One-Line Diagram - OLV1=>LVMDP-2.1 & 2.

2 (Load Flow Analysis)


BusWay19
BusWay13
65 kA
6300 A CB44 CB43
2000 A
65 kA
LVMDP 2.1
4200 A
0.38 kV
175 kA 126.1 kVA 70.2 kVA 327.7 kVA
70 kA 70 kA CB146 SW2
193.4 A 107.7 A CB47 502.5 A
CB144 CB56
500 A 500 A 200 A
30 kA 89.54% PF 85.28% PF 35 kA 50 kA PF
91.03% 100 kA
Spare Breaker3 Spare Breaker15 150 A 500 A 5000 A
Cable50 2.87 % Vd 0.0 kA
1-4/C 70 Cable45 2.26 % Vd Cable5
70 kA Cable12 5-4/C 300
Cable6 1-4/C 300 10-4/C 300
500 A PP-COMP-1 1-4/C 70 1.56 % Vd SDP HYDR-A
2250.38
A kV 122.5 kVA 0.38 kV
Spare Breaker14 94 kA CB145 600 A 320.2 kVA
500 A 193.4 A PP PUMP--A CB128 502.5 A
36 kA
70 kA 89.22% PF 0.38 kV 500 A MDP GD-12
91.35% PF 0.38
5000kVA CAP2
Cont1 225 A CB45 69.1 kVA 100 kA
CB54 1x1400 kvar
90 kA 65 A 107.7 A 205 kA3200 A
36 kA 85% PF 320.2 kVA 50 kA
502.5 A
91.35% PF

PLN & EDG LOAD PUMP-A


55.29 kVA 2941.2 kVA
Motor Comp-1 HYDRANT-A PLN Load-GD.12
79 kW
211 kW

BusWay20
BusWay14

CB101 CB82
6300 A 2000 A
65 kA 65 kA
LVMDP 2.2
4200 A
0.38 kV 50.8 kVA 50.9 kVA 246.6 kVA
175 kA
36 kA 77.8 A 77.8 A 377.3 A CB71 SW4
36 kA 50 kA
160 A 160 A 85.02% PF
CB100 85.01% PF
CB85 84.99% PF 3200 A
Spare Breaker4 50 kA 50 kA
Spare Breaker17 2000 A 2000 A 0.0 kA
Cable17 0.176 % Vd Cable3
36 kA 10-4/C 300 5-4/C 300
160 A Cable25 0.151 % Vd Cable15 0.06 % Vd
6-4/C 300 6-4/C 300 MDP GD-07
Spare Breaker16 3000 A
MDP GD-15 0.38 kV 246.2 kVA
MDP GD-16 0.38 kV 105 kA
50.9 kVA 377.3CB70
A CAP4
0.38 kV CB69A 1000
3200
50.8 kVA 77.9 A 85% PF A 1x1600 kvar
50 kA 42 kA
CB98 CB99 77.8 A 85% PF
3200 A 125 A 85% PF CB49 CB48
50 kA 50 kA 3200 A 125 A 50 kA
50 kA
PLN Load-7 EDG Load-7
1647.1 kVA 197.6 kVA
PLN Load-16 EDG Load-16
1125 kVA 41.18 kVA PLN Load-15 EDG Load-15
1125 kVA 41.18 kVA

page 1 12:57:28 Mar 20, 2021 Project File: TEST1