Sr. No.

Achievement
Prepared SOP for Pre commissioning and commissioning
1 for transfer of crude from crude oil storage tanks to
CDU/VDU.

Prepared and delivered a presentation aimed at educating


2
new joinees about the offside facilities at HRRL.

Collected P&ID , GAD , DATASHEET , TENDER


3
DOCUMENT for offsite facilities.

Provided Comments to include CCTV , Hydrocarbon


4 detectors , OWS Connections in 90% model for Crude Oil
Storage Tanks.

Provided Comments on Format -1 of Mangla Crude


5
Receipt Station & SV-1 Station .

6 Provided Comments on Format -1 of POMS.

Awarded third place in the “What Can Go Wrong


7
Workshop” Quiz of Flare.

Prepared the top sheet document for Crude Oil Storage


8 Tanks in view of the Pre-Commissioning, Commissioning
and regular mode of operation requirements

Developed Understanding/Sketch and provided comments


9 for Transfer of Flushing Oil from Palanpur to HRRL
Tanks .

Delivered Presentation on Offsite to Flare Facilities in


10
What Can go Wrong workshop on Flare/FG
What was the Objective

To Prepare document for Transfer of Crude to Unit , which


can be used during start up.

To make new officer aware about offsite facilities available


in HRRL.

To Collect data related to all offsite facilities present in


HRRL

To Provide Comments on 90% model for Crude Oil Storage


Tanks

To Provide Comment related to Operation point of View on


Mangla Receipt Staion & SV -1 Station.

To Provide Comments on POMS format -1 with respect to


Civil structures.

To participate actively in the workshop to gain knowledge.

To keep the track of important material requirements such


as utility, manpower, electrical, instrumentation and other
miscellaneous facility like MSDS boards, safety signs,
permit system, fencing etc. in document.

To Provide Comments on Scheme for Transfer of Flushing


Oil to Refinary Units for Start up.

To improve the competency of the Commissioning group


regarding offsite to flare facilities.
What was achieved ? Constraints

Got Document which can be used during pre


commissioning and commissioning of system. Problem was identified in
identification of system .

Through field visit and PPT new joinee were able to


know more about offsite facility available in HRRL

Collected Data for offsite facilities and developed


Understanding of offsite facilities in HRRL

CCTV , Hydrocarbon Detectors , OWS connections


included in 90% Model.

Various Operation related issues were identified


and necessary comments were given for
Modifications .
Various civil related issues were identified and
neccesary comments were given to HRRL Civil for
modifications.

Participated in the Workshop and awarded by the


prize.

Top Sheet Prepared with respect to commissioning


requirement .

Comments sent for review & excecution.

Successfully completed the session along with the Difficulty in identifying offsite to
presentation and follow up activity after the flare desription as no document
workshop. availaible for process
description