr. Maintain P3302 cooled .Maintain the heating @ 50 0C/hr.
suction temp at 70 0C by lining up of DM water 33TRC60 temp. can be increased either by
to E3306. Take E3307 & E3308 in operation. passing the process gas through E3209 &
Start the condensate pumps P3308 & P3321.Put controlling 33TV60-1 through 33HIC62 . Or by
the level controllers 33LIC31, 33LIC34, putting 33TRC60 on auto. Keep 33TV60-2
33LIC37 in operation. Start the condensate close. Reaction will start at the temp. above
pumps P3308 & P3321.Put the level controllers 220-250 0C. Continue heating up to 290 0C at
33LIC31, 33LIC34, 33LIC37 in operation. 33TRC60.Stabilize the temps in the bed.Analyze
K3301 is kept isolated & 33PV26 is kept closed. the R3311 O/L sample for CO & CO2 contents,
The overhead gases from F3302 venting through when these contents come below 5 ppm. , shift
33PV24 controlling on auto . Take level in the venting at 33PIC62. The process gas is now
E3303 through 33LIC6.Keep the local vent open available for feeding in the synthesis
at E3303 top. Check the temp. profile in the compressor.
towers .F3301 & F3302. When the bottom temps Ammonia Synthesis Section start up
of F3301& F3302 are stabilized, section is
with use of Start up pre heater.
ready.
Take level in B3510 from storage tank. Transfer
Introduction of Process gas level to E3506, E3514 & E3507 through level
Set 33PIC60 at a pressure 2 kg/cm2 less than PG controllers. Take level in B3503 through
pressure at LT shift downstream.(about 20 35FIC30. Also fill the ammonia chillers to 60%
kg/cm2). Open bypass of 33HC21 & pressurize level. B3503 lined up to B3504 . Transfer level
F3303 to about 20 kg/cm2.Open33HC21 full & to E3506, E3514 & E3507 through level
close 33HIC25 gradually, thus shifting venting controllers. Take level in B3503 through
on 33PIC60 (Reset 33HC21 in IS1 & IS5.). In 35FIC30. Also fill the ammonia chillers to 60%
parallel to above activity, line up ejector X3301. level. B3503 lined up to B3504 . BFW level is
Progressively stabilize the operation by taken in E3501, vent valve opened & close
maintaining the tower pressures. Start K3301 & 35FV1, 35HV3, 32HV32. Start synthesis
adjust anti-surge valve. CO2 venting is now compressor with anti surge valves open &
totally shifted to 33PIC33-1, 2. Check that CO2 discharge valves closed. Check that balancing
slip from F3303 is within range; adjust solution valve 343HV610 is opened. Start synthesis
flow to the towers. compressor with anti surge valves open &
Methanation Section Start up Procedure discharge valves closed. Check that balancing
Purge the methanator with nitrogen given valve 343HV610 is opened. Open 35HV1
through permanent line. Insert blind in nitrogen &343HV614 by 10%. Check that circulation is
line. Open the methanator inlet I/V’s bypass established across heater, indicated by 35PDI4.
valve (U/S of 33USV161) & drain the Switch on the heater. Check for gas temp O/L
condensate from the line. Again close the heater at 35TI41. Start to increase temp. of
bypass. Open 33HIC164. 33HIC165 to be kept circulating gas by increasing heater load . With
close. Reset IS6, thus opening 33USV161. circulator anti surge valve full open, circulation
13

This is an open access article, Research Gate is a European commercial social networking site for scientists and researchers .
www.researchgate.net 25th June 2021
Research Gate is an academic social networking site

is increased by opening 35HIC14. Increase the anti-surge valve & increasing the make up
bed temp. @ 30 to 50 0C/hr. maximum. flow.Maintain the bed inlet temp. by 35TV3&4.
Increase the bed temp. @ 30 to 50 0C/hr. Parameters Affecting Performance
maximum. When the reaction is started, slowly
of the Loop
decrease the heater load & cut off the heater. At
• Gas Composition
full circulation rate, maintain catalyst temp. by
• Ammonia Concentration at Converter
putting 35TIC4 on auto. Maintain the loop
Inlet
pressure by increasing the make gas flow @ 10
• Inert gas level
to 20 kg/cm2/hr. Normalize the boiler. Close
• H2 / N2 Ratio
local vent, open the BFW feed valve & maintain
• Reaction Temperature
E3502 temp. by opening 32HV32. Start
• Circulation Rate
refrigeration compressor**(If possible start it
• Operating pressure
before syn section s/u.). When normal level is
• Product removal
built up in B3501, liquid ammonia will start
• Lower compressor power due to less
flowing from B3501 to B3502 through 35LV22 .
circulation
The gas flashed off in B3502 is send to E3508 &
• Possible to achieve higher plant load
pressure is maintained at 25 kg/cm2. The gas
with same equipments
flashed off in B3502 is send to E3508 &
• Low loop pressure drop due to less flow
pressure is maintained at 25 kg/cm2. E3510
taken in operation. Inert gas flow can be Advantages of addition of S-50
established on 35FIC40 through E3509. Loop
Start up with out start up Heater • Higher conversion 35.5 % as compared
Keep 35TV3, 35TV4 & I/V at heater inlet close. to 28.3% in S-200
35LV22 lined up. Equalize loop & compressor • Ammonia concentration at the outlet of
discharge pressure by opening bypass over S-50 = 24.35% as compare to 20.02% in
343FV607. Open 343HV608/ 609 of S-200
recirculation. Open 35FV1 & 343HV 614 by • Lower circulation rate as compared to S-
10%. Maintain the circulation in loop so as to 200 for same load
increase the bed inlet temp. Open 343HV614 • Higher steam generation 82 T/hr as
slowly adjusting the circulation rate. Establish compared to 70 T/hr in S-200
BFW flow to E3502 & E3501. Steam generation • Lower compressor power due to less
from E3501 will also start with start of ammonia circulation
production .Increase loop pressure to normal by • Possible to achieve higher plant load
increasing speed of compressor , closing the with same equipments
• Low loop pressure drop due to less flow

Scheme Energy saving Yearly Saving Investment Payback Period


Gcal/Mt (NH3) (Rs.Crore / (Rs.Crores) (Years)
year)

Installation of S-50 0.18 8.226 32.36 3.9


converter and WHB

Table-5
14

This is an open access article, Research Gate is a European commercial social networking site for scientists and researchers .
View publication stats

www.researchgate.net 25th June 2021


Research Gate is an academic social networking site

Conclusion
In order to arrive at the most attractive revamp 2. Dybkjær, I., “Advances in
scheme it is of paramount importance that the Ammonia Con verter Design
scheme is optimized based on the objective and and Catalyst Loading”,
the specific conditions prevailing. The novel pre sented at the NITROGEN
revamp feature, the Haldor Topsøe ammonia ’97 Conference, Geneva,
synthesis convertor S-50 is an attractive Switzerland, Feb. 9-11, 1997
alternative for increasing the capacity of the 3. Nielsen S.E., Dybkjær I., ”Use of
reforming section in an ammonia plant. Adia batic Prereforming in
Ammonia Plants”, Ammonia
References Plant Safety & Related
1. How to Bring Existing Ammonia Facili ties, Vol. 37, AIChE,
Plants Up-to-Date by Svend Erik New York (1997)
Nielsen Haldor Topsøe A/S, 4. Manual for reduction of
Lyngby, Denmark and Peter KM1Loaded in S-50 convertor
Vang Christensen Haldor Topsøe with upstream S-200 convertor
A/S, Lyngby, online by Haldor Topsoe.
Denmark.Ammonia technical
manual 2004

15