No NRV
Note: NRV's and isolation valve direction is as per P & Id.
(D) Blind,spacer,spectacle blind checklist Test pack no: FL-02-02
Up stream Gasket Downstream gasket
Sr.No Blind no. Size MOC Type Remarks
MOC Rating MOC Rating
1 B07/150 2" O/SPECTACLE
2 B09/150 2" END BLIND
3 93/051 1" O/SPECTACLE
4 94/051 1" END BLIND
5 99/051 1" O/SPECTACLE
6 98/051 1" END BLIND
7 101/051 1" O/SPECTACLE
8 100/051 1" END BLIND
9 115/051 1" O/SPECTACLE
10 114/051 1" END BLIND
11 117/051 1" C/SPECTACLE
12 116/051 1" END BLIND
13 007/052 1" C/SPECTACLE
14 008/052 1" END BLIND
15 009/052 1" C/SPECTACLE
16 011/052 1" END BLIND
17 012/052 1" C/SPECTACLE
18 013/052 1" END BLIND
19 014/052 1" C/SPECTACLE
20 015/052 1" END BLIND
21 016/052 1" C/SPECTACLE
22 017/052 1" END BLIND
23 019/052 1" C/SPECTACLE
24 020/052 1" END BLIND
25 025/052 1" C/SPECTACLE
26 024/052 1" END BLIND
27 026/052 1" C/SPECTACLE
28 027/052 1" END BLIND
(E) Control valve / XV checklist: Test Pack No:FL-02-02
Tag No Fail position Size MOC Direction Leack test Mechanical Stok check Remarks
Sr.No Hydrotest Applicable Y/N of Bonet / check
Gland
No Control Valve
(F) Orifice plate Checklist: Test pack No:FL-02-02
Gasket
Mechanical Drain instrument Loop
Sr.No Tag No Size Upstream Downstream Orientation
check Hole check
Remarks
No Orifice
(G) PSV checklist: Test pack No:FL-02-02
No PSV
Remarks
(H) Field instrument check list Test pack no:FL-02-02
Sr.No. Tag No. PT/TT/PG/TG/FT/LT/AT Discription Instrument check Range MOC Leack Test Box up Remarks
No Instruments