COLUMN

(VERIFY SCHEDULE)
COLUMN MAIN BARS
(VERIFY SCHEDULE)

COLUMN TIES
(VERIFY SCHEDULE)

40

WIDTH (VERIFY SLAB-ON-GRADE REBARS


BEAM SCHEDULE)
FINISHED FLOOR LEVEL REBARS ALONG "Y"
(VERIFY SCHEDULE)

100
BEAM SCHEDULE)

NATURAL GRADE LINE (NGL)


DEPTH (VERIFY

REBARS ALONG "X"


(VERIFY SCHEDULE)

100mm THICK GRAVEL BEDDING

"Y", WIDTH (VERIFY SCHEDULE)


ON WELL-COMPACTED SOIL COLUMN
(VERIFY SCHEDULE)
FOOTING TYPE BEAM (FTB)

(VERIFY SCHEDULE)
"D" EMBEDMENT OF FOOTING

(VERIFY REINFORCEMENTS)
COLUMN TIES
(VERIFY SCHEDULE)

(VERIFY SCHEDULE)
50 100 100 100

TOP BARS ALONG "Y"


(VERIFY SCHEDULE)
75
TOP BARS ALONG "X" (VERIFY SCHEDULE)
(VERIFY SCHEDULE)
40
(VERIFY SCHEDULE)
"T" THICKNESS

BOTTOM BARS ALONG "Y"


(VERIFY SCHEDULE)
40 BOTTOM BARS ALONG "X"
(VERIFY SCHEDULE)
100 75

BOTTOM OF COLUMN FOOTING


100mm THICK GRAVEL BEDDING
ON WELL-COMPACTED SOIL
"X", WIDTH (VERIFY SCHEDULE)
"X", WIDTH (VERIFY SCHEDULE)
PLAN
SECTION
FOOTING DETAILS, 1:10M.