RELIEF CASE IDENTIFICATION SCENARIO

Cause of Overpressure

Heat Exchanger Tube Rupture


Inadvertent Valve Opening

Check Valve Leakage

Control Valve Failure


Thermal Expansion
No. PSV Tag No. Location P&ID No. Remarks

Blocked Outlet

Power Failure
Gas Blowby
Overfilling
Fire Case
1 10-PSV-6001 Propane BOG Drum 10-D-203 (Jetty A) TTU2-10-DWG-10-0027-A3 √ 10-PSV-6001 will be designed based on Fire Case Screnario
10-PSV-6002 and 20-PSV-1101A are located at the same line at discharge 10-B-201
2 10-PSV-6002 Discharge of 10-B-202 TTU2-10-DWG-10-0027-A3 √
(proposed to delete one of them)
3 10-PSV-6101 Butane BOG Drum 10-D-303 (Jetty A) TTU2-10-DWG-10-0028-A3 √ 10-PSV-6101 will be designed based on Fire Case Screnario
10-PSV-6102 and 20-PSV-2101A are located at the same line at discharge 10-B-301
4 10-PSV-6102 Discharge of 10-B-302 TTU2-10-DWG-10-0028-A3 √
(proposed to delete one of them).
5 10-PSV-6201 Propane BOG Drum 10-D-204(Jetty B) TTU2-10-DWG-10-0029-A3 √ 10-PSV-6201 will be designed based on Fire Case Screnario
10-PSV-6202 will be designed based on Fire Case Screnario.
6 10-PSV-6202 Discharge of 10-B-203 TTU2-10-DWG-10-0029-A3 √ Blocked discharge is not considered as credible scenario since Blower 10-B-203 is a
centrifugal type blower.
7 10-PSV-6301 Butane BOG Drum 10-D-304(Jetty B) TTU2-10-DWG-10-0030-A3 √ 10-PSV-6301 will be design based on Fire Case Screnario
10-PSV-10-PSV-6302 will be designed based on Fire Case Screnario.
8 10-PSV-6302 Discharge of 10-B-303 TTU2-10-DWG-10-0030-A3 √ Blocked discharge is not considered as credible scenario since Blower 10-B-203 is a
centrifugal type blower.
20-PSV 1007A will be design based on Thermal Expansion Case.
9 20-PSV 1007A Discharge Header of Propane Recirculation Pump 20-P-205A/B/C TTU2-20-DWG-10-0035-A3 √ Blocked discharge is not considered as credible scenario since 20-P-205A/B/C is a
centrifugal type pump.
20-PSV 1007A will be designed based on Thermal Expansion Case.
10 20-PSV 2007A Discharge Header of Butane Recirculation Pump 20-P-305A/B/C TTU2-20-DWG-10-0036-A3 √ Blocked discharge is not considered as credible scenario since 20-P-305A/B/C is a
centrifugal type pump.
10-PSV-6002 and 20-PSV-1101A are located at the same line at discharge 10-B-202
11 20-PSV-1101A Discharge of 10-B-201 TTU2-20-DWG-10-0040-A3 √
(proposed to delete one of them)
10-PSV-6102 and 20-PSV-2101A are located at the same line at discharge 10-B-302
12 20-PSV-2101A Discharge of 10-B-301 TTU2-20-DWG-10-0041-A3 √
(proposed to delete one of them).
13 20-PSV-1101 Propane BOG Drum 20-D-201 (BOG Compressor 20-C-201A) TTU2-20-DWG-10-0039-A3 Sheet 1 of 3 √ 20-PSV-1101 will be designed based on Fire Case Screnario
14 20-PSV-2101 Butane BOG Drum 20-D-301 (BOG Compressor 20-C-301A) TTU2-20-DWG-10-0042-A3 Sheet 1 of 3 √ 20-PSV-2101 will be designed based on Fire Case Screnario

20-PSV 1102 will be designed based on Blocked discharge and Fire Case scenario. For fire
15 20-PSV 1102 Propane BOG Compressor 20-C-201A TTU2-20-DWG-10-0039-A3 sheet 1 of 3 √ √ case scenario, compressor volume is assumed same with pipe volume inlet to outlet
compressor package.

20-PSV 1103 will be designed based on Blocked discharge and Fire Case scenario. For fire
16 20-PSV 1103 Propane BOG Compressor 20-C-201A TTU2-20-DWG-10-0039-A3 sheet 1 of 3 √ √ case scenario, compressor volume is assumed same with pipe volume inlet to outlet
compressor package.

20-PSV 1104 will be design based on Blocked discharge and Fire Case scenario.
17 20-PSV 1104 Propane BOG Compressor 20-C-201B TTU2-20-DWG-10-0039-A3 sheet 2 of 3 √ √ For fire case scenario, compressor volume is assumed same with pipe volume inlet to
outlet compressor package.

20-PSV 1105 will be designed based on Blocked discharge and Fire Case scenario. For fire
18 20-PSV 1105 Propane BOG Compressor 20-C-201C TTU2-20-DWG-10-0039-A3 sheet 3 of 3 √ √ case scenario, compressor volume is assumed same with pipe volume inlet to outlet
compressor package.

20-PSV 1106 will be design based on Blocked discharge and Fire Case scenario.
19 20-PSV 1106 Propane BOG Compressor 20-C-201B TTU2-20-DWG-10-0039-A3 sheet 2 of 3 √ √ For fire case scenario, compressor volume is assumed same with pipe volume inlet to
outlet compressor package.

20-PSV 1107 will be designed based on Blocked discharge and Fire Case scenario. For fire
20 20-PSV 1107 Propane BOG Compressor 20-C-201C TTU2-20-DWG-10-0039-A3 sheet 3 of 3 √ √ case scenario, compressor volume is assumed same with pipe volume inlet to outlet
compressor package.

20-PSV 2102 will be designed based on Blocked discharge and Fire Case scenario. For fire
21 20-PSV 2102 Butane BOG Compressor 20-C-301A TTU2-20-DWG-10-0042-A3 sheet 1 of 3 √ √ case scenario, compressor volume is assumed same with pipe volume inlet to outlet
compressor package.

20-PSV 2103 will be designed based on Blocked discharge and Fire Case scenario. For fire
22 20-PSV 2103 Butane BOG Compressor 20-C-301A TTU2-20-DWG-10-0042-A3 sheet 1 of 3 √ √ case scenario, compressor volume is assumed same with pipe volume inlet to outlet
compressor package.

20-PSV 2104 will be designed based on Blocked discharge and Fire Case scenario. For fire
23 20-PSV 2104 Butane BOG Compressor 20-C-301B TTU2-20-DWG-10-0042-A3 sheet 2 of 3 √ √ case scenario, compressor volume is assumed same with pipe volume inlet to outlet
compressor package.

20-PSV 2105 will be designed based on Blocked discharge and Fire Case scenario. For fire
24 20-PSV 2105 Butane BOG Compressor 20-C-301C TTU2-20-DWG-10-0042-A3 sheet 3 of 3 √ √ case scenario, compressor volume is assumed same with pipe volume inlet to outlet
compressor package.

20-PSV 2106 will be designed based on Blocked discharge and Fire Case scenario. For fire
25 20-PSV 2106 Butane BOG Compressor 20-C-301B TTU2-20-DWG-10-0042-A3 sheet 2 of 3 √ √ case scenario, compressor volume is assumed same with pipe volume inlet to outlet
compressor package.

20-PSV 2107 will be designed based on Blocked discharge and Fire Case scenario. For fire
26 20-PSV 2107 Butane BOG Compressor 20-C-301C TTU2-20-DWG-10-0042-A3 sheet 3 of 3 √ √ case scenario, compressor volume is assumed same with pipe volume inlet to outlet
compressor package.

- Blocked discharge in case of PCV-1109B mulfunction closed,


- IVO in case of PCV-1109A mulfunction open,

Note:
27 20-PSV-1107A Propane BOG Condensate Drum 20-D-202 (BOG Condensate Recovery) TTU2-20-DWG-10-0045-A3 Sheet 1 of 2 √ √ √ √ - Gas blowby is not considered as credible scenario (in case of PCV-1109A mulfunction
open, gas blowby will not occured if liquid level in 20-D-203 still above the low level). 20-
D-203 is also protected with Low and Low Low protection system to trip the pump.
- Overfilling is not considerd as credible scenario since 20-D-302 is protected with 20-
LIHH-1103 to trip BOG Compressor 20-C-201A/B/C.

- Blocked discharge in case of PCV-2109B mulfunction closed,


- IVO in case of PCV-2109A mulfunction open,

Note:
28 20-PSV-2107A Butane BOG Condensate Drum 20-D-302 (BOG Condensate Recovery) TTU2-20-DWG-10-0046-A3 Sheet 1 of 2 √ √ √ √ - Gas blowby is not considered as credible scenario (in case of PCV-2109A mulfunction
open, gas blowby will not occured if liquid level in 20-D-203 still above the low level). 20-
D-203 is also protected with Low and Low Low protection system to trip the pump.
- Overfilling is not considerd as credible scenario since 20-D-302 is protected with 20-
LIHH-2103 to trip BOG Compressor 20-C-301A/B/C.
29 20-PSV-1105B Propane BOG Condenser (20-E-201A) TTU2-20-DWG-10-0043-A3 √ √ The flowrate use as calculation basis is from shell side (Propane)
30 20-PSV-1106B Propane BOG Condenser (20-E-201B) TTU2-20-DWG-10-0043-A3 √ √ The flowrate use as calculation basis is from shell side (Propane)
31 20-PSV-1107B Propane BOG Condenser (20-E-201C) TTU2-20-DWG-10-0043-A3 √ √ The flowrate use as calculation basis is from shell side (Propane)
32 20-PSV-2105B Butane BOG Condenser (20-E-301A) TTU2-20-DWG-10-0043-A3 √ √ The flowrate use as calculation basis is from shell side (Butane)
33 20-PSV-2106B Butane BOG Condenser (20-E-301B) TTU2-20-DWG-10-0043-A3 √ √ The flowrate use as calculation basis is from shell side (Butane)
RELIEF CASE IDENTIFICATION SCENARIO

Cause of Overpressure

Heat Exchanger Tube Rupture


Inadvertent Valve Opening

Check Valve Leakage

Control Valve Failure


Thermal Expansion
No. PSV Tag No. Location P&ID No. Remarks

Blocked Outlet

Power Failure
Gas Blowby
Overfilling
Fire Case
34 20-PSV-2107B Butane BOG Condenser (20-E-301C) TTU2-20-DWG-10-0043-A3 √ √ The flowrate use as calculation basis is from shell side (Butane)
35 30-PSV-4101 Instrument Air Receiver TTU2-30-DWG-10-0060-A3 √ 30-PSV-4101 will be design based on Fire Case Screnario
36 30-PSV-4102 Plant Air Receiver TTU2-30-DWG-10-0060-A3 √ 30-PSV-4102 will be design based on Fire Case Screnario
37 30-PSV-4201 Nitrogen Gas Receiver TTU2-30-DWG-10-0061-A3 √ 30-PSV-4201 will be design based on Fire Case Screnario

40-PSV-401A/B will be designed based on Fire Case Scenario.


38 40-PSV-401A HAP Tank (40-T-401) TTU2-50-DWG-10-0053-A3 √ √ √
Note:
- Blocked discharged is not considered as credible scenario. in case of 40-SDV-405
mulfunction close, the overpressure will not occured since 40-T-401 is equipped with
high high level protection (40-LICHH-401) that will close the inlet at 40-SDV-401/403.
- Overfilling is not considered as credible scenario. Continuous filling will not occured
39 40-PSV-401B HAP Tank (40-T-401) TTU2-50-DWG-10-0053-A3 √ √ √ since 40-T-401 is equipped with high high level protection (40-LICHH-401) that will close
the inlet at 40-SDV-401/403.

40-PSV-402A/B will be designed based on Fire Case Scenario.


40 40-PSV-402A HAP Tank (40-T-402) TTU2-50-DWG-10-0053-A3 √ √ √
Note:
- Blocked discharged is not considered as credible scenario. in case of 40-SDV-406
mulfunction close, the overpressure will not occured since 40-T-402 is equipped with
high high level protection (40-LICHH-402A) that will close the inlet at 40-SDV-402/404.
- Overfilling is not considered as credible scenario. Continuous filling will not occured
41 40-PSV-402B HAP Tank (40-T-402) TTU2-50-DWG-10-0053-A3 √ √ √ since 40-T-402 is equipped with high high level protection (40-LICHH-402A) that will close
the inlet at 40-SDV-402/404.

40-PSV-3101/40-PSV-3102 will be designed based on Fire Case and Control Valve failire.

Note:
42 40-PSV-3101 LPG Storage Tank (V-101) TTU2-40-DWG-10-0050-A3 Sheet 1 of 3 √ √ √ √ √ - Blocked Outlet 40-SDV-3102 & 40-SDV-3103 is not considered as credible scenario
since it will not cause overpressure at V-101 (in case 40-SDV-3103 close and continue
filling, high-high level will be triggered to close 40-SDV-3102 at inlet V-101 and trip to
C3/C4 Transfer Pump).
- overfilling scenario is not considered as credible scenario since V-101 is protected with
high high liquid protection 40-LIHH-3002B that will trip the liquid inlet source (C3/C4
transfer pump 20-P-203A/B and 20-P-303A/B).
- IVO 20-LCV-1102A & 20-LCV-2102A (gas blowby) is not considered as credible scenario
43 40-PSV-3102 LPG Storage Tank (V-101) TTU2-40-DWG-10-0050-A3 Sheet 1 of 3 √ √ √ √ √
since gas blowby will not occured if liquid level in 20-D-202/302 still above the low level).
20-D-202/302 is also protected with Low and Low Low protection system to trip the
C3/C4 condensate pump.

40-PSV-3103/40-PSV-3104 will be designed based on Fire Case and Control Valve failire.

Note:
44 40-PSV-3103 LPG Storage Tank (V-102) TTU2-40-DWG-10-0050-A3 Sheet 2 of 3 √ √ √ √ √
- Blocked Outlet 40-SDV-3105 & 40-SDV-3106 is not considered as credible scenario
since it will not cause overpressure at V-102 (in case 40-SDV-3106 close and continue
filling, high-high level will be triggered to close 40-SDV-3105 at inlet V-101 and trip C3/C4
Transfer Pump).
- overfilling scenario is not considered as credible scenario since V-102 is protected with
high high liquid protection 40-LIHH-3004B that will trip the liquid inlet source (C3/C4
transfer pump 20-P-203A/B and 20-P-303A/B).
- IVO 20-LCV-1102A & 20-LCV-2102A (gas blowby) is not considered as credible scenario
45 40-PSV-3104 LPG Storage Tank (V-102) TTU2-40-DWG-10-0050-A3 Sheet 2 of 3 √ √ √ √ √
since gas blowby will not occured if liquid level in 20-D-202/302 still above the low level).
20-D-202/302 is also protected with Low and Low Low protection system to trip the
C3/C4 condensate pump.

10-PSV-1001 will be designed based on Fire case, Blocked outlet and Thermal expansion
case.
46 10-PSV-1001 Propane Liquid Metering Jetty A (10-LM-201 A/B) TTU2-10-DWG-10-0048-A3 √ √ √
Note:
- fire case: pipe volume to be considered is from 80-SDV-6502 to 10-SDV-1005
- blocked outlet: SDV at jetty to FCV at metering
10-PSV-1001 will be designed based on Fire case, Blocked outlet and Thermal expansion
case.
47 10-PSV-2001 Butane Liquid Metering Jetty A (10-LM-301 A/B) TTU2-10-DWG-10-0049-A3 √ √ √
Note:
- fire case: pipe volume to be considered is from 80-SDV-6502 to 10-SDV-1005
- blocked outlet: SDV at jetty to FCV at metering
48 10-PSV-1111 Propane Suction Pump Header TTU2-10-DWG-10-0023-A3 √
49 10-PSV-1113 Butane Suction Pump Header TTU2-10-DWG-10-0024-A3 √
50 20-PSV-1008 Propane Transfer Pump (20-P-203 A/B) Discharge Header TTU2-20-DWG-10-0031-A3 √
51 20-PSV-1009 Butane Transfer Pump (20-P-303 A/B) Discharge Header TTU2-20-DWG-10-0032-A3 √
52 20-PSV-1002 Propane Unloading/Return Line to T-201 TTU2-20-DWG-10-0033-A3 Sheet 1 of 2 √ Propose to relocate 20-PSV-1002 to the hihest point at pipereck on bundwall area
53 20-PSV-1010 Propane Backloading Pump To Jetty A (20-P-206 A/B) Discharge Header TTU2-20-DWG-10-0033-A3 Sheet 1 of 2 √
54 20-PSV-1006 Propane Recirculation Return Line to T-201 TTU2-20-DWG-10-0033-A3 Sheet 2 of 2 √ Propose to relocate 20-PSV-1006 to the hihest point at pipereck on bundwall area
55 20-PSV-1011 Propane Backloading Pump To Jetty B (20-P-202 A/B) Discharge Header TTU2-20-DWG-10-0033-A3 Sheet 2 of 2 √
56 20-PSV-2006 Butane Unloading/Return Line to T-301 TTU2-20-DWG-10-0034-A3 Sheet 1 of 2 √ Propose to relocate 20-PSV-2006 to the hihest point at pipereck on bundwall area
57 20-PSV-2011 Butane Backloading Pump To Jetty A (20-P-306 A/B) Discharge Header TTU2-20-DWG-10-0034-A3 Sheet 1 of 2 √
58 20-PSV-2002 Butane Recirculation Return Line to T-301 TTU2-20-DWG-10-0034-A3 Sheet 2 of 2 √ Propose to relocate 20-PSV-2002 to the hihest point at pipereck on bundwall area
59 20-PSV-2010 Butane Backloading Pump To Jetty B (20-P-302 A/B) Discharge Header TTU2-20-DWG-10-0034-A3 Sheet 2 of 2 √
60 20-PSV-1012 Propane Truck Filling Pump (20-P-204 A/B) Discharge Header TTU2-20-DWG-10-0037-A3 √
61 20-PSV-1013 Butane Truck Filling Pump (20-P-304 A/B) Discharge Header TTU2-20-DWG-10-0038-A3 √
62 20-PSV-1109 Propane BOG Condensate Pump (20-P-201 A/B/C) Discharge Header TTU2-20-DWG-10-0045-A3 Sheet 2 of 2 √
63 20-PSV-2109 Butane BOG Condensate Pump (20-P-301 A/B/C) Discharge Header TTU2-20-DWG-10-0046-A3 Sheet 2 of 2 √
Thermal expansion case to accommodate idle fluid along the piping from Mixer M-401 to
64 40-PSV-3105 Outlet LPG Metering (40-M-401) to LPG Storage Tank (V-101/V-102) TTU2-40-DWG-10-0050-A3 Sheet 3 of 3 √
V-101/102 during LPG transfer directly to Jetty B/C
65 50-PSV-5001 LPG Liquid Truck Loading Arm (50-LA-001) TTU2-40-DWG-10-0054-A3 Sheet 1 of 3 √ √
66 50-PSV-5002 LPG Liquid Truck Loading Arm (50-LA-002) TTU2-40-DWG-10-0054-A3 Sheet 1 of 3 √ √
67 50-PSV-5003 LPG Liquid Truck Loading Arm (50-LA-003) TTU2-40-DWG-10-0054-A3 Sheet 2 of 3 √ √
68 50-PSV-5004 LPG Liquid Truck Loading Arm (50-LA-004) TTU2-40-DWG-10-0054-A3 Sheet 2 of 3 √ √
69 50-PSV-5005 LPG Liquid Truck Loading Arm (50-LA-005) TTU2-40-DWG-10-0054-A3 Sheet 3 of 3 √ √
RELIEF CASE IDENTIFICATION SCENARIO

Cause of Overpressure

Heat Exchanger Tube Rupture


Inadvertent Valve Opening

Check Valve Leakage

Control Valve Failure


Thermal Expansion
No. PSV Tag No. Location P&ID No. Remarks

Blocked Outlet

Power Failure
Gas Blowby
Overfilling
Fire Case
70 50-PSV-5006 LPG Liquid Truck Loading Arm (50-LA-006) TTU2-40-DWG-10-0054-A3 Sheet 3 of 3 √ √
71 50-PSV-5007 Propane Metering System for Truck Filling (50-TM-007) TTU2-50-DWG-10-0055-A3 √ √
72 50-PSV-5008 Butane Metering System for Truck Filling (50-TM-008) TTU2-50-DWG-10-0055-A3 √ √
73 60-PSV-6402 Inlet line of LPG Marine Loading Arm Jetty B (70-MLA-101) TTU2-70-DWG-10-0057-A3 √ √
74 70-PSV-6401 Inlet line of LPG Marine Loading Arm Jetty C (70-MLA-102) TTU2-70-DWG-10-0057-A3 √ √
75 70-PSV-6601 Inlet line of Propane Marine Loading Arm Jetty B (70-MLA-202) TTU2-70-DWG-10-0058-A3 √ √
76 70-PSV-6602 Inlet line of Butane Marine Loading Arm Jetty B (70-MLA-302) TTU2-70-DWG-10-0058-A3 √ √
77 80-PSV-6501 Inlet line of Propane Marine Loading Arm Jetty A (70-MLA-201) TTU2-70-DWG-10-0059-A3 √
78 80-PSV-6502 Inlet line of Butane Marine Loading Arm Jetty A (70-MLA-301) TTU2-70-DWG-10-0059-A3 √
RELIEF CASE IDENTIFICATION SCENARIO

Cause of Overpressure

Heat Exchanger Tube Rupture


Inadvertent Valve Opening

Check Valve Leakage

Control Valve Failure


Thermal Expansion
No. PSV Tag No. Location P&ID No. Remarks

Blocked Outlet

Power Failure
Gas Blowby
Overfilling
Fire Case
- fire case at T-201
79 10-PSV-1001 Propane Refrigerated Tank (T-201) R2 TTU2-10-DWG-10-0021-A3 √ √ √ - blocked outlet at PCV-1001,
- IVO FCV-101 (unloading case)
- fire case at T-201
80 10-PSV-1002 Propane Refrigerated Tank (T-201) R2 TTU2-10-DWG-10-0021-A3 √ √ √ - blocked outlet at PCV-1001,
- IVO FCV-101 (unloading case)
- fire case at T-301
81 10-PSV-2001 Butane Refrigerated Tank (T-301) R2 TTU2-10-DWG-10-0022-A3 √ √ √ - blocked outlet at PCV-2001,
- IVO FCV-101 (unloading case)
- fire case at T-201
82 10-PSV-2002 Butane Refrigerated Tank (T-301) R2 TTU2-10-DWG-10-0022-A3 √ √ √ - blocked outlet at PCV-2001,
- IVO FCV-101 (unloading case)