2020 S4HANA 세미나 성공적인 전환 전략 및 서비스 2020 7월 배포본
2020 S4HANA 세미나 성공적인 전환 전략 및 서비스 2020 7월 배포본
S/4HAHA
구현 방법론은? Analytics 전략은? 프로젝트의 최적의 Infra
Best Practice 는 기술적 품질향상 방안은?
Data Aging 전략은? 아키텍처 전략?
어떻게 사용하는지 ?
(Cloud 환경 or
자체 서버)
1. S/4HANA Transition 유형
2. S/4HANA 구축 전 고려사항
3. S/4HANA 구축 시 고려사항
시스템 통합 or
분리를 해야 하나요?
신규 Yes
고객
Typical questions:
No
Do current business processes support your long-term strategy?
Can you adopt SAP Best Practices or will you retain past customizations?
Yes
Is your move to SAP S/4HANA driven by the business or IT?
custom tailored
Can you convert from SAP ERP to SAP S/4HANA in a single step?
Greenfield migration Selective data Do you require previous transactional data in the new system?
(New implement.) transition Is landscape consolidation and process harmonization a key value driver?
Can your company sustain a multi-year innovation plan with incremental innovations?
● 특징 : Reusing
● 예시: 기존 SAP ECC 프로세스를 새로운 SAP
S/4HANA로 그대로 전환함
● Tool : SAP Software Update Manager (SUM)
● 특징 : High Reengineering
● 예시: 새로운 프로세스로 SAP S/4HANA 신규 혹은 재
구축
● Tool: SAP S/4HANA Migration Cockpit
SAP S/4HANA 퍼블릭 클라우드 SAP S/4HANA 프라이빗 클라우드 SAP S/4HANA 온프레미스
고객 요구사항: 고객 요구사항: 고객 요구사항:
• 퍼블릭 클라우드의 모든 이점을 갖춘 • 기존 ECC 환경을 최신의 클라우드 기반 • 애플리케이션 및 데이터 환경의 완벽한
완전한 SaaS ERP 솔루션 아키텍처로 빠르게 전환. 제어
• 가장 빠른 혁신 경로와 가장 낮은 TCO • 신규 구축과 시스템 컨버젼 방식 모두 가능. • 퍼블릭 클라우드 또는 프라이빗 클라우드
오퍼링에서 해결할 수 없는 고객별 요구를
• 클라우드 ERP 솔루션 기반으로 • 기존의 온프레미스 애플리케이션의 유연성과
관리
신규 구축 방식 클라우드환경의 서브스크립션기반 두 가지
환경의 장점을 모두 누릴 수 있음. • 기존 자체 IT 인프라, 또는 IaaS 공급업체
• 표준화된 SAP Best Practices 를 활용한
활용
비즈니스 프로세스를 재설계. • Partner Add-on 을 포함한 포괄적 ERP 기능
활용 • 산업 및 국가별 규제 요구사항을 준수
S/4 S/4
HANA
ECC HANA
Any DB Any DB
Any DB
✓ Master Data 구조 or 값 변경
– 비교적 짧다 – 비교적 길다
❑ 다운타임
Conversion test
안
Preparat Explore Realization Deploy Preparat SANXBOX Deplo 안정
정 DEV Test
ion (설계) (구축) (이행) ion Test y 화
화
Project
Plan Project
Plan
System Conversion with additional/full scope of Business Process Transformation (‘Big Bang‘)
Project Initial Business Further Business
preparation Technical Migration Process Process
Transformation Transformation
4
months months
5 6
months
8
months
10 11 12 14 45
months months months months months
Canadian gold Multinational • In the State-owned • 28 power plants $11bn utility Global O&G Global metals
mining company manufacturer and Netherlands. electric utility • Integration into providing energy in Global major. 140- & mining major
with operations distributor of • Consolidation of suppling 95% of a unified full 15 countries on 4 manufacturer of strong with over $7bn
in Turkey. electricity and Shell’s South Africa’s preventive continents. window coverings greenfield in revenue and
gas. disparate IT electricity serving maintenance Consolidated and architectural project while vertical
$209M in landscapes 5.2 million program various ERP ceiling products. building the integration
revenue $87B in revenue, (see the customers. • Management of instances into one organization (mining and
70,000 detailed story). assets, single global ERP $3.2B in revenue, (from the smelting).
Leading low-cost employees in 34 $11.4B in revenue, including on SAP S/4HANA 22,750 employees previous JV
gold producer. countries. 48,000 employees budgeting, and HEC. in 100 countries. into Significant
in 653 South execution and independent transition with
Growth via African locations. fixed assets Savings exceeding Growth via operations). SAP S/4HANA,
emission free capitalization $4.5m per year. technology HCM and other
renewable Performed • Goal: cost innovation and solutions.
electricity 100,380 effective supply M&A. See detailed
generation. household of energy to story.
© 2020 SAP SE or an SAP affiliate company. All rights reserved. ǀ PUBLIC
electrification residential and 26
(2017) commercial
S/4HANA 구축 전 고려사항
S/4HANA Transition Path
S/4HANA 구축 준비
S/4HANA 전환 절차
S/4HANA Yes
신규 상세설계
Transition 구축
구축 (PI)
Option 선택
운
Plan
영
No
Conversion Conversion &
Assessment Landscape
& 반영 Transformation
컨버젼 진단은 현재 시스템 상태가 요구사항에 맞지 않고 기술적으로 복잡하거나, Cost가 오히려 과다 발생하
는 사례가 있어 반드시 사전 점검 필요함
진단 항목
▪ 아래의 경우, 별도진단을 통하여 맞춤형
컨버젼의 conversion 진행
표준 Conversion
복잡성 진단
방식인가 ? ✓ ECC : S/4HANA instance = N:N
(효율성)
✓ 특정 Data 만 옮기고자 할때 한
✓ 일부 프로세스만 Reengineering 개
라
Business SAP 컨설팅
Downtime에 • 표준 컨버젼 방식으로 총 Downtime 시간이 도
과다하게 예측될 경우, 별도의 전략 필요 필요
문제가 없는지? NO
이
면
컨버젼 • System Requirements check (Unicode 등)
선결 작업이 • SAP Readiness check 실행 및 실행 결과 Action
간단한가 ? Plan 수립
시스템 Conversion 방식은 Cutover 때 Downtime이 장시간 발생하므로, 비지니스 Impact 등을 고려하여
이에 대한 전략 수립 필요
Cut-Over 일정
고객의 BW extractors
메모리와 디스크 size → 와 idocs 이 SAP
아카이빙 전후의 잠재적 S/4HANA 환경하에 잘
size 동작하는지
잠정적인 Business
현재 시스템 기반하에 Process Improvement
사용 권고되는 Fiori 내용
Apps
Readiness check
Add-ons are used to extend SAP Business Suite functionality Maintenance Planner
There are different classification on add-ons:
• By Vendor: • By Deployment scenario:
SAP Add-On Side-by-side
3rd party Add-On Co-deployed
3rd Party
Add-Ons Add-On
S/4HANA Add-On
SAP S/4HANA
SAP NW
Add-Ons NW
System
NW
If you plan to use the add-on on S/4HANA in a co-deployment scenario check. SAP Note 2214409 - SAP S/4HANA: Compatible Add-Ons
If an add-on is no longer required, please check with the vendor if a package for uninstalling the add-on is available. See SAP Note 2011192 -
- Uninstallation of ABAP add-ons
© 2020 SAP SE or an SAP affiliate company. All rights reserved. ǀ PUBLIC 34
2. S/4HANA 구축 Plan & 준비 기존 ECC 사용고객 기준
Security
Continuous Ensure the maximum Continuous
Improvement security of your data Delivery
across the complete
Includes all activities to Covers all areas to
solution
reduce the TCO and maintain the optimal
improve the benefit
operations of the
realization of the People.
Operations Control solution
solution
Center Organization.
Processes
Implement a central team
to control the operations Set-up and optimization
including processes, tools of the operations and
and documentation support organization
E2E
Hybrid
Operation
Solution/ System Solution Operation
Management s Platform
Core operational Set-up and optimization
activities to keep the of operation platform
lights on
Continuous Operations Health Check
Regular assessment of the overall operational
challenges for scoping and planning
Operation Phase
© 2020 SAP SE or an SAP affiliate company. All rights reserved. ǀ PUBLIC 39
2. S/4HANA 구축 Plan & 준비
고려 사항 > 기타
2 연계시스템 프로그램 수정 점검
▪ S/4HANA로 신규구축 및 전환시, BW 등은 추출 source 시스템 table이 바뀌므로 수정 필요.
▪ Simplification 및 기능 변경/삭제로 인한 Interface 프로그램 및 legacy 시스템 영향도 점검
4 Conversion의 경우,
▪ CVI (Customer and vendor integration)
▪ DVM (Data Volume Management) - Historical data archiving
▪ Resolve data inconsistencies in Finance (SAP Note 2714344 and 2755360)
▪ 과거 프로젝트 결과물인 통합 Test 시나리오 등 준비 (optional)
© 2020 SAP SE or an SAP affiliate company. All rights reserved. ǀ PUBLIC 42
2. S/4HANA 구축 Plan & 준비
요약
New Implementation의 경우, 일부 항목은 PI 단계에 수행될 수 있음
5 • 프로젝트 조직
• 프로젝트 Resource 산정 (예산)
수행 계획 • 프로젝트 일정 (Test 횟수) 정의
• Down-Time 이슈 점검
S/4HANA 구축방법론은 신규 on-premise, 신규 Cloud 구축, 컨버젼 방식에 따라, SAP 특화된 Activate 방법
론을 적용하여 빠르게 구축함
S/4HANA 전환 절차
S/4HANA Yes
신규 상세설계
Transition 구축
구축 (PI)
Option 선택
운
Plan
영
No
Conversion Conversion &
Assessment Landscape
& 반영 Transformation
✓ Activate 구축 방법론
- S/4HANA on-premise 구축 방법론
- S/4HANA cloud 구축 방법론
- S/4HANA conversion 방법론
© 2020 SAP SE or an SAP affiliate company. All rights reserved. ǀ PUBLIC 47
S/4HAHA 구현 시 사용하는 새로운 SAP 방법론은
무엇인가요?
42 39
Country/Region Versions Languages
Australia, Austria, Belgium, Brazil, Canada, China, Czechia, Denmark, Finland, France, Arabic, Bulgarian, Catalan, Chinese (simplified), Chinese (traditional), Croatian, Czech, Danish,
Germany, Hong Kong, Hungary, India, Indonesia, Ireland, Italy, Japan, Luxembourg, Malaysia, Dutch, English, Estonian, Finnish, French, German, Greek, Hebrew, Hindi, Hungarian, Italian, J
Mexico, Netherlands, New Zealand, Norway, Philippines, Poland, Portugal, Romania, Russia, apanese, Kazakh, Korean, Latvian, Lithuanian, Malay, Norwegian, Polish, Portuguese, Romani
Saudi Arabia, Singapore, South Africa, South Korea, Spain, Sweden, Switzerland, Taiwan, an, Russian, Serbo-Croatian, Slovak, Slovenian, Spanish, Swedish, Thai, Turkish, Ukrainian,
Thailand, Turkey, United Arab Emirates, United Kingdom, United States Vietnamese
• SAP Note 2769531 - SAP S/4HANA 1909: Release Information Note
• SAP Note 2799003 - SAP S/4HANA 1909: Restriction Note
New in 1909
© 2020 SAP SE or an SAP affiliate company. All rights reserved. ǀ PUBLIC 52
SAP Best Practices for SAP S/4HANA 1909
Business Area in Line of Business - 1909 Best Practice Explorer https://rapid.sap.com/bp/#/BP_OP_ENTPR
4 4. UX Activation and Design • Fiori Apps Reference Library • UX Activation and UX Design
4
Identify customer specific requirements which de • User Experience Design Guidelines • UX Advisory Service for Business Value
viate from Fiori standard configuration • UI Technology Guide
• Build Tool
6 6. Gap Validation/Design Review • Focused Build (SAP Solution Manager) • Gap Validation
Perform a quality review of identified gaps and d • Design Evaluation
elta design documents
77. Data Volume Design • DVM Workcenter of SAP Solution Manager • Data Volume Design
Agree on a data volume management strategy t
1 which data is stored in which storage
hat defines
location and for how long
10
4 Design
1010. Integration • Integration Solution Advisory Methodology • Fit Gap Analysis and Delta Design
11 Detail and document all integration aspects of th (ISA-M) • SAP Interface Management
e project, that have been identified in the Prepar • SAP Cloud Platform Integration Suite • Integration Validation
e phase and in fit / gap. • Integration Directory in SAP Solution
Manager
1111. Analytics Design • SAP Best Practices for Analytics with SAP • Analytics Design Workshop
customers can further enhance their analytics inf S/4HANA
rastructure with regards to new reporting options
that have been introduced with SAP S/4HANA.
1212. Test Planning • SAP Solution Manager Test Suite • Test Planning
consider and plan the testing cycles required to • SAP S/4HANA On Premise Value Map Learn
mitigate production support issues; evaluate the ing Journey – Realize
existing test and quality management • SAP Test Management Best Practice
processes, create test cases and scripts
1 / DEV Setup/Conversion
1313. Sandbox • Installation Guide • Platform Execution Enablement
technically set up sandbox environment • Conversion Guide • System Installation for SAP S/4HANA
• Maintenance Planner (tool and user guide) • System Conversion for SAP S/4HANA
• SUM (tool and guide) • SAP Fiori Platform Setup
• Minimized Downtime Service
Fit to BP
BP 준비
(Fit to Standard)
Solution Solution Configuration &
SAP Best Practices Data cleansing
Solution Design 통합
Deploy GoLive
(기능, 마스터) Test
Planning
개발/
개발항목
Interface 개발
Scope 정의, 정의
구축 전략
Analytics 수립 분석 / Report Sprint 1
(분석, UI/UX) … Sprint 2, 3
요건정의 (Modeling, 개발)
UI/UX … Sprint 2, 3
UI 표준설계 UX/UI (List) 설계 Sprint 1
Fiori Launch Pad, 화면 & Odata
Technical
SANDBOX 환경 개발 환경 품질, 운영 환경
준비 PI / 설계 준비 구축 (Realization, Deploy)
PI 상세 구축단계
Milestone
수행계획 수행계획
과제 과제 & 프로세스 Value 관리
PI 설계 상세 설계
Fit & GAP,
ERP BP
솔루션/Master 구축
검토 구축예산 통합
설계
개발/ 확정, Test 통합 Dep
Interface 개발항목 개발 GoLive
Test loy
Enhancem Enhancement 설계 구축인력
ent 준비 개발
(Modeling, 화면, 프로그램) 준비
Analytics 분석요건
Sprint 1 Sprint 2, 3,..
정의
UI 표준설계 UX/UI (List)
UI/UX Sprint 1
기술요소 확정 설계 Sprint 2, 3,..
SANDBOX 환경
Technical 개발 환경 품질, 운영 환경
Tech 설계
© 2020 SAP SE or an SAP affiliate company. All rights reserved. ǀ PUBLIC 73
S/4HANA New implementation (주요 Workstream만 표시함)
S/4HANA 구축을 고려한 PI
BP (SAP Best Practices )
준비 PI 상세설계 고려 사항
Mile- 종료보고
팀, WBS Kick-off 중간보고
stone O SAP Best Practice 기반으로 검토
구축 계획 수립
현상분석 과제정의
O To-Be 설계시 상세 Activity level까지
PI (전략, 자료) Solution Mapping 되어야함.
및 To-Be설계 To-Be 설계
산업 BP 정리 (Level 3) (Level 4, 5) O 분석영역
- 분석화면, Report 설계, Logical CDS
SAP Best 솔루션 솔루션 설계 View 설계가 완료되어야 함
ERP & Mapping (Fit/GAP, 개발항목, Data 설계)
Practices
(분석)
검토 분석 설계 (Embedded Analytics) O UI/UX영역
- UI/UX 상세 설계가 완료되어야 함 –
개발 화면표준, Fiori Launch pad 설계,
개발 항목
시스템 권한설계, 화면 & Odata List
Fiori Launch Pad, 화면 & Odata
S/4HAHA 구현 시 SAP S/4HANA Migration Cockpit (MC)를 사용한 데이터 마이그레이션을 권고함.
Legacy System Migration Workbench (LSMW)사용은 더 이상 권고하지 않음.
Test Cycle 1
컨버젼 사전Check Cycle 2 Cycle 3 Cycle n
SANDBOX Test
사전 점검 Conversion 결과 점검
Data conversion
SAP Readiness Check &
Simplification Item Catalog
Simplification
Item Check
⚫ Should be run by the customers manually in advance and will be run by SUM when starting the conversion.
⚫ To enable the simplification item checks, SNOTE needs to support TCI’s follow the instruction in SAP Note 2187425 to setup
⚫ The first execution of the simplification item check could take a long time depending on the database size (i.e. 7 –15 days)
⚫ The simplification item check execution time can be improved by:
✓ Database parameters
✓ Additional indexes
✓ Suppressing some checks, for this case it is recommended that this checks are done at least once to fix any inconsistencies before suppressing the checks
Usage tracking of custom Remote ATC to check for ABAP Development Tune performance of
Semi-automatic custom code adaptation code in production SAP S/4HANA-related Tools (ADT) for Eclipse critical database queries
(SCMON/SUSG or UPL) changes (Simplification DB) by using SQL Monitor
(SQLM)
New SAP Fiori app to detect New SAP Fiori app for Quick fixes for semi-
unused code with automated efficient custom code automated custom code
removal via SUM analysis adaptation
⚫ SAP Note 2219527 - Notes about using views BSID, BSAD, BSIK, BSAK, BSIS, and BSAS in customer-defined programs in
SAP S/4HANA Finance
✓ Read BSEG/BKPF directly
✓ Avoid executing small SELECT statement so many times, e.g. SELECT SINGLE in LOOP
✓ Avoid “SELECT*”, but select only necessary fields.
⚫ SAP Note 2221298 - Notes about using views GLT0, FAGLFLEXT, FMGLFLEXT, PSGLFLEXT, and JVGLFLEXT in custom
programs in SAP S/4HANA Finance
✓ Read ACDOCA directly (use FM FINS_ACDOCA_BW_EXTRACT_DATA)
⚫ SAP Note 2185026 - Compatibility views COSP, COSS, COEP, COVP: How do you optimize their use?
✓ Avoid Joining large table to Compatibility View
✓ Avoid “SELECT*”
✓ Avoid executing small SELECT statement so many times, e.g. SELECT SINGLE in LOOP
✓ Avoid too large SELECT Statement
✓ Data of Value Type=4 should be read from ACDOCA.
⚫ SAP Note 2337368 - Inventory Valuation (part of Materials Management -Inventory Management) : Change of data model in
S/4HANA 1610
• 커스텀 코드 개발, 관리와 관련한 거버넌스 및 관리 방법론을 확정하여 향후 운영 단계에서도 개발에 따른 TCO를 저감시킬 수 있음
주요 일정 Conversion 범위
인터페이스 관련 권고 사항 예시 Exception 권고 사항 예시
주요 일정 Conversion 범위
2 4 5 8 9 10 14
Additional Launchpad Pre-
Project team Sandbox UX gaps Notifications
apps beyond design and production
1 교육 setup* development setup 16
BP scope configuration setup
3 15 0.5 10 2 5 15 Go-live and
Planning
3 6 7 11 12 13 15 support
2 Sandbox Fit-gap Custom Integration Production
UX advisory QA setup 2
unit testing analysis theming testing setup
5 15 10 5 15 15 15
- Project manager - Project team - Functional team - Functional team - Basis team
Profiles
- Review - UX enablement - SAP S/4HANA configuration - SAP S/4HANA configuration - Technical - Go-live and support
Activities
architecture sessions - Front-end server (FES) - FES configuration configuration - Knowledge transfer
- Fit-gap analysis - UX advisory configuration - Web dispatcher configuration - Production (KT) sessions
planning - Web dispatcher configuration security settings
- Roles and security configuration
- Review UX scope - Fit-gap analysis - Documentation
- Roles/groups/catalogs configuration
options included - Cutover
- Unit testing - Notifications setup
- Integration testing
Pilot test
UX/UI 표준
대상 선정 선정 기준
(Device,Template) SAP GUI
Design Plan
Thinking
UX 개발환경 Module별 Web GUI
(Tool, 기술,
전환대상 선정
UI Build 및 방법론..)
Test
SAP Fiori app
아키텍쳐
평가 (FES)
(User 경험, 개발
생산성)
© 2020 SAP SE or an SAP affiliate company. All rights reserved. ǀ PUBLIC 100
인력 역량 강화 Roadmap
Case : A사 Conversion
Planning 실행단계 고도화
단계
201X.1~3 201X.4 ~ 201X.2 201X.3 ~
新 시스템에 대한 새로운 시스템에 대한 교육을 통한 기술 습득 및 변화 관리, 역량 강화를 바탕으로
목표
이해 제고 여러 차례의 테스트 경험을 통한 역량 내재화 주도적 과제 수행
PI 및
운영팀 (2) 맞춤형 정규 아카데미
현재 보유 학습 후 지속 역량
역량 평가 역량 평가 보유 평가
As-Is 영향도
분석을 통한 S/4HANA Extended
기초응용 기능 교육
개인/그룹 역량 별
역량 보완 및 심화 교육
맞춤형 교육
© 2020 SAP SE or an SAP affiliate company. All rights reserved. ǀ PUBLIC 101
Lesson Learned
S/4HANA 구축 후
1. Plan 단계 때, 구축 목적 및 방향성 수립 후 추진
✓S/4HANA 구축 목적, Next Roadmap, Vision 명확화 필요 (특히 기존 SAP 고객의 경우)
✓S/4HANA Discovery 단계 때 S/4HANA 기능, 기술 특징 파악 및 방향성 수립하고 추진 → 분석영역, UI/UX
영역에서 ECC 방식으로 구축 사례 많음
2. 인력 Skill-up
✓구축~운영시, S/4HANA 기술요소 (특히, 특히 HANA DB 운영 기술) 에 대한 준비
✓S/4HANA에 적합한 ABAP 개발 Rule이 표함 된 개발 표준 및 개발자들의 교육 (FIORI 개발 표준 포함)
✓S/4HANA 신규 및 Simplification 프로젝트 전 숙지
✓SAP Incident handling Skill 매우 중요(다음 페이지 참조)
© 2020 SAP SE or an SAP affiliate company. All rights reserved. ǀ PUBLIC 103
S/4HANA 구축 및 운영을 위한 SAP Service
1. 성공적인 S/4HANA 구축을 지원하기 위한 SAP 서비스 (Value Assurance)
Discovery & Deploy
Explorer Realize
Preparation
© 2020 SAP SE or an SAP affiliate company. All rights reserved. ǀ PUBLIC 106
4. S/4HANA 역량 강화 교육 서비스
역량 강화를 위한 서비스 방안
역량 강화 필요성 역량 강화 추진 방향성 역량 강화 방법
SAP VAS/
교육서비스
▪ SAP S/4HANA 및 새로운 플랫폼의
▪ 혁신과 변화를 이끄는 S/4HANA
및 SAP 플랫폼 관련 신기술 이해
기본 사상을 이해하고 적용할 수 On-the-Job Training
있는 역량 강화 방안 마련 프로젝트 계획 및 실행 단계에서의
기초 이해
SAP
▪ 내부 역량을 상향 평준화하고, ▪ 지속적인 프로세스 개선 및 혁신을 교육서비스
주도적으로 혁신을 이끌 수 있는 주도할 수 있는 전문가로서의 역량 맞춤 교육 Consulting
역량 확보 강화 방안 마련 S/HANA 표준 기반의 사
공통필수→선택심화→전문성확장
3단계 교육
SAP
▪ 베스트 프랙티스 기반의 표준 ▪ 체계적이고 견고한 역량 강화 교육서비스
프로세스, UX, 데이터 모델링, 프로그램을 통해 역량 확보가 역량 평가 Consulting
분석과 같은 새로운 역량을 시급한 우선순위를 정하고 사
현재 보유 역량-학습 후 역량-지속
가지고 비즈니스에 효율적으로 영역별로 필요 역량 강화 활동에
역량 점검
활용 집중
© 2020 SAP SE or an SAP affiliate company. All rights reserved. ǀ PUBLIC 107
4. S/4HANA 역량 강화 교육 사례
S/4HANA 교육 서비스 (정규, Delta) 사례.
B01~B04 TM 디
어
비즈니스 프로세스 통합 이해 과정
A11
S/4HANA B01~B04 B11~B15 과정 자
S/4HANA
기초 과정
향 량 Security &
시 A21
HANA
기본
HANA
기본
평 HANA HANA 학습 후,
평
I
가 Admin 역량 상 Authorizati
스 과정 1 과정 2
Admin
심화 과정 평가 가
o
on 과정
기본 과정 을 T
템 위 기
C31~C33
신 업 학습 후, 학습 후,
한 및 본
SAP S/4HANA Technology 기본 과정
© 2020 SAP SE or an SAP affiliate company. All rights reserved. ǀ PUBLIC 108
Thank you.
Contact information:
Kim, Sungwhan
sung.whan.kim@sap.com
별첨 : Where to find up-to-date information?
© 2019 SAP SE or an SAP affiliate company. All rights reserved. ǀ INTERNAL 110
S/4HANA RIG Knowledge Assets
New or Updated in Sep/Oct/Nov 2019
• SAP S/4HANA Currency Setup • SAP Fiori for SAP S/4HANA – Understanding Insight to • An use case of Characteristic Dependent Planning (CDP) in
Action app-to-app navigation PP/DS for SAP S/4HANA in the Automotive Pre-Series busin
• Conversion to SAP S/4HANA- Insights into Finance D
ata Migration • SAP Fiori for SAP S/4HANA – Adding Export to Excel t ess
o a standard SAP Fiori elements app using a Adaptatio
• SAP Credit Management in S/4HANA (1909)
n Project
• Advantages of Deactivating statistical moving averag • Fiori for S/4HANA – Upgrading from Fiori 2.0 to Fiori 3 f • SAP S/4HANA – Process & key considerations to upload dat
e price in SAP S/4HANA or SAP S/4HANA Cloud 1908 and SAP S/4HANA 1909 a for PM objects using LTMC (Part -1 Functional Locations)
• Sizing information for “BPC for S/4HANA” with FAQs Users
• SAP S/4HANA – Process & key considerations to upload dat
• Cost Budget and Availability Control on SAP ECC, an • SAP Fiori transition from Standalone to Embedded Depl a for PM objects using LTMC (Part -2 Task Lists)
d S/4 On premise oyment in SAP S/4HANA
• Conversion to SAP S/4HANA – How to handle errors • SAP Fiori for SAP S/4HANA - Identifying classic user in • Data migration of PM objects using LTMC data modeler