Cause of Overpressure
Blocked Outlet
Power Failure
Gas Blowby
Overfilling
Fire Case
1 10-PSV-6001 Propane BOG Drum 10-D-203 (Jetty A) TTU2-10-DWG-10-0027-A3 √ 10-PSV-6001 will be designed based on Fire Case Screnario
10-PSV-6002 and 20-PSV-1101A are located at the same line at discharge 10-B-201
2 10-PSV-6002 Discharge of 10-B-202 TTU2-10-DWG-10-0027-A3 √
(proposed to delete one of them)
3 10-PSV-6101 Butane BOG Drum 10-D-303 (Jetty A) TTU2-10-DWG-10-0028-A3 √ 10-PSV-6101 will be designed based on Fire Case Screnario
10-PSV-6102 and 20-PSV-2101A are located at the same line at discharge 10-B-301
4 10-PSV-6102 Discharge of 10-B-302 TTU2-10-DWG-10-0028-A3 √
(proposed to delete one of them).
5 10-PSV-6201 Propane BOG Drum 10-D-204(Jetty B) TTU2-10-DWG-10-0029-A3 √ 10-PSV-6201 will be designed based on Fire Case Screnario
10-PSV-6202 will be designed based on Fire Case Screnario.
6 10-PSV-6202 Discharge of 10-B-203 TTU2-10-DWG-10-0029-A3 √ Blocked discharge is not considered as credible scenario since Blower 10-B-203 is a
centrifugal type blower.
7 10-PSV-6301 Butane BOG Drum 10-D-304(Jetty B) TTU2-10-DWG-10-0030-A3 √ 10-PSV-6301 will be design based on Fire Case Screnario
10-PSV-10-PSV-6302 will be designed based on Fire Case Screnario.
8 10-PSV-6302 Discharge of 10-B-303 TTU2-10-DWG-10-0030-A3 √ Blocked discharge is not considered as credible scenario since Blower 10-B-203 is a
centrifugal type blower.
20-PSV 1007A will be design based on Thermal Expansion Case.
9 20-PSV 1007A Discharge Header of Propane Recirculation Pump 20-P-205A/B/C TTU2-20-DWG-10-0035-A3 √ Blocked discharge is not considered as credible scenario since 20-P-205A/B/C is a
centrifugal type pump.
20-PSV 1007A will be designed based on Thermal Expansion Case.
10 20-PSV 2007A Discharge Header of Butane Recirculation Pump 20-P-305A/B/C TTU2-20-DWG-10-0036-A3 √ Blocked discharge is not considered as credible scenario since 20-P-305A/B/C is a
centrifugal type pump.
10-PSV-6002 and 20-PSV-1101A are located at the same line at discharge 10-B-202
11 20-PSV-1101A Discharge of 10-B-201 TTU2-20-DWG-10-0040-A3 √
(proposed to delete one of them)
10-PSV-6102 and 20-PSV-2101A are located at the same line at discharge 10-B-302
12 20-PSV-2101A Discharge of 10-B-301 TTU2-20-DWG-10-0041-A3 √
(proposed to delete one of them).
13 20-PSV-1101 Propane BOG Drum 20-D-201 (BOG Compressor 20-C-201A) TTU2-20-DWG-10-0039-A3 Sheet 1 of 3 √ 20-PSV-1101 will be designed based on Fire Case Screnario
14 20-PSV-2101 Butane BOG Drum 20-D-301 (BOG Compressor 20-C-301A) TTU2-20-DWG-10-0042-A3 Sheet 1 of 3 √ 20-PSV-2101 will be designed based on Fire Case Screnario
20-PSV 1102 will be designed based on Blocked discharge and Fire Case scenario. For fire
15 20-PSV 1102 Propane BOG Compressor 20-C-201A TTU2-20-DWG-10-0039-A3 sheet 1 of 3 √ √ case scenario, compressor volume is assumed same with pipe volume inlet to outlet
compressor package.
20-PSV 1103 will be designed based on Blocked discharge and Fire Case scenario. For fire
16 20-PSV 1103 Propane BOG Compressor 20-C-201A TTU2-20-DWG-10-0039-A3 sheet 1 of 3 √ √ case scenario, compressor volume is assumed same with pipe volume inlet to outlet
compressor package.
20-PSV 1104 will be design based on Blocked discharge and Fire Case scenario.
17 20-PSV 1104 Propane BOG Compressor 20-C-201B TTU2-20-DWG-10-0039-A3 sheet 2 of 3 √ √ For fire case scenario, compressor volume is assumed same with pipe volume inlet to
outlet compressor package.
20-PSV 1105 will be designed based on Blocked discharge and Fire Case scenario. For fire
18 20-PSV 1105 Propane BOG Compressor 20-C-201C TTU2-20-DWG-10-0039-A3 sheet 3 of 3 √ √ case scenario, compressor volume is assumed same with pipe volume inlet to outlet
compressor package.
20-PSV 1106 will be design based on Blocked discharge and Fire Case scenario.
19 20-PSV 1106 Propane BOG Compressor 20-C-201B TTU2-20-DWG-10-0039-A3 sheet 2 of 3 √ √ For fire case scenario, compressor volume is assumed same with pipe volume inlet to
outlet compressor package.
20-PSV 1107 will be designed based on Blocked discharge and Fire Case scenario. For fire
20 20-PSV 1107 Propane BOG Compressor 20-C-201C TTU2-20-DWG-10-0039-A3 sheet 3 of 3 √ √ case scenario, compressor volume is assumed same with pipe volume inlet to outlet
compressor package.
20-PSV 2102 will be designed based on Blocked discharge and Fire Case scenario. For fire
21 20-PSV 2102 Butane BOG Compressor 20-C-301A TTU2-20-DWG-10-0042-A3 sheet 1 of 3 √ √ case scenario, compressor volume is assumed same with pipe volume inlet to outlet
compressor package.
20-PSV 2103 will be designed based on Blocked discharge and Fire Case scenario. For fire
22 20-PSV 2103 Butane BOG Compressor 20-C-301A TTU2-20-DWG-10-0042-A3 sheet 1 of 3 √ √ case scenario, compressor volume is assumed same with pipe volume inlet to outlet
compressor package.
20-PSV 2104 will be designed based on Blocked discharge and Fire Case scenario. For fire
23 20-PSV 2104 Butane BOG Compressor 20-C-301B TTU2-20-DWG-10-0042-A3 sheet 2 of 3 √ √ case scenario, compressor volume is assumed same with pipe volume inlet to outlet
compressor package.
20-PSV 2105 will be designed based on Blocked discharge and Fire Case scenario. For fire
24 20-PSV 2105 Butane BOG Compressor 20-C-301C TTU2-20-DWG-10-0042-A3 sheet 3 of 3 √ √ case scenario, compressor volume is assumed same with pipe volume inlet to outlet
compressor package.
20-PSV 2106 will be designed based on Blocked discharge and Fire Case scenario. For fire
25 20-PSV 2106 Butane BOG Compressor 20-C-301B TTU2-20-DWG-10-0042-A3 sheet 2 of 3 √ √ case scenario, compressor volume is assumed same with pipe volume inlet to outlet
compressor package.
20-PSV 2107 will be designed based on Blocked discharge and Fire Case scenario. For fire
26 20-PSV 2107 Butane BOG Compressor 20-C-301C TTU2-20-DWG-10-0042-A3 sheet 3 of 3 √ √ case scenario, compressor volume is assumed same with pipe volume inlet to outlet
compressor package.
Note:
27 20-PSV-1107A Propane BOG Condensate Drum 20-D-202 (BOG Condensate Recovery) TTU2-20-DWG-10-0045-A3 Sheet 1 of 2 √ √ √ √ - Gas blowby is not considered as credible scenario (in case of PCV-1109A mulfunction
open, gas blowby will not occured if liquid level in 20-D-203 still above the low level). 20-
D-203 is also protected with Low and Low Low protection system to trip the pump.
- Overfilling is not considerd as credible scenario since 20-D-302 is protected with 20-
LIHH-1103 to trip BOG Compressor 20-C-201A/B/C.
Note:
28 20-PSV-2107A Butane BOG Condensate Drum 20-D-302 (BOG Condensate Recovery) TTU2-20-DWG-10-0046-A3 Sheet 1 of 2 √ √ √ √ - Gas blowby is not considered as credible scenario (in case of PCV-2109A mulfunction
open, gas blowby will not occured if liquid level in 20-D-203 still above the low level). 20-
D-203 is also protected with Low and Low Low protection system to trip the pump.
- Overfilling is not considerd as credible scenario since 20-D-302 is protected with 20-
LIHH-2103 to trip BOG Compressor 20-C-301A/B/C.
29 20-PSV-1105B Propane BOG Condenser (20-E-201A) TTU2-20-DWG-10-0043-A3 √ √ The flowrate use as calculation basis is from shell side (Propane)
30 20-PSV-1106B Propane BOG Condenser (20-E-201B) TTU2-20-DWG-10-0043-A3 √ √ The flowrate use as calculation basis is from shell side (Propane)
31 20-PSV-1107B Propane BOG Condenser (20-E-201C) TTU2-20-DWG-10-0043-A3 √ √ The flowrate use as calculation basis is from shell side (Propane)
32 20-PSV-2105B Butane BOG Condenser (20-E-301A) TTU2-20-DWG-10-0043-A3 √ √ The flowrate use as calculation basis is from shell side (Butane)
33 20-PSV-2106B Butane BOG Condenser (20-E-301B) TTU2-20-DWG-10-0043-A3 √ √ The flowrate use as calculation basis is from shell side (Butane)
RELIEF CASE IDENTIFICATION SCENARIO
Cause of Overpressure
Blocked Outlet
Power Failure
Gas Blowby
Overfilling
Fire Case
34 20-PSV-2107B Butane BOG Condenser (20-E-301C) TTU2-20-DWG-10-0043-A3 √ √ The flowrate use as calculation basis is from shell side (Butane)
35 30-PSV-4101 Instrument Air Receiver TTU2-30-DWG-10-0060-A3 √ 30-PSV-4101 will be design based on Fire Case Screnario
36 30-PSV-4102 Plant Air Receiver TTU2-30-DWG-10-0060-A3 √ 30-PSV-4102 will be design based on Fire Case Screnario
37 30-PSV-4201 Nitrogen Gas Receiver TTU2-30-DWG-10-0061-A3 √ 30-PSV-4201 will be design based on Fire Case Screnario
40-PSV-3101/40-PSV-3102 will be designed based on Fire Case and Control Valve failire.
Note:
42 40-PSV-3101 LPG Storage Tank (V-101) TTU2-40-DWG-10-0050-A3 Sheet 1 of 3 √ √ √ √ √ - Blocked Outlet 40-SDV-3102 & 40-SDV-3103 is not considered as credible scenario
since it will not cause overpressure at V-101 (in case 40-SDV-3103 close and continue
filling, high-high level will be triggered to close 40-SDV-3102 at inlet V-101 and trip to
C3/C4 Transfer Pump).
- overfilling scenario is not considered as credible scenario since V-101 is protected with
high high liquid protection 40-LIHH-3002B that will trip the liquid inlet source (C3/C4
transfer pump 20-P-203A/B and 20-P-303A/B).
- IVO 20-LCV-1102A & 20-LCV-2102A (gas blowby) is not considered as credible scenario
43 40-PSV-3102 LPG Storage Tank (V-101) TTU2-40-DWG-10-0050-A3 Sheet 1 of 3 √ √ √ √ √
since gas blowby will not occured if liquid level in 20-D-202/302 still above the low level).
20-D-202/302 is also protected with Low and Low Low protection system to trip the
C3/C4 condensate pump.
40-PSV-3103/40-PSV-3104 will be designed based on Fire Case and Control Valve failire.
Note:
44 40-PSV-3103 LPG Storage Tank (V-102) TTU2-40-DWG-10-0050-A3 Sheet 2 of 3 √ √ √ √ √
- Blocked Outlet 40-SDV-3105 & 40-SDV-3106 is not considered as credible scenario
since it will not cause overpressure at V-102 (in case 40-SDV-3106 close and continue
filling, high-high level will be triggered to close 40-SDV-3105 at inlet V-101 and trip C3/C4
Transfer Pump).
- overfilling scenario is not considered as credible scenario since V-102 is protected with
high high liquid protection 40-LIHH-3004B that will trip the liquid inlet source (C3/C4
transfer pump 20-P-203A/B and 20-P-303A/B).
- IVO 20-LCV-1102A & 20-LCV-2102A (gas blowby) is not considered as credible scenario
45 40-PSV-3104 LPG Storage Tank (V-102) TTU2-40-DWG-10-0050-A3 Sheet 2 of 3 √ √ √ √ √
since gas blowby will not occured if liquid level in 20-D-202/302 still above the low level).
20-D-202/302 is also protected with Low and Low Low protection system to trip the
C3/C4 condensate pump.
10-PSV-1001 will be designed based on Fire case, Blocked outlet and Thermal expansion
case.
46 10-PSV-1001 Propane Liquid Metering Jetty A (10-LM-201 A/B) TTU2-10-DWG-10-0048-A3 √ √ √
Note:
- fire case: pipe volume to be considered is from 80-SDV-6502 to 10-SDV-1005
- blocked outlet: SDV at jetty to FCV at metering
10-PSV-1001 will be designed based on Fire case, Blocked outlet and Thermal expansion
case.
47 10-PSV-2001 Butane Liquid Metering Jetty A (10-LM-301 A/B) TTU2-10-DWG-10-0049-A3 √ √ √
Note:
- fire case: pipe volume to be considered is from 80-SDV-6502 to 10-SDV-1005
- blocked outlet: SDV at jetty to FCV at metering
48 10-PSV-1111 Propane Suction Pump Header TTU2-10-DWG-10-0023-A3 √
49 10-PSV-1113 Butane Suction Pump Header TTU2-10-DWG-10-0024-A3 √
50 20-PSV-1008 Propane Transfer Pump (20-P-203 A/B) Discharge Header TTU2-20-DWG-10-0031-A3 √
51 20-PSV-1009 Butane Transfer Pump (20-P-303 A/B) Discharge Header TTU2-20-DWG-10-0032-A3 √
52 20-PSV-1002 Propane Unloading/Return Line to T-201 TTU2-20-DWG-10-0033-A3 Sheet 1 of 2 √ Propose to relocate 20-PSV-1002 to the hihest point at pipereck on bundwall area
53 20-PSV-1010 Propane Backloading Pump To Jetty A (20-P-206 A/B) Discharge Header TTU2-20-DWG-10-0033-A3 Sheet 1 of 2 √
54 20-PSV-1006 Propane Recirculation Return Line to T-201 TTU2-20-DWG-10-0033-A3 Sheet 2 of 2 √ Propose to relocate 20-PSV-1006 to the hihest point at pipereck on bundwall area
55 20-PSV-1011 Propane Backloading Pump To Jetty B (20-P-202 A/B) Discharge Header TTU2-20-DWG-10-0033-A3 Sheet 2 of 2 √
56 20-PSV-2006 Butane Unloading/Return Line to T-301 TTU2-20-DWG-10-0034-A3 Sheet 1 of 2 √ Propose to relocate 20-PSV-2006 to the hihest point at pipereck on bundwall area
57 20-PSV-2011 Butane Backloading Pump To Jetty A (20-P-306 A/B) Discharge Header TTU2-20-DWG-10-0034-A3 Sheet 1 of 2 √
58 20-PSV-2002 Butane Recirculation Return Line to T-301 TTU2-20-DWG-10-0034-A3 Sheet 2 of 2 √ Propose to relocate 20-PSV-2002 to the hihest point at pipereck on bundwall area
59 20-PSV-2010 Butane Backloading Pump To Jetty B (20-P-302 A/B) Discharge Header TTU2-20-DWG-10-0034-A3 Sheet 2 of 2 √
60 20-PSV-1012 Propane Truck Filling Pump (20-P-204 A/B) Discharge Header TTU2-20-DWG-10-0037-A3 √
61 20-PSV-1013 Butane Truck Filling Pump (20-P-304 A/B) Discharge Header TTU2-20-DWG-10-0038-A3 √
62 20-PSV-1109 Propane BOG Condensate Pump (20-P-201 A/B/C) Discharge Header TTU2-20-DWG-10-0045-A3 Sheet 2 of 2 √
63 20-PSV-2109 Butane BOG Condensate Pump (20-P-301 A/B/C) Discharge Header TTU2-20-DWG-10-0046-A3 Sheet 2 of 2 √
Thermal expansion case to accommodate idle fluid along the piping from Mixer M-401 to
64 40-PSV-3105 Outlet LPG Metering (40-M-401) to LPG Storage Tank (V-101/V-102) TTU2-40-DWG-10-0050-A3 Sheet 3 of 3 √
V-101/102 during LPG transfer directly to Jetty B/C
65 50-PSV-5001 LPG Liquid Truck Loading Arm (50-LA-001) TTU2-40-DWG-10-0054-A3 Sheet 1 of 3 √ √
66 50-PSV-5002 LPG Liquid Truck Loading Arm (50-LA-002) TTU2-40-DWG-10-0054-A3 Sheet 1 of 3 √ √
67 50-PSV-5003 LPG Liquid Truck Loading Arm (50-LA-003) TTU2-40-DWG-10-0054-A3 Sheet 2 of 3 √ √
68 50-PSV-5004 LPG Liquid Truck Loading Arm (50-LA-004) TTU2-40-DWG-10-0054-A3 Sheet 2 of 3 √ √
69 50-PSV-5005 LPG Liquid Truck Loading Arm (50-LA-005) TTU2-40-DWG-10-0054-A3 Sheet 3 of 3 √ √
RELIEF CASE IDENTIFICATION SCENARIO
Cause of Overpressure
Blocked Outlet
Power Failure
Gas Blowby
Overfilling
Fire Case
70 50-PSV-5006 LPG Liquid Truck Loading Arm (50-LA-006) TTU2-40-DWG-10-0054-A3 Sheet 3 of 3 √ √
71 50-PSV-5007 Propane Metering System for Truck Filling (50-TM-007) TTU2-50-DWG-10-0055-A3 √ √
72 50-PSV-5008 Butane Metering System for Truck Filling (50-TM-008) TTU2-50-DWG-10-0055-A3 √ √
73 60-PSV-6402 Inlet line of LPG Marine Loading Arm Jetty B (70-MLA-101) TTU2-70-DWG-10-0057-A3 √ √
74 70-PSV-6401 Inlet line of LPG Marine Loading Arm Jetty C (70-MLA-102) TTU2-70-DWG-10-0057-A3 √ √
75 70-PSV-6601 Inlet line of Propane Marine Loading Arm Jetty B (70-MLA-202) TTU2-70-DWG-10-0058-A3 √ √
76 70-PSV-6602 Inlet line of Butane Marine Loading Arm Jetty B (70-MLA-302) TTU2-70-DWG-10-0058-A3 √ √
77 80-PSV-6501 Inlet line of Propane Marine Loading Arm Jetty A (70-MLA-201) TTU2-70-DWG-10-0059-A3 √
78 80-PSV-6502 Inlet line of Butane Marine Loading Arm Jetty A (70-MLA-301) TTU2-70-DWG-10-0059-A3 √
RELIEF CASE IDENTIFICATION SCENARIO
Cause of Overpressure
Blocked Outlet
Power Failure
Gas Blowby
Overfilling
Fire Case
- fire case at T-201
79 10-PSV-1001 Propane Refrigerated Tank (T-201) R2 TTU2-10-DWG-10-0021-A3 √ √ √ - blocked outlet at PCV-1001,
- IVO FCV-101 (unloading case)
- fire case at T-201
80 10-PSV-1002 Propane Refrigerated Tank (T-201) R2 TTU2-10-DWG-10-0021-A3 √ √ √ - blocked outlet at PCV-1001,
- IVO FCV-101 (unloading case)
- fire case at T-301
81 10-PSV-2001 Butane Refrigerated Tank (T-301) R2 TTU2-10-DWG-10-0022-A3 √ √ √ - blocked outlet at PCV-2001,
- IVO FCV-101 (unloading case)
- fire case at T-201
82 10-PSV-2002 Butane Refrigerated Tank (T-301) R2 TTU2-10-DWG-10-0022-A3 √ √ √ - blocked outlet at PCV-2001,
- IVO FCV-101 (unloading case)