Progress Tracking Sheet-Steel Fabrication

Welding Blasting
Material Full Weld Final Delivery at
Preparation Painting/Galv
Received Done Inspection site
Complete anised
Project Area
GA Drawing

Description

Work Pack

Weighting

Individual
Man hour

Progress

Progress
(Tonage)

Overall
Quantity
Item

5% 35% 35% 15% 5% 5%

1 DWG-01 A Access P/F for ACE WP-ST01 1.9 50 0.01 100% 100% 65% 58% 49% 49% 76% 0.005
2 DWG-02 A Pipe Rack A WP-ST02 80.0 3000 0.38 100% 100% 100% 100% 100% 100% 100% 0.380
3 DWG-03 A Compressor P/F WP-ST03 10.0 900 0.11 100% 100% 100% 100% 100% 100% 100% 0.114
4 DWG-04 A Miscellaneous P/F WP-ST04 8.1 850 0.11 100% 100% 100% 100% 100% 100% 100% 0.108
5 DWG-05 B Valve Access P/F WP-ST05 0.5 25 0.00 100% 100% 100% 100% 100% 100% 100% 0.003
6 DWG-06 B Access P/F for Drum 10 WP-ST06 2.0 200 0.03 100% 100% 100% 100% 100% 100% 100% 0.025
7 DWG-07 B Access P/F for Drum 15 WP-ST07 2.5 225 0.03 100% 100% 100% 100% 100% 100% 100% 0.028
8 DWG-08 B Access P/F for Drum 25 WP-ST08 5.0 450 0.06 100% 100% 100% 100% 100% 100% 100% 0.057
9 DWG-09 B Pipe Rack B WP-ST09 60.0 2200 0.28 100% 100% 100% 100% 100% 100% 100% 0.278

Progress Summary by Project Area-Steel Fabrication

Weighting
Man hour

Progress

Progress
(Tonage)

by Area
Project

Overall
Quantity
Area

Progress is
updated using
data from Steel
A 100 4800 0.61 100% 60.6% Tracker Sheet
B 70 3100 0.39 100% 39.2%
Total 170 7900 1.00 99.9%

Developed by Toolbox4Planning
Learn more at http://www.toolboxforplanning.com
Progress updating Section Progress Calculation Section
GA Fabrication Welding Blasting \Welding Full Blasting
Assembly Member Weight Material Full Weld Final Delivery at Material Final Delivery at
Item Drawing Description Drawing Revsion Member Type Finished Preparation Painting/G Prep Weld Painting/
Drawing No (Kg) Received Done Inspection site Received Inspection site
No Date Complete alvanised Complete Done Galvanised
Column
1 Access platform for Air Cool Exchanger DWG-01 DWG-01C01 Rev01 Column C01 120 16-Jan-10 10-Jan-10 10-Jan-10 10-Jan-10 15-Jan-10 16-Jan-10 17-Jan-10 120 120 120 120 120 120 Beam
2 Access platform for Air Cool Exchanger DWG-01 DWG-01C02 Rev01 Column C02 120 26-Jan-10 10-Jan-10 20-Jan-10 22-Jan-10 25-Jan-10 26-Jan-10 27-Jan-10 120 120 120 120 120 120 Horizontal Bracing
3 Access platform for Air Cool Exchanger DWG-01 DWG-01C03 Rev01 Column C03 120 26-Jan-10 10-Jan-10 20-Jan-10 22-Jan-10 25-Jan-10 26-Jan-10 27-Jan-10 120 120 120 120 120 120 Vertical Bracing
4 Access platform for Air Cool Exchanger DWG-01 DWG-01B01 Rev01 Beam B01 100 26-Jan-10 10-Jan-10 20-Jan-10 22-Jan-10 25-Jan-10 26-Jan-10 27-Jan-10 100 100 100 100 100 100 Handrail
5 Access platform for Air Cool Exchanger DWG-01 DWG-01B02 Rev01 Beam B02 100 26-Jan-10 10-Jan-10 20-Jan-10 22-Jan-10 25-Jan-10 26-Jan-10 27-Jan-10 100 100 100 100 100 100 Ladder
6 Access platform for Air Cool Exchanger DWG-01 DWG-01B03 Rev01 Beam B03 100 26-Jan-10 10-Jan-10 20-Jan-10 22-Jan-10 25-Jan-10 26-Jan-10 27-Jan-10 100 100 100 100 100 100 Staircase
7 Access platform for Air Cool Exchanger DWG-01 DWG-01H01 Rev01 Horizontal Bracing H01 80 26-Jan-10 10-Jan-10 20-Jan-10 22-Jan-10 25-Jan-10 26-Jan-10 27-Jan-10 80 80 80 80 80 80
8 Access platform for Air Cool Exchanger DWG-01 DWG-01H02 Rev01 Horizontal Bracing H02 80 30-Dec-99 10-Jan-10 20-Jan-10 22-Jan-10 25-Jan-10 80 80 80 80 0 0
9 Access platform for Air Cool Exchanger DWG-01 DWG-01H03 Rev01 Horizontal Bracing H03 80 30-Dec-99 10-Jan-10 20-Jan-10 22-Jan-10 25-Jan-10 80 80 80 80 0 0
10 Access platform for Air Cool Exchanger DWG-01 DWG-01H04 Rev01 Horizontal Bracing H04 80 26-Jan-10 10-Jan-10 20-Jan-10 22-Jan-10 25-Jan-10 26-Jan-10 27-Jan-10 80 80 80 80 80 80
11 Access platform for Air Cool Exchanger DWG-01 DWG-01V01 Rev01 Vertical Bracing V01 70 26-Jan-10 10-Jan-10 20-Jan-10 22-Jan-10 25-Jan-10 26-Jan-10 27-Jan-10 70 70 70 70 70 70
12 Access platform for Air Cool Exchanger DWG-01 DWG-01V02 Rev01 Vertical Bracing V02 70 26-Jan-10 10-Jan-10 20-Jan-10 22-Jan-10 25-Jan-10 26-Jan-10 27-Jan-10 70 70 70 70 70 70
13 Access platform for Air Cool Exchanger DWG-01 DWG-01V03 Rev01 Vertical Bracing V03 70 10-Jan-10 20-Jan-10 23-Jan-10 70 70 70 0 0 0
14 Access platform for Air Cool Exchanger DWG-01 DWG-01V04 Rev01 Vertical Bracing V04 70 10-Jan-10 20-Jan-10 23-Jan-10 70 70 70 0 0 0
15 Access platform for Air Cool Exchanger DWG-01 DWG-01L01 Rev01 Ladder L01 100 10-Jan-10 20-Jan-10 100 100 0 0 0 0
16 Access platform for Air Cool Exchanger DWG-01 DWG-01L02 Rev01 Ladder L02 100 10-Jan-10 20-Jan-10 100 100 0 0 0 0
17 Access platform for Air Cool Exchanger DWG-01 DWG-01S01 Rev01 Staircase S01 140 10-Jan-10 20-Jan-10 140 140 0 0 0 0
18 Access platform for Air Cool Exchanger DWG-01 DWG-01S02 Rev01 Staircase S02 140 10-Jan-10 20-Jan-10 140 140 0 0 0 0
19 Access platform for Air Cool Exchanger DWG-01 DWG-01HR01 Rev01 Handrail HR01 50 10-Jan-10 20-Jan-10 50 50 0 0 0 0
20 Access platform for Air Cool Exchanger DWG-01 DWG-01HR02 Rev01 Handrail HR02 50 10-Jan-10 20-Jan-10 50 50 0 0 0 0
21 Access platform for Air Cool Exchanger DWG-01 DWG-01HR03 Rev01 Handrail HR03 50 10-Jan-10 20-Jan-10 50 50 0 0 0 0
22 Access platform for Air Cool Exchanger DWG-01 DWG-01HR04 Rev01 Handrail HR04 50 10-Jan-10 20-Jan-10 50 50 0 0 0 0

Progress Summary for each GA drawing


GA Drawing

Weight (Kg)

Preparation

Painting/Ga
Finish Date
Fabrication

Delivery at
Inspection
Complete

Full Weld
Received

lvanised
Blasting
Welding
Material

Done

Final

site
No

Item Drawing Description

1 Access platform for Air Cool Exchanger DWG-01 1940 26-Jan-10 100% 100% 65% 58% 49% 49%

Developed by Toolbox4Planning