You are on page 1of 12

REPUBLIC OF THE PHILIPPINES

NATIONAL IRRIGATION ADMINISTRATION


REGION IX
Zamboanga del Sur Irrigation Management Office

MASS PRE-CONSTRUCTION
CONFERENCE

April 20, 2023


PROJECT PROFILE
BAG-ONG BAROY SOLAR
PUMP IRRIGATION PROJECT
GENERAL LAYOUT
GENERAL LAYOUT
PROPOSED PROJECT

- Main Canal

- Lateral Canal

- Creek
(Water source of the irrigation
project)
PROJECT DESCRIPTION
PROJECT NAME: BAG-ONG BAROY SOLAR PUMP IRRIGATION PROJECT
PROJECT DESCRIPTION: Construction of Solar Power Pumps Irrigation & Facilities,
Intake Structure, Canalization, & Canal Structures
TOTAL PROJECT COST: Php 24,272,000.00
MODE OF IMPLEMENTATION: CONTRACT WORKS (PACKAGE 1 & 2)
PROJECT DURATION: 365 CALENDAR DAYS
LOCATION: BAG-ONG BAROY, SOMINOT, ZAMBOANGA DEL SUR
FUND SOURCE: EGPIP SOLAR - CY 2023
NEW AREA (Has): 50

6
PROJECT DESCRIPTION – PACKAGE 1
PROJECT NAME: BAG-ONG BAROY SOLAR PUMP IRRIGATION PROJECT
PROJECT DESCRIPTION: Construction of Solar Power Pumps Irrigation & Facilities
TOTAL PROJECT COST: Php 8,632,524.07
MODE OF IMPLEMENTATION: CONTRACT WORKS (PACKAGE 1)
CONTRACTOR: D’ BROTHERS INTERNATIONAL TRADING CORP.
LOCATION: BAG-ONG BAROY, SOMINOT, ZAMBOANGA DEL SUR

7
SCOPE OF WORK – PACKAGE 1
1. CONSTRUCTION OF INTAKE, PUMP FACILITIES, SUPPLY & INSTALLATION OF
SOLAR PUMPS.
2. CONSTRUCTION OF CONTROL SYSTEM PUMP HOUSE, SOLAR MOUNTING
STRUCTURE AND PERIMETER FENCE.
2.A. Control System Pump House

2.B. Solar Mounting Structures


2.C. Perimeter Fence
3. SUPPLY, DELIVERY, AND INSTALLATION OF SOLAR PV & PUMPING SYSTEM
WITH COMPLETE ACCESSORIES & PUMPING TEST (SURFACE WATER)
3.a. PUMP – 2 units
3.b. SOLAR PANELS FOR 2 UNITS/7.5 HP PUMP – 2 units
3.c. SOLAR INVERTER/CONTROLLER PER UNIT/7.5 HP PUMP – 54 units
3.d. PV COMBINER BOX – 1 unit
3.e. TESTING/INSTALLATION/COMMISSIONING – 1 lot
8
PROJECT DESCRIPTION – PACKAGE 2
PROJECT NAME: BAG-ONG BAROY SOLAR PUMP IRRIGATION PROJECT
PROJECT DESCRIPTION: Construction of Canal & Canal Structures
TOTAL PROJECT COST: Php 14,584,061.70
MODE OF IMPLEMENTATION: CONTRACT WORKS (PACKAGE 2)
CONTRACTOR: MJMARI BUILDERS AND DEVELOPMENT CORP.
LOCATION: BAG-ONG BAROY, SOMINOT, ZAMBOANGA DEL SUR

9
SCOPE OF WORK – PACKAGE 2

CANALIZATION: CANAL STRUCTURES:

Main Canal – 1,986 m Main Canal – 19 nos


Lateral A – 1,020 m Lateral A – 13 nos
PROJECT COST BREAKDOWN
PACKAGE 1: Php 8,386,819.95
PACKAGE 2: Php 14,584,061.70
CONTRACT SUPERVISION: Php 677,325.50
IDP: Php 364,080.00
CONSTRUCTION SURVEY: Php 259,712.85
______________________________________________________
TOTAL: Php 24,272,000.00

11
THANK YOU!

12